 Government Orders Issued for Tsunami Relief  for the year 2006

GO No & Date GO Details
G.O.Ms.No. 835 
  Dated  20.12.2006

(Revenue Dept.)

 

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) - Execution of works with assistance from World Bank - Tsunami relief works - Municipal Infrastructure works - for five Urban Local Bodies - Proposals submitted by Commissioner of Municipal Administration - Approved by the Empowered Committee - Orders - Issued.

G.O.Ms.No. 834 
  Dated  20.12.2006

(Revenue Dept.)

 

Tsunami-Relief and Rehabilitation -World Bank aided Emergency Tsunami Reconstruction Project (ETRP) -Construction of tenements to resettle the Tsunami affected families of Chennai District -Approved by Empowered Committee -Sanction of funds -Orders issued
  G.O.Ms.No. 833 
  Dated  19.12.2006

(Revenue Dept.)

Tsunami – Relief and Rehabilitation – Tsunami Emergency Assistance Project (TEAP) - Execution of Schemes with Asian Development Bank Assistance –Rehabilitation of Tsunami affected areas in Town Panchayats – sanction accorded for a sum of Rs.9.603 Crores for Building sector under Infrastructure Development Component- Revised proposal to carryout Repairs, restoration and upgradation of existing public buildings and Roads restoration works and other innovative projects in Tsunami affected Town Panchayats from amount already sanctioned - Approved by Empowered Committee – Orders – Issued.

  G.O.Ms.No. 832 
  Dated  19.12.2006

(Revenue Dept.)

Tsunami – Relief and Rehabilitation – Tsunami Emergency Assistance Project (TEAP) - Execution of Schemes with the Asian Development Bank –Rehabilitation of Tsunami affected areas in Town Panchayats – sanction accorded for a sum of Rs.8.945 Crore for provision of Water Supply and Sanitation Component- revised proposal to carryout improvement works to the existing Water Supply, Public Toilets, Waste Water Management and Solid Waste Management in the Town Panchayats  - approved by Empowered Committee – Orders – Issued.

  G.O.Ms.No. 821 
  Dated  15.12.2006

(Revenue Dept.)

Tsunami - Relief and Rehabilitation - World Bank aided Emergency Tsunami Reconstruction Project (ETRP) and Asian Development Bank assisted Tsunami Emergency Assistance Project (TEAP) - Constitution of an Empowered Committee for Speedy implementation - Formation of a Sub Committee for issuing minor modification in proposals already approved by the Empowered Committee- Orders issued.

  G.O.Ms.No. 820 
  Dated  15.12.2006

(Revenue Dept.)

Tsunami – World Bank Funded ETRP – Reconstruction of damaged houses – Insurance coverage for tenements constructed at Semmancheri – Cost of Insurance – Proposal for sanction of funds - Approved by Empowered Committee – Orders issued.

  G.O.Ms.No. 805 
  Dated  11.12.2006

(Revenue Dept.)

Tsunami – Relief and Rehabilitation – World Bank assisted Emergency Tsunami Reconstruction Project (ETRP) – Execution of Schemes – Construction of Permanent Houses in Tsunami affected Town Panchayats areas in Villupuram District – Provision of Basic Amenities and Infrastructure facilities to new habitation – Approved by Empowered Committee – Amount Rs.2.742 Crores sanctioned – Orders – Issued.

  G.O.Ms.No. 804 
  Dated  11.12.2006

(Revenue Dept.)

Tsunami – Relief and Rehabilitation – World Bank assisted Emergency Tsunami Reconstruction Project (ETRP) – Execution of Schemes – Construction of Permanent Houses in Tsunami affected Town Panchayat areas in Kanyakumari District – Provision of Basic Amenities and Infrastructure facilities to new habitation – Additional fund approved by Empowered Committee – Amount Rs.60.00 lakhs sanctioned – Orders – Issued.

  G.O.Ms.No. 799 
  Dated  8.12.2006

(Revenue Dept.)

Tsunami – Relief and Rehabilitation – Tsunami Emergency Assistance Project (TEAP) - Execution of Schemes with the Asian Development Bank –Rehabilitation of Tsunami affected areas in Town Panchayats – Appointment of additional staff and Specialists for Directorate of Town Panchayats – personnel working in the Project Implementation Unit in the Directorate of Town Panchayats under Tsunami Emergency Assistance Project – Proposal for Project Allowance - approved by Empowered Committee – Amount Rs.9.23 lakhs – Sanctioned - Orders – Issued.

  G.O.Ms.No. 796 
  Dated  8.12.2006

Establishment – Tsunami Emergency Assistance Project assisted by Asian Development Bank – Project Implementation Unit at State Level – Sanction of  one post of Record Clerk – Orders Issued

  G.O.Ms.No. 791 
  Dated  6.12.2006

(Revenue Dept.)

Tsunami – Chennai District – Relief and Rehabilitation – World Bank aided Emergency Tsunami Reconstruction Project (ETRP) – Allotment of tenements made to tsunami victims in Semmancheri – Exemption from payment of Tamil Nadu Electricity Board Deposit – Sanction of additional sum of Rs.8,69,000/- Approved by Empowered Committee – Orders – Issued.

  G.O.Ms.No. 790 
  Dated  6.12.2006

(Revenue Dept.)

Tsunami-Emergency Tsunami Reconstruction Project (ETRP)-Execution of schemes with World Bank Assistance-Demarcation of HTL along Coast of Tamil Nadu and superimposition of HTL reference points on Village Cadastral Maps- Entrustment of consultancy services to M/s. Institute of Remote Sensing, Anna University, Chennai – Estimate of work approved by Empowered Committee- Orders-Issued.

  G.O.Ms.No. 789 
  Dated  6.12.2006

(Revenue Dept.)

Tsunami – Relief and Rehabilitation – Tsunami Emergency Assistance Project (TEAP) - Execution of Schemes under TEAP with assistance of Asian Development Bank – Rehabilitation of Tsunami affected areas in Town Panchayats – Appointment of additional staff for Directorate of Town Panchayats – Post of Financial Specialist, Community Organiser and Manager MIS Software Consultant sanctioned to the Directorate of Town Panchayats - proposal for certain modification/ ratification - approved by Empowered Committee – Orders – Issued.

  G.O.Ms.No. 785 
  Dated  5.12.2006

(Revenue Dept.)

Tsunami Emergency Assistance Project (TEAP) assisted by the Asian Development Bank – Implementation of Livelihood Support Programme for the Tsunami affected persons in Urban Local Bodies – Proposals approved by Empowered Committee – Amount of Rs.372.60 lakhs sanctioned – Orders – Issued.

  G.O.Ms.No. 784 
  Dated  5.12.2006

(Revenue Dept.)

Tsunami - Tsunami  Emergency Assistance Project (TEAP)- Execution of Schemes with the Asian Development Bank assistance - Formation of Tsunami Project Implementation Unit (TPIU) at State Level and District Implementation Unit (DPIU) at District Level - Continuance of staff for two more years - Orders - Issued.

  G.O.Ms.No. 744 
  Dated  16.11.2006

(Revenue Dept.)

Natural Calamities - Tsunami - Tiruvallur District - Payment of monthly rent to 87 shelters for one year - Rs.5,22,000/- sanctioned form Calamity Relief Fund - Orders - Issued.

  G.O.Ms.No. 742 
  Dated  16.11.2006

(Revenue Dept.)

Natural Calamities - Tsunami - Tmt. Kunjammal Thomas, Charthala, Kerala State - Relief assistance to her damaged Mini Bus - Rs.84,461/- - Sanctioned from Calamity Relief Fund - Orders Issued.

  G.O.Ms.No. 741 
  Dated  16.11.2006

(Revenue Dept.)

Natural Calamities - Tsunami - Chennai District - Tsunami affected families resettled at Tamil Nadu Housing Board Celcrete Factory, Ernavur - Maintenance of Electrical Works - Appointment of 1 wireman and 1 helper privately - for Electrical maintenance work - Rs.1,47,180/- Sanctioned from Calamity Relief Fund - Orders - Issued.

  G.O.Ms.No. 740 
  Dated  16.11.2006

(Revenue Dept.)

Natural Calamities - Tsunami - Nagapattinam District - Acquisition of land for construction of houses - additional fund Rs.3,56,00,000/- Sanctioned from Calamity Relief Fund - Orders - Issued.

  G.O.Ms.No. 738 
  Dated  16.11.2006

(Revenue Dept.)

Natural Calamities - Tsunami – Vilupuram District – Settlement of claims of Educational Institutions towards Tuition fees and Special fees Rs.17 lakhs - sanctioned from Calamity Relief Fund– Orders – Issued.

  G.O.Ms.No. 735 
  Dated  16.11.2006

(Revenue Dept.)

Natural Calamities - Tsunami  - Nagapattinam District - Sterilized Tsunami victims under gone Recanalisation Operation Relief assistance   Rs.35,378/-  sanction from CRF/NCCF - Orders Issued.

  G.O.Ms.No. 728 
  Dated  9.11.2006

(Revenue Dept.)

Natural Calamities - Tsunami – Chennai District – Family Welfare Programme sterilized Tsunami victim undergone primary operation specified as reproductive procedure – Reimbursement of hospital expenses Rs.10,102/- sanctioned from Calamity Relief Fund / National Contingency Fund – Orders – Issued.

  G.O.Ms.No. 708 
  Dated  28.10.2006

(Revenue Dept.)

Tsunami 2004 - Construction of houses to families living in thatched houses, poorly constructed houses and non-engineered structures in coastal districts of Tamil Nadu - Formation of survey teams and sanction of funds - Orders - Issued.

  G.O.Ms.No. 689 
  Dated  18.10.2006

(Revenue Dept.)

Tsunami - Relief and Rehabilitation - World Bank assisted Emergency Tsunami Reconstruction Project (ETRP) - Execution of schemes – Construction of Permanent Houses in Tsunami affected areas in Town Panchayats – Provision of Basic Amenities and Infrastructure facilities to new habitation - Approved by Empowered Committee – Amount Rs.11.7089 Crores sanctioned - Orders - issued.

  G.O.Ms.No. 670 
  Dated  10.10.2006

(Revenue Dept.)

Tsunami - Relief and Rehabilitation – Damages caused to temporary huts – Families displaced from their homes – Temporary accommodation provided near their original homes – Repairs to   damaged roofs and infrastructure facilities already provided – Rs.2000/- per shelter – Assistance from Calamity Relief Fund – Sanctioned – Orders – Issued – Inclusion of sanction and expenditure in World Bank aided Emergency Tsunami Reconstruction Project (ETRP) – Administrative Sanction for Rs.5.4636 crore – Orders – Issued.

  G.O.Ms.No. 668 
  Dated  10.10.2006

(Revenue Dept.)

Tsunami - Tsunami Emergency Assistance Project (TEAP) - Execution of Schemes by the Tamil Nadu Maritime Board with Asian Development Bank Assistance - Rehabilitation of Tsunami affected Port - Procurement of Dredger for Nagapattinam/Cuddalore Port at a cost of Rs.7.00 Crore - Approved by Empowered Committee - Amount sanctioned - Orders - Issued.

  G.O.Ms.No. 658 
  Dated  5.10.2006

(Revenue Dept.)

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by the World Bank - Construction of Sewerage treatment plant for the Permanent shelters constructed at Akkaraipettai in Nagapattinam - Proposal cleared by the Empowered Committee - Rs.120.00 lakhs - Amount sanctioned - Orders - Issued - G.O. cancelled.

  G.O.Ms.No. 646 
  Dated  28.9.2006

(Revenue Dept.)

TSUNAMI – Relief and Rehabilitation – World Bank aided Emergency Tsunami Reconstruction Project (ETRP) – Construction of Permanent houses  - Provision of Basic amenities to the new habitations in Kancheepuram, Tirunelveli, Tiruvallur and Cuddalore districts  –Sanction of  Rs.1364.205 lakhs - Orders – Issued.

  G.O.Ms.No. 586 
  Dated  7.9.2006

(Revenue Dept.)

Tsunami – Relief and Rehabilitation – Tsunami Emergency Assistance Project (TEAP) - Execution of schemes with Asian Development Bank assistance - Rehabilitation of Tsunami affected areas in Town Panchayats Livelihood Component - Funds for the year 2006-07 - Rs.6.385 Crores - Sanctioned -Orders - Issued.

  G.O.Ms.No. 573 
  Dated  5.9.2006

(Revenue Dept.)

Tsunami – Tsunami Emergency Assistance Project (TEAP) assisted by Asian Development Bank - Project Implementation Unit at State Level and District Implementation Units at District Level - Formed - Sanction of funds for 2006-07 - Orders - Issued.

  G.O.Ms.No. 549 
  Dated  25.8.2006

(Revenue Dept.)

Tsunami – Emergency Tsunami Reconstruction Project – Fisheries Department – Appointment of Consultants to advice the execution of World Bank Projects – Payment of Consultant fee – Sanctioned – Amendment – Issued.

  G.O.Ms.No. 538 
  Dated  21.8.2006

(Revenue Dept.)

Tsunami - Relief and Rehabilitation - World Bank aided Emergency Tsunami Reconstruction Project (ETRP) and Asian Development Bank assisted Tsunami Emergency Assistance Project (TEAP) – Formation of office to accommodate Project Management Unit - Renovation of Fifth Floor Ezhilagam Annex Building  for the use of   Project Management Unit - Rs.84.80 lakhs - Amount - Sanctioned - Orders - Issued.

  G.O.Ms.No. 531 
  Dated  14.8.2006

(Revenue Dept.)

Tsunami - Relief and Rehabilitation – World Bank aided Emergency Tsunami Reconstruction Project (ETRP) - Construction of permanent shelters - Statutory clearances – Environmental & Social Impact Assessment (EIA) study - Preparation of Guideline document on sanitation for  permanent shelters   – Appointment of  consultants - Selected - Work orders issued - Consultancy fees  -  Rs.1,11,91,686/- Sanctioned - Orders - Issued.

  G.O.Ms.No. 529 
  Dated  14.8.2006

(Revenue Dept.)

Tsunami - Relief and Rehabilitation - Tsunami Emergency Assistance Project (TEAP) - Execution of schemes with the Asian Development Bank Assistance - Rehabilitation of Tsunami affected areas in Town Panchayats – Hiring vehicles for the Directorate of Town Panchayats - Proposal approved by the Empowered Committee- Amount sanctioned - Orders - Issued.

  G.O.Ms.No. 528 
  Dated  14.8.2006

(Revenue Dept.)

Tsunami – TEAP assisted by Asian Development Bank - Formation of Project Implementation Unit at State Level and District Implementation Units (DIU) at District Level – Post of Engineering Specialist – Thiru.R.Rathinaraj, Chief Engineer (Retired) - Appointed on contract basis – Payment of monthly Allowance of Rs.9000 – Orders - Issued.

  G.O.Ms.No. 526 
  Dated  11.8.2006

(Revenue Dept.)

Tsunami – Relief and Rehabilitation – World Bank aided Emergency Tsunami Reconstruction Project (ETRP) -Sanction of Special Staff for Nagapattinam, Kanniyakumari, Cuddalore, Chennai, Kancheepuram and Villupuram to attend to Tsunami Relief and Rehabilitation Measures – Continuance of Staff upto 31.12.2006 - Budget Provision for 2006-07 – Rs. 1,34,03,000 – Sanctioned – Orders - Issued.

  G.O.Ms.No. 523 
  Dated  11.8.2006

(Revenue Dept.)

Establishment -  G.O.

 

 G.O.Ms.No. 158 
  Dated  1.3.2006

(Revenue Dept.)

TSUNAMI – Relief and Rehabilitation – World Bank aided Emergency Tsunami Reconstruction Project (ETRP) - Construction of permanent houses – Provision of basic amenities to the new habitations in Thoothukudi, Villupuram and Kanniyakumari districts - Administrative Sanction for Rs. 1400.47 Lakhs - Orders - Issued.

 G.O.Ms.No. 146 
  Dated  7.2.2006

(Revenue Dept.)

TSUNAMI – TSUNAMI EMERGENCY ASSISTANCE PROJECT (TEAP) – Execution of schemes by the Fisheries Department with the Asian Development Bank assistance – Hiring of Consultancy services for preparing detailed plans, concept note and carrying out the social and environmental studies of fishing harbour for works to be taken under TEAP – Rs. 25.00 Lakhs –Amount sanctioned-orders issued.

 G.O.Ms.No. 145 
  Dated  7.2.2006

(Revenue Dept.)

TSUNAMI - ETRP - aided by World Bank - Animal Husbandry Department - Reconstruction of Veterinary Institutions – Provision of additional fund for constructing Veterinary Dispensaries of Kancheepuram district - Approved by Empowered Committee - Rs.50 lakhs - Amount sanctioned - Orders - Issued.

 G.O.Ms.No. 144 
  Dated  7.2.2006

(Revenue Dept.)

TSUNAMI - ETRP - aided by World Bank - Animal Husbandry Department – Purchase of equipments, furniture, etc for tsunami damaged Veterinary Institutions and Fodder bank - approved by Empowered Committee - Administrative sanction - Orders - Issued.

 G.O.Ms.No. 143 
 Dated  7.2.2006

(Revenue Dept.)

TSUNAMI - ETRP - aided by World Bank - Animal Husbandry Department - Construction of 13 District Veterinary Extension Centres and provision of Infrastructure facilities - approved by Empowered Committee – Rs.360 lakhs - Amount sanctioned - Orders - Issued.

 G.O.Ms.No. 142 
 Dated  27.2.2006

(Revenue Dept.)

TSUNAMI - ETRP - aided by World Bank - Animal Husbandry Department - Reconstruction of 70 sub-centre buildings and provision of Infrastructure facilities - approved by Empowered Committee – Rs.157.92 lakhs - Amount sanctioned - Orders - Issued.

 G.O.Ms.No. 138
  Dated  24.2.2006

(Revenue Dept.)

Tsunami 2004 – Relief and Rehabilitation - World Bank Aided Emergency Tsunami Reconstruction Project (ETRP) - Reclamation of Tsunami affected Horticultural lands in Cuddalore, Villupuram, Nagapattinam and Kanyakumari districts - Proposal approved by Empowered Committee - Rs.100.473 lakhs - Amount sanctioned - orders - issued.

 G.O.Ms.No. 137 
 Dated  24.2.2006

(Revenue Dept.)

Tsunami 2004 – Relief and Rehabilitation - World Bank Aided Emergency Tsunami Reconstruction Project (ETRP) - Reclamation of Tsunami affected Agriculture lands (ROTAAL) in Kancheepuram, Cuddalore, Villupuram, Nagapattinam and Kanyakumari districts - Reclamation of sand cast and saline Agriculture lands - Proposal approved by Empowered Committee - Rs.1269.05` lakhs - Amount sanctioned - orders - issued.

 G.O.Ms.No. 132 
 Dated  23.2.2006

(Revenue Dept.)

Tsunami - Tsunami Emergency Assistance Project (TEAP) - Execution of schemes with the Asian Development Bank (ADB) assistance by the Highways Department - Construction of 5 High level Bridges in Tsunami affected areas in Cuddalore, Nagapattinam and Tiruvallur Districts - Engaging of Consultancy firms for the preparation of Detailed Project Report, Environmental Management Plan, Resettlement Action Plan and Bid Document - Approved by Empowered Committee - Rs.49.43 lakhs - Amount sanctioned - Orders - issued.

 G.O.Ms.No. 131 
 Dated  23.2.2006

(Revenue Dept.)

Establishment -  G.O.