 Government Orders Issued for Tsunami Relief  for the year - 2008

GO No & Date GO Details Departments / Districts
G.O Ms No.753
Date :31-12-2008
Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Tamil Nadu Slum Clearance Board - Sanction of Project Allowance at 10% of Basic Pay and Dearness Pay to the staff working in the three Divisional Offices in Tamil Nadu Slum Clearance Board under World Bank assisted Emergency Tsunami Reconstruction Project (ETRP) - Approved by Sub-Committee - Orders- Issued TNSCB
G.O Ms No.752
Date :31-12-2008
Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Tamil Nadu Slum Clearance Board - Tsunami Planning Co-ordination and Monitoring Cell - Upgradation of Community Development Officer as Chief Community Development Officer - Approved by Sub-Committee - Sanctioned - Orders - Issued TNSCB
G.O Ms No.746
Date :29-12-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) - Execution of schemes with World Bank assistance - Emergency Tsunami Reconstruction Project (ETRP) Divisions in Tamil Nadu Slum Clearance Board - Enhancement of vehicle hiring charges - Approved by Sub-Committee - Orders - Issued

TNSCB
G.O Ms No.745
Date :29-12-2008

Establishment -  G.O.

PMU
G.O Ms No.744
Date :29-12-2008

Establishment -  G.O.

TNSCB
G.O Ms No.741
Date :24-12-2008

Establishment -  G.O.

TNSCB
G.O Ms No.739
Date :23-12-2008

Tsunami 2004 - Rajiv Gandhi Rehabilitation Package - Construction of NGO backed out houses and Vulnerable houses under Rajiv Gandhi Rehabilitation Package and Emergency Tsunami Reconstruction Project funded by World Bank - Revision of Unit Cost from Rs.2.38 lakhs to Rs.2.78 lakhs per house - Approved by Empowered Committee - Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.735
Date :23-12-2008

Establishment -  G.O.

PMU
G.O Ms No.732
Date :22-12-2008

Establishment -  G.O.

RD & PR
( TPIU )
G.O Ms No.731
Date :22-12-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Purchase of 500 copies of report on "International Conference on Tsunami Disaster Management and Coastal Development" from Madras Development Society, Chennai - Approved by Empowered Committee - Sanctioned - Orders - Issued.

PMU
G.O Ms No.730
Date :18-12-2008

Establishment -  G.O.

PMU
G.O Ms No.729
Date :-18-12-2008

Establishment -  G.O.

Fisheries
G.O Ms No.727
Date :17-12-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Dredging of the fishing harbour at Pazhayar in Nagapattinam District - Permission to utilize the funds from the sanctioned amount - Approved by Empowered Committee - Granted - Orders - Issued.

PWD
( Building )
G.O Ms No.724
Date :17-12-2008

Establishment -  G.O.

RD & PR
( TPIU )
G.O Ms No.722
Date :16-12-2008

Establishment -  G.O.

CMA
G.O Ms No.721
Date :16-12-2008

Establishment -  G.O.

CMA
G.O Ms No.720
Date :16-12-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Provision of basic amenities and infrastructure facilities at permanent shelters in Tsunami affected Town Panchayats of Kottakuppam of Villupuram District, Tharangambadi, Velankanni of Nagapattinam District and Reethapuram, Mandaikadu, Palapallam, Manavalakurichi of Kanniyakumari District - Approved by Empowered Committee - Sanction of additional funds - Orders - Issued.

Town Panchayats
G.O Ms No.716
Date :15-12-2008

Tsunami Rehabilitation Project - Reconstruction of vulnerable houses - Reconstruction within 200m from High Tide Line and houses constructed under IAY and other Government schemes within 1000m from High Tide Line areas which are more than 10 years old as on 1.1.2006 under Rajiv Gandhi Rehabilitation Package - Appointment of suitable NGOs as Third Party Facilitators for undertaking task of enhancing awareness, capacity, empowerment and involvement of beneficiaries in reconstruction of vulnerable houses - Approved by Empowered Committee - Sanction of funds - Orders - Issued - Amendment - Issued.

PMU
G.O Ms No.713
Date :15-12-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Sanction of funds for Rs.1,73,000/- for defraying the expenses of Thiru K.S.Kandasamy, District Revenue Officer (Relief and Rehabilitation), Nagapattinam for attending the training course on "End-to-End Multi-Hazard Early Warning System" held between 15th to 26th September 2008 at Asian Disaster Preparedness Centre, Bangkok, Thailand - Approved by Empowered Committee - Orders - Issued.

PMU
G.O Ms No.712
Date :12-12-2008

Tsunami 2004 - Relief and Rehabilitation - Tsunami Emergency Assistance project (TEAP) – Execution of schemes with Asian Development Bank assistance – Permitting use of Hired vehicles sanctioned for Commissionerate of Town Panchayats and for District for further period upto 31.3.2009 – Approved by Sub-Committee - Orders - Issued.

Town Panchayats
G.O Ms No.710
Date :12-12-2008

TSUNAMI – Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank – Sanction of staff to Project Implementation Unit (PIU) at State Level and in 11 District Implementation Units (DIUs) at District Level in Rural Development and Panchayat Raj Department from 1.11.2008 to 31.12.2010 – Approved by Sub-Committee – Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.709
Date :11-12-2008

Establishment -  G.O.

TNSCB
G.O Ms No.708
Date :11-12-2008

Establishment -  G.O.

Town Panchayats
G.O Ms No.707
Date :11-12-2008

Establishment -  G.O.

Town Panchayats
G.O Ms No.701
Date :06-12-2008

Tsunami - Tsunami Rehabilitation Programme - Purchase of 43 ready built tenements constructed by Tamil Nadu Slum Clearance Board at Okkiyam-Thoraipakkam allotted to 43 tsunami affected families - Sanction of Rs.54.74 lakhs from Rajiv Gandhi Rehabilitation Package - Approved by Empowered Committee - Orders – Issued.

TNSCB
G.O Ms No.700
Date :06-12-2008

Establishment -  G.O.

RD & PR
( TPIU )
G.O Ms No.699
Date :06-12-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Reconstruction of vulnerable houses in rural areas under Rajiv Gandhi Rehabilitation Package in Phase-II housing programme - Increase in number of in-situ houses from 15530 to 17212 - Provision of rent and one time shifting allowance - Sanction of funds of Rs.1,17,74,000/- - Approved by Empowered Committee - Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.698
Date :06-12-2008

Tsunami – Tsunami Emergency Assistance Project (TEAP) assisted by Asian Development Bank – Sanction of hired vehicles to 12 District Implementation Units of Rural Development and Panchayat Raj Department – Approved by Sub-Committee - Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.697
Date :06-12-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Tamil Nadu Slum Clearance Board - Enhancement of rental allowance of 3000 Tsunami affected families of Marina Project from Rs.750/- to Rs.1000/- per month for 21 months and payment of one time shifting allowance of Rs.1000/- at a total cost of Rs.6.60 crore - Approved by Empowered Committee - Sanctioned - Orders - Issued.

TNSCB
G.O Ms No.694
Date :05-12-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Rising Shelterbelt Plantation in private lands during 2008-2009 in tsunami affected coastal areas of Tamil Nadu, upkeep of plantations upto 2010-2011 and continuance of Emergency Tsunami Reconstruction Project (ETRP) Cell upto December 2010 in the office of the Principal Chief Conservator of Forests - Approved by Empowered Committee - Amount Sanctioned - Orders - Issued.

Forests
G.O Ms No.656
Date :18-11-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Sanction of additional staff to the Urban Local Bodies - Further continuance of posts beyond 17.10.2008 - Salary of the staff for the period from 18.10.2008 to 31.10.2008 - Amount Sanctioned - Orders - Issued.

CMA
G.O Ms No.598
Date :17-10-2008

Tsunami - Relief and Rehabilitation - Tsunami Emergency Assistance Project (TEAP) - Execution of schemes with Asian Development Bank assistance - Rehabilitation of Tsunami affected areas in Town Panchayats - Sanction of funds for providing economic assistance to disabled persons in 19 Tsunami affected Town Panchayats - Orders - Issued.

Town Panchayats
G.O Ms No.584
Date :07-10-2008

Establishment -  G.O.

PMU
G.O Ms No.553
Date :20-09-2008

Tsunami - Reconstruction of vulnerable houses in urban areas by Tamil Nadu Slum Clearance Board under Rajiv Gandhi Rehabilitation Package in Phase-II housing programme - Hike in construction cost per houses as per the schedule of rate for the year 2008-2009 from Rs.2.38 lakh to Rs.2.75 lakh and increase in number of houses - Sanction of additional amount - Approved by Empowered Committee - Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.538
Date :09-09-2008

Tsunami – Emergency Tsunami Reconstruction Project (ETRP) – Execution of schemes with World Bank assistance – Sanction of Additional Staff for Tsunami Planning Co-ordination and Monitoring Cell in Tamil Nadu Sum Clearance Board - Approved by Sub-Committee - Orders - Issued.

TNSCB
G.O Ms No.535
Date :05-09-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Forest Department - Suggestion received from Students Sea Turtle conservation Network, Chennai - Uproot of Casuarinas Plantations planted in the coastal area of Nagapattinam and Chengalpet Divisions - Approved by Empowered Committee - Sanction of funds - Orders - Issued.

PMU
G.O Ms No.532
Date :02-09-2008

Tsunami - Tsunami Emergency Assistance Project (TEAP) assisted by Asian Development Bank - Rural Development and Panchayat Raj Department - Up-gradation of the post of Joint Director to the level of Additional Director – Approved by Sub-Committee - Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.529
Date :01-09-2008

Tsunami – Construction of 1392 tenements under Rajiv Gandhi Rehabilitation Package, in Hindustan Lever Limited land and Thilagar Nagar in North Chennai and 1228 tenements in Kannagi Nagar in Okkiyam Thoraipakkam by Tamil Nadu Slum Clearance Board to the tsunami affected families of Chennai and Tiruvallur Districts - Coverage of Insurance - Sanction of amount - Approved by Empowered Committee - Orders - Issued.

TNSCB
G.O Ms No.524
Date :29-08-2008

Tsunami – Construction of houses in Phase-I housing programme by NGO - Late signing of MoU by NGOs - Provision of basic amenities to NGO constructed houses under Rajiv Gandhi Rehabilitation Package - Proposal for sanction of Rs.4.20 crore - Approved by Empowered Committee - Sanction of funds - Orders - Issued.

PMU
G.O Ms No.518
Date :26-08-2008

Tsunami 2004 – Construction of houses in vulnerable areas in Coastal Districts under Phase-II with Rajiv Gandhi Rehabilitation Package - Provision of rent and one time shifting allowance for the in-situ beneficiaries for the period of seven months - Sanction of amount - Approved by Empowered Committee - Orders - Issued.

TNSCB
G.O Ms No.511
Date :22-08-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Infrastructure Development works such as Buildings, Street Lights, Water Supply and Roads and Drains in 5 Tsunami affected Urban Local Bodies - Capital works - Revised Administrative Sanction - Approved by Empowered Committee - Additional amount sanctioned - Orders - Issued.

PMU
G.O Ms No.510
Date :22-08-2008

Establishment -  G.O.

PMU
G.O Ms No.509
Date :22-08-2008

Establishment -  G.O.

PMU
G.O Ms No.504
Date :20-08-2008

Establishment -  G.O.

TNSCB
G.O Ms No.503.
Date :20-08-2008

Tsunami – Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank – Tamil Nadu Slum Clearance Board - Construction of 2064 tenements at Okkiyam Thuraipakkam in Kancheepuram District - Administrative approval - Sanction of Rs.49.90 crores – Orders – Issued - Amendment - Issued.

TNSCB
G.O Ms No.502
Date :20-08-2008
Relief given to Mrs Santhi at Chennai district and Mrs Parvathi at Kancheepuram Dtistrict - CM Relief fund given to Rs.2,00,000 each PMU
G.O Ms No.501
Date :18-08-2008
Natural Calamities - Tsunami - Fishing boats of Tamil Nadu apprehended in Srilanka prior to Tsunami - Damage to the boats in Tsunami - Granting of Relief to boats owners Rs.228.75 lakhs - Sanctioned from Calamity Relief Fund - Further Orders - Issued. Fisheries
G.O Ms No.499
Date :14-08-2008

Tsunami – Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Revised administrative sanction for reconstruction of Veterinary Sub-Centre (7 works) in various places in Tamil Nadu - Approved by Empowered Committee - Additional amount sanctioned - Orders - Issued.

PWD
( Building )

Animal Husbandry

G.O Ms No.489
Date :11-08-2008

Establishment -  G.O.

RD & PR
( TPIU )
G.O Ms No.477
Date :31-07-2008

Establishment -  G.O.

RD & PR
( TPIU )
G.O Ms No.466
Date :25-07-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Provision of infrastructure facilities to new 3 Division Offices in Tamil Nadu Slum Clearance Board - Rs.42.00 lakhs sanctioned - Orders - Issued - Amendment - Issued.

TNSCB
G.O Ms No.464
Date :24-07-2008

Tsunami – Tsunami Emergency Assistance Projects (TEAP) assisted by the Asian Development Bank - Implementation of Water Supply Schemes and Recharge Structures by Tamil Nadu Water Supply and Drainage Board – Formation of one Division Unit with Head Quarters at Tirunelveli and two sub-divisions at Tirunelveli and Kanniyakumari already sanctioned - Further continuance of posts from 1.4.2008 to 31.3.2009 - Rs.64.40 lakh - Sanctioned – Approved by Sub-Committee - Orders - Issued.

TWAD
G.O Ms No.463
Date :24-07-2008

Tsunami - Relief and Rehabilitation – World Bank aided Emergency Tsunami Reconstruction Project (ETRP) - Construction of permanent shelters - Statutory clearances – Environmental and Social Impact Assessment (EIA) study - Preparation of Guideline document on sanitation for permanent shelters – Appointment of consultants - Selected - Work orders issued - Consultancy fees - Rs.22,40,719/- Sanctioned - Orders - Issued.

PMU
G.O Ms No.462
Date :24-07-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Execution of sanitation facility schemes to permanent shelters in Tsunami affected areas by Tamil Nadu Water Supply and Drainage Board - Continuance of the post sanctioned for the Project Monitoring Unit at head office, Chennai, 7 District Implementing Units -Approved by the Sub-Committee - Orders - Issued.

TWAD
G.O Ms No.452
Date :17-07-2008

Establishment -  G.O.

Highways
G.O Ms No.451
Date :17-07-2008

Establishment -  G.O.

RD & PR
( TPIU )
G.O Ms No.442
Date :16-07-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Purchase of Computers and accessories for the Tsunami Monitoring Cell and Planning Cell of Tamil Nadu Slum Clearance Board - Approved by the Sub-Committee - Orders - Issued.

TNSCB
G.O Ms No.432
Date :10-07-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) - Forest Department - Sanction of Rs.44.26 lakh for 2nd year (2008-2009) maintenance of 778.06 ha. of Shelterbelt and 762 ha. of Mangrove Plantations raised during the year 2006-2007 under Emergency Tsunami Reconstruction Project (ETRP) funds - Amount sanctioned - Orders - Issued.

Forest
G.O Ms No.431
Date :10-07-2008

Tsunami - Relief and Rehabilitation - Emergency Tsunami Reconstruction Project (ETRP) - Execution of Schemes with the World Bank assistance - Further continuance of Planning Co-ordination and Monitoring Cell upto 31.3.2009 in Tamil Nadu Slum Clearance Board - Approved by the Sub-Committee - Orders - Issued.

TNSCB
G.O Ms No.429
Date :09-07-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Tamil Nadu Slum Clearance Board - Sanction of Rs.24,36,000/- lakh for the supply of drinking water to 325 tsunami affected families who were resettled from Dommingkuppam to Okkiyam Thuraipakkam for a period of one year - Approved by the Empowered Committee - Orders - Issued - Amendment - Issued.

TNSCB
G.O Ms No.428
Date :09-07-2008

Tsunami 2004 - Purchase of 1228 houses constructed by Tamil Nadu Slum Clearance Board under Rajiv Gandhi Rehabilitation Package in Okkiyam Thoraipakkam to the tsunami affected families living in Thideer Nagar near Marina, Chennai - Provision of amenities - Approved by the Empowered Committee - Amount sanctioned - Orders - Issued - Amendment - Issued.

TNSCB
G.O Ms No.427
Date :09-07-2008

Tsunami - Relief and Rehabilitation - World Bank aided Emergency Tsunami Reconstruction Project (ETRP) - Rehabilitation of Tsunami affected 1858 non fishermen families residing in hutments from Nochikuppam to Srinivasapuram, in the tenements constructed at Semmenchery - Purchase of 1858 tenements - Exemption from the payment of the Tamil Nadu Electricity Board Deposit - Approved by the Empowered Committee - Amount sanctioned - Orders - Issued - Amendment - Issued.

TNSCB

TNEB

G.O Ms No.424
Date :08-07-2008

Establishment -  G.O.

PMU
G.O Ms No.423
Date :08-07-2008

Establishment -  G.O.

TNSCB
G.O Ms No.422
Date :08-07-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Tamil Nadu Slum Clearance Board - Sanction of Rs.23.77 lakhs for internal wiring and Tamil Nadu Electricity Board service deposit for providing electricity connection to 325 tenements at Okkiyam Thuraipakkam for the Tsunami affected families - Approved by the Empowered Committee - Orders - Issued - Amendment - Issued.

TNSCB

TNEB

 
G.O Ms No.421
Date :08-07-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Project Management Unit – Incurring of routine expenditure such as Hire Charges, Hospitality/Entertainment, Stationery purchase including Computer Stationery and other office expenses - Delegation of powers for sanction of expenditure – Approved by Sub-Committee - Orders - Issued.

PMU
G.O Ms No.418
Date :07-07-2008

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Provision of infrastructure facilities to new 3 Division Offices in Tamil Nadu Slum Clearance Board - Approved by Sub-Committee - Rs.42.00 Lakhs - Amount sanctioned - Orders - Issued.

TNSCB
G.O Ms No.416
Date :03-07-2008

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Tamil Nadu Slum Clearance Board - Vehicle Hiring Charges and appointment of Office Assistant to District Revenue Officer - Approved by Sub-Committee - Rs.2,28,000/- - Amount sanctioned - Orders - Issued.

TNSCB
G.O Ms No.415
Date :03-07-2008

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Tamil Nadu Slum Clearance Board - Accommodation for Sub-division Office in private building at Nagapattinam - Fixation of rent of Rs.3,500/- per month with effect from 1.10.2007 - Approved by Sub-Committee - Rs.42,000/- - Amount sanctioned - Orders - Issued.

TNSCB
G.O Ms No.413
Date :03-07-2008

Establishment -  G.O.

TNSCB
G.O Ms No.412
Date :03-07-2008

Establishment -  G.O.

CMA
G.O Ms No.411
Date :03-07-2008

Establishment -  G.O.

CMA
G.O Ms No.410
Date :03-07-2008

Tsunami- Emergency Tsunami Reconstruction Project (ETRP) - Execution of works with assistance from World Bank – Additional staff to the Urban Local Bodies - Sanctioned – Further continuance for a period of six months from 18.4.2008 to 17.10.2008 - Approved by Sub-Committee - Orders - Issued.

TNSCB
G.O Ms No.407
Date :02-07-2008

Establishment -  G.O.

PMU
G.O Ms No.405
Date :02-07-2008

Establishment -  G.O.

PMU
G.O Ms No.404
Date :02-07-2008

Establishment -  G.O.

PMU
G.O Ms No.403
Date :02-07-2008

Establishment -  G.O.

PMU
G.O Ms No.399
Date :01-07-2008

Tsunami - Relief and Rehabilitation - Tsunami Emergency Assistance Project (TEAP) - Execution of Schemes with the Asian Development Bank Assistance - Continuance of 76 posts for implementation of Tsunami for Commissionerate of Town Panchayats, Office of the Zonal Assistant Director of Town Panchayats and Town Panchayats beyond 30.4.2008 for 6 months - Further continuance - Approved by the Sub-Committee - Orders - Issued.

Town Panchayats
G.O Ms No.398
Date :01-07-2008

Tsunami - Relief and Rehabilitation - Emergency Tsunami Reconstruction Project (ETRP) - Execution of schemes with World Bank assistance in Town Panchayats areas - Appointment of additional administrative and Technical staff under Emergency Tsunami Reconstruction Project (ETRP) for the Commissionerate of Town Panchayat and in the Office of the Assistant Director of Town Panchayats in Zones - Further continuance of the posts in the Commissionerate of Town Panchayats and Junior Assistant in the Office of the Assistant Director of Town Panchayats in Zones for a period of six months - Approved by Sub-Committee - Orders - Issued.

Town Panchayats
G.O Ms No.390
Date :27-06-2008

Tsunami 2004 - Construction of houses for families living in thatched houses, poorly constructed houses and non-engineered structures in coastal districts of Tamil Nadu - Amount sanctioned - Provision of funds - Orders - Issued.

PMU
G.O Ms No.389
Date :27-06-2008

Establishment -  G.O.

PMU
G.O Ms No.388
Date :27-06-2008

Tsunami 2004 - Relief and Rehabilitation - Tsunami Emergency Assistance Project (TEAP) – Execution of schemes with Asian Development Bank Assistance – Permitting use of hired vehicles sanctioned for Commissionerate of Town Panchayats and for District for the further period upto 31.10.2008 – Approved by Sub-Committee - Orders - Issued.

Town Panchayats
G.O Ms No.385
Date :26-06-2008

Tsunami 2004 - Relief and Rehabilitation - World Bank assisted Emergency Tsunami Reconstruction Project (ETRP) and Asian Development Bank assisted Tsunami Emergency Assistance Project (TEAP) - Purchase of furniture for the use of the Project Management Unit - Provision of funds for 2008-2009 - Amount sanctioned - Orders - Issued.

PMU
G.O Ms No.384
Date :26-06-2008

Tsunami 2004 - Tsunami Emergency Assistance Project (TEAP) - Evaluation of Relief and Rehabilitation measures - Study on livelihood assistance provided to Self Help Groups (SHGs) in Tsunami affected areas to be undertaken by Evaluation and Applied Research Department - Provision of funds for 2008-2009 - Amount sanctioned - Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.382
Date :26-06-2008

Tsunami - Tsunami Rehabilitation Programme - Water and Sewerage - Installation of Power Pumps by the Tamil Nadu Water Supply and Drainage Board in the tsunami affected areas - Sanction of funds from Government of India - Orders - Issued.

TWAD
G.O Ms No.381
Date :26-06-2008

Tsunami - Tsunami Rehabilitation Programme - Water and Sewerage - Installation of Hand Pumps by the Rural Development and Panchayat Raj Department in the tsunami affected areas - Sanction of funds from Government of India - Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.376
Date :25-06-2008

Tsunami – Tsunami Emergency Assistance Project (TEAP) – Execution of works with assistance from Asian Development Bank (ADB) – Infrastructure Development works such as water supply, sanitation, Buildings, roads and drains – Cuddalore, Nagapattinam, Kannyakumari, Tiruvallur Districts – 6 Municipalities  –  Capital works – Revised Administrative sanction - Approved by Empowered Committee - Additional amount sanctioned – Orders - Issued.

CMA
G.O Ms No.373
Date :24-06-2008

Tsunami 2004 – Rehabilitation Programme - World Bank aided Emergency Tsunami Reconstruction Project (ETRP) - Rehabilitation of Tsunami affected slum families of Chennai District in the 1858 tenements constructed at Semmenchery by the Tamil Nadu Slum Clearance Board - Proposal approved by the Empowered Committee - Rs.24.154 crore - Amount sanctioned - Orders – Issued.

TNSCB
G.O Ms No.371
Date :24-06-2008

Tsunami 2004 – Emergency Tsunami Reconstruction Project (ETRP) – Execution of schemes with World Bank assistance – Construction of 2064 tenements at Okkiyum Thuraipakkam in Kancheepuram District – Proposal approved by the Empowered Committee – Administrative Approval - Sanction of Rs.49.90 crores – Orders – Issued.

TNSCB
G.O Ms No.367
Date :23-06-2008

Tsunami 2004 – Tsunami Rehabilitation Programme - Purchase of 1228 ready built tenements and their internal electrification along with the cost of Electricity Board service deposit charges at Okkiyam - Thoraipakkam - Rs.15.63 crore - Sanction from Rajiv Gandhi Rehabilitation Package - Orders – Issued.

TNSCB
G.O Ms No.342
Date :17-06-2008

Tsunami – Relief and Rehabilitation - World Bank aided Emergency Tsunami Reconstruction Project (ETRP) and Asian Development Bank aided Tsunami Emergency Assistance Project (TEAP) - Conduct of internal audit at Rural Development and Panchayat Raj Department by a firm of Chartered Accountants - Appointment of M/s. Sushil Jeetpuria & Co., Chartered Accountants, New Delhi - As Internal Auditors - Audit fees for the period from March 2005 to March 2007 - Sanction of Rs.3,00,000/- – Orders – Issued.

RD & PR
( TPIU )
G.O Ms No.340
Date :06-06-2008

Tsunami - Relief and Rehabilitation - Emergency Tsunami Reconstruction Project (ETRP) - Construction of permanent shelter - Sanitation - Consortium for DEWATS Dissemination (CDD) Society - Project Consultancy for implementation of DEWATS (Decentralized Waste Water Treatment Systems with Simplified Sewer Systems (SSS) in 23 Permanent settlements in Municipal and Town Panchayat Limits - Appointment of Consultants - Amount Sanctioned - Provision of funds for the year 2008-2009 - Orders - Issued.

PMU
G.O Ms No.328
Date :06-06-2008

Tsunami 2004 - Construction of houses under Phase I housing programme for the tsunami affected families by NGO. in Kancheepuram, Villupuram and Cuddalore Districts - Insurance to new built uninsured houses by NGOs. - Sanction of Rs.9,33,602/- and Ratification of G.O. - Orders - Issued.

PMU
G.O Ms No.327
Date :06-06-2008

Establishment -  G.O.

PMU
G.O Ms No.332
Date :04-06-2008

Establishment -  G.O.

PMU
G.O Ms No.321
Date :04-06-2008

Tsunami - Administrative sanction for the construction of 13 houses for the 13 families who were displaced during Phase I housing programme for construction of new houses under Rajiv Gandhi Rehabilitation Package housing programme - Approved by Empowered Committee - Orders - Issued.

TNSCB
G.O Ms No.319
Date :30-05-2008

Tsunami 2004 - Relief and Rehabilitation - Emergency Tsunami Reconstruction Project (ETRP) with World Bank assistance - Consultant Agency - New concept Information Systems Private Limited, Chennai, appointed - Preparation of booklet titled as "Tiding Over Tsunami - Part-II " - Printing of - Amount sanctioned - Provision of funds - Revalidation - Orders - Issued.

PMU
G.O Ms No.309
Date :27-05-2008

Tsunami 2004 - Relief and Rehabilitation - Emergency Tsunami Reconstruction Project (ETRP) - Execution of schemes with World Bank assistance - Appointment of consultancy services for Third Party Technical and Quality Auditing of building, other construction and infrastructure works undertaken by M/s. Mukesh & Associates - Amount sanctioned - Provision of funds - Orders - Issued.

PMU
G.O Ms No.259
Date :23-05-2008

Tsunami 2004 - Relief and Rehabilitation - Tsunami Emergency Assistance Project (TEAP) - Execution of schemes with the Asian Development Bank Assistance - Rehabilitation of Tsunami affected areas in Town Panchayats - Expenditure on advertisement charges for the Commissionerate of Town Panchayats - Proposals approved by the Sub-Committee - Amount sanctioned - Orders - Issued.

Town Panchayats
G.O Ms No.258
Date :23-05-2008

Tsunami 2004 - Purchase of Town Panchayats constructed by Tamil Nadu Slum Clearance Board under Rajiv Gandhi Rehabilitation Package in Okkiyam Thoraipakkam to the tsunami affected families living in Thideen Nagar near Marina, Chennai - Provision of amenities - Approved by the Empowered Committee - Amount sanctioned - Orders - Issued.

TNSCB
G.O Ms No.261
Date :23-05-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Tamil Nadu Slum Clearance Board - Sanction of Rs.11,93,400/- for payment of Tamil Nadu Electricity Board Service deposit for providing electricity connection to 468 tenements in Thazhankuppam for the Tsunami affected families - Approved by the Empowered Committee - Orders - Issued.

TNSCB
G.O Ms No.260
Date :23-05-2008

Tsunami - Relief and Rehabilitation - Tsunami Emergency Assistance Project (TEAP) - Execution of schemes with Asian Development Bank assistance - Rehabilitation of Tsunami affected areas in Town Panchayats - Self Help Groups - Bio-Metric Identification Process - Provision of Additional Funds - Approved by Empowered Committee - Amount sanctioned - Orders - Issued.

Town Panchayats
G.O Ms No.257
Date :23-05-2008

Tsunami 2004 - Relief and Rehabilitation - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Execution of schemes with the World bank Assistance in Town Panchayats areas - Contingent expenditure for the day to day administration of the scheme in the Commissionerate of Town Panchayats - Proposals approved by the Sub-Committee - Amount sanctioned - Orders - Issued.

Town Panchayats
G.O Ms No.256
Date :23-05-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Tamil Nadu Slum Clearance Board - Sanction of Rs.23.77 lakhs for internal wiring and Tamil Nadu Electricity Board service deposit for providing electricity connection to 325 tenements at Okkiyam Thuraipakkam for the Tsunami affected families - Approved by the Empowered Committee - Orders - Issued.

TNSCB

TNEB

G.O Ms No.255
Date :23-05-2008

Tsunami - Relief and Rehabilitation - World Bank aided Emergency Tsunami Reconstruction Project (ETRP) - Rehabilitation of Tsunmai affected 1858 non-fishermen families residing in hutments from Nochikuppam to Srinivasapuram, in the tenements constructed at Semmenchery - Purchase of 1858 tenements - Exemption from the payment of the Tamil Nadu Electricity Board Deposit - Approved by the Empowered Committee - Amount sanctioned - Orders - Issued.

TNSCB

TNEB

 
G.O Ms No.254
Date :23-05-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Tamil Nadu Slum Clearance Board - Sanction of Rs.24,36,000/- lakh for the supply of drinking water to 325 tsunami affected families who were resettled from Dommingkuppam to Okkiyam Thuraipakkam for a period of one year - Approved by the Empowered Committee - Orders - Issued.

TNSCB
G.O Ms No.252
Date :19-05-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Provision of basic amenities and infrastructure facilities at permanent shelters in Tsunami affected areas in Town Panchyats - Approved by Empowered Committee - Amount of Rs.74.00 lakhs sanctioned - Orders - Issued.

Town Panchyats
G.O Ms No.250
Date :15-05-2008

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) with World Bank assistance - Fisheries Department - Permission to utilize the funds already sanctioned for establishing Flake Ice Plant cum Chill Room facilities in Chinnamuttom Fishing harbour - Approved by Empowered Committee - Permission accorded - Orders - Issued.

Fisheries
G.O Ms No.246
Date :13-05-2008

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Public Works Department (Wate Resources Organisation) - Desilting Buckingham Canal (4.50 km.) in Thennampattinam, Perunthottam and Keelaiyur village in Sirkali Taluk of Nagapattinam District at a cost of Rs.174.00 lakhs - Approved by Empowered Committee - Sanction of funds - Orders - Issued.

PWD (WRO )
G.O Ms No.239
Date :07-05-2008

Establishment -  G.O.

TNSCB
G.O Ms No.223
Date :23-04-2008

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) - Special Staff for Tsunami Relief and Rehabilitation measures in the Districts for Chennai, Kancheepuram, Cuddalore, Villupuram, Nagapattinam, Kanniyakumari and Tiruvallur Districts sanctioned - Further continuance of staff for the period from 1.4.2008 to 31.3.2009 - Orders - Issued.

PMU
G.O Ms No.217
Date :16-04-2008

Establishment -  G.O.

PMU
G.O Ms No.193
Date :02-04-2008

TSUNAMI 2004 – Tsunami Emergency Assistance Project (TEAP) with the Asian Development Bank assistance – Fisheries Department - Dredging of fishing harbours and fish landing centers – Formation of a Sub-Committee to review the study reports – orders - Issued.

Fisheries
G.O Ms No.179
Date :27-03-2008

Tsunami 2004 - Construction of houses in vulnerable areas in Coastal Districts - Sanction of additional funds Rs.47.00 crores - Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.171
Date :24-03-2008

Tsunami 2004 - Relief and Rehabilitation - Tsunami Emergency Reconstruction Project (TEAP) - Execution of schemes with Asian Development Bank assistance in the Tsunami affected Town Panchayats - Proposal for Roads and Buildings - Rs.34.7578 crores sanctioned - Sanction of balance amount of Rs.2.27 crores - Orders - Issued.

Town Panchayats
G.O Ms No.165
Date :19-03-2008

Establishment -  G.O.

TNSCB
G.O Ms No.163
Date :18-03-2008

Tsunami - Construction of houses - Phase I for the tsunami affected families by NGO. Kanniyakumari and Nagapattinam Districts - Insurance to new built houses of NGO's. - Phase-I - Sanction of Rs.73,37,313/- - Orders - Issued.

PMU
G.O Ms No.162
Date :18-03-2008

Tsunami 2004 - Construction of houses in vulnerable areas in Coastal Districts under Phase-II with Rajiv Gandhi Rehabilitation Package - Provision of rent for the in-situ beneficiaries for the period of twelve months - Sanction of funds of Rs.10.871 Crores - Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.157
Date :14-03-2008

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank – Public Works Department - Repair, Reconstruction and upgradation of Government High/ Higher Secondary Schools – Revised Administrative Sanction - Approved by Empowered Committee – Additional amount sanctioned – Orders - Issued.

PWD
G.O Ms No.156
Date :14-03-2008

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP), assisted by World Bank – Public Works Department - Repair, Reconstruction and upgradation of damaged Veterinary Hospitals, Dispensaries, New construction of Fodder Banks, Office building, Veterinary Sub Centre and Veterinary District Extension Centre –Revised Administrative Sanction - Approved by Empowered Committee – Additional amount sanctioned – Orders - Issued.

PWD
G.O Ms No.155
Date :14-03-2008

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank – Public Works Department- Repair, Reconstruction and upgradation of damaged Government Hospitals, Public Health Centres and Health Sub centres - Revised Administrative Sanction - Approved by Empowered Committee – Additional amount sanctioned – Orders - Issued.

PWD
G.O Ms No.148
Date :13-03-2008

Tsunami 2004 - Thoothukudi District - Construction of NGO. Backed out houses in Tuticorin Port Trust Land in TAC Nagar - Reduction in No. of Beneficiary - Usage of balance funds available towards rent - Ratification - Orders - Issued.

PMU
G.O Ms No.144
Date :11-03-2008

Tsunami 2004 - Construction of houses in the vulnerable areas - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank under Rajeev Gandhi Rehabilitation Package assisted by Government of India - Houses to be built by Tamil Nadu Slum Clearance Board for the tsunami affected families in and around Chennai - Formation of Monitoring Committee to resolve the issues - Orders - Issued.

TNSCB
G.O Ms No.137
Date :07-03-2008

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) - Department of Environment - Execution of schemes with the World Bank Assistance - Sanction of two posts of Field Assistant and two posts of Junior Assistant - Approved by Sub-Committee - Orders - Issued.

Environment
G.O Ms No.132
Date :04-03-2008

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) - Sanction of Special Infrastructure and Furniture for Kanniyakumari District for Tsunami Relief and Rehabilitation measures – BPL Cordless phone for the use of the Tsunami Branch of Kanniyakumari District - Sanction for purchase of new BPL Cordless phone - Approved by the Sub-Committee - Orders – Issued.

PMU
G.O Ms No.131
Date :04-03-2008

TSUNAMI 2004 – Emergency Tsunami Reconstruction Project (ETRP) with World Bank assistance – Fisheries Department - Reimbursement of mobile phone charges to the officials working in Tsunami Project Implementation Units of Fisheries Department - Approved by Sub-Committee - Orders - Issued.

Fisheries
G.O Ms No.130
Date :04-03-2008

Tsunami - Tsunami Rehabilitation Programme - Construction of Houses under Phase I programme - NGO. backed out houses - Additional amount of Rs.3.60 crores - Sanctioned - Orders - Issued.

PMU
G.O Ms No.127
Date :03-03-2008

Establishment -  G.O.

Town Panchayats
G.O Ms No.126
Date :03-03-2008

TSUNAMI – World Bank funded Emergency Tsunami Reconstruction Project (ETRP) – Fisheries Department - Formation of Project Implementation Unit (PIU) at State Level and Divisional Implementation unit (DIU) at Divisional Level – Vehicle Hiring Charges Sanctioned – Approved by Sub-Committee - Orders - Issued.

Fisheries
G.O Ms No.121
Date :28-02-2008

Establishment -  G.O.

Fisheries
G.O Ms No.105
Date :20-02-2008

Tsunami 2004 - Asian Development Bank assisted Tsunami Emergency Assistance Project (TEAP) - Tsunami Project Implementation Unit, Rural Development and Panchayat Raj Department –Purchase of a Car for the use of Project Director - Approved by the Sub-Committee – Sanction - Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.104
Date :20-02-2008

Tsunami 2004- Tamil Nadu Slum Clearance Board - Rajiv Gandhi Rehabilitation Package - Engaging NGO. facilitators for construction of house in vulnerable areas under Rajiv Gandhi Rehabilitation Package - Sanction of funds - Orders - Issued.

TNSCB
G.O Ms No.103
Date :20-02-2008

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank – Sanction of Special staff for Tirunelveli, Thoothukudi, Thanjavur, Pudukkottai and Ramanathapuram for Tsunami relief and Rehabilitation measures - Approved by the Sub-Committee - Orders - Issued.

PMU
G.O Ms No.98
Date :19-02-2008

Tsunami 2004 – World Bank assisted Emergency Tsunami Reconstruction Project (ETRP) – Environment Department - Execution of schemes under Emergency Tsunami Reconstruction Project (ETRP) -Formation of Two Project Co-ordination Units and one Technical Cell for the supervision and Monitoring of the Projects - Approved by Sub-Committee – Further Continuance for the period from 1.12.2007 to 30.11.2008 - Orders - Issued.

Environment
G.O Ms No.97
Date :18-02-2008

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Sanction of Special Infrastructure and Furniture for Nagapattinam District for Tsunami Relief and Rehabilitation measures – Purchase of a Xerox Machine for Tsunami Section in Nagapattinam District - Approved by Sub-Committee - Sanctioned - Orders – Issued.

PMU
G.O Ms No.96
Date :18-02-2008

Establishment -  G.O.

PMU
G.O Ms No.95
Date :18-02-2008

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Sanction of Special Infrastructure and Furniture for Nagapattinam and Cuddalore Districts for Tsunami Relief and Rehabilitation measures – Laptop for the use of the District Revenue Officer (Relief and Rehabilitations) of Nagapattinam and Cuddalore Districts - Sanction for purchase of new Laptops - Approved by the Sub-Committee - Orders - Issued.

PMU
G.O Ms No.92
Date :18-02-2008

Appointment of NGOs. as third party facilitators for undertaking the task of validation of beneficiary selection under Rajiv Gandhi Rehabilitation Package - Orders - Issued – Actual administration cost for Nagapattinam and Kancheepuram - Revised order - Issued.

PMU
G.O Ms No.91
Date :18-02-2008

Tsunami 2004 – World Bank assisted Emergency Tsunami Reconstruction Project (ETRP) - Environment Department- Provision of Cell Phone connection in lieu of landline connection already provided within the sanctioned amount - Orders - Issued.

Environment
G.O Ms No.90
Date :18-02-2008

Establishment -  G.O.

RD & PR
( TPIU )
G.O Ms No.86
Date :14-02-2008

Establishment -  G.O.

PMU
G.O Ms No.85
Date :14-02-2008

Establishment -  G.O.

PMU
G.O Ms No.84
Date :14-02-2008

Establishment -  G.O.

Town Panchayats
G.O Ms No.83
Date :14-02-2008

Establishment -  G.O.

Town Panchayats
G.O Ms No.81
Date :14-02-2008

TSUNAMI 2004 – Fisheries Department - Fisheries Management for Sustainable Livelihood (FIMSUL) Projects in Tamil Nadu funded by the World Bank Tsunami Economic Recovery Credit – Proposal approved by Empowered Committee – Orders - Issued.

Fisheries
G.O Ms No.80
Date :13-02-2008

Establishment -  G.O.

PMU
G.O Ms No.76
Date :12-02-2008

Establishment -  G.O.

Town Panchayats
G.O Ms No.75
Date :12-02-2008

Natural Calamities - Tsunami - Construction of RMS Protection walls at Symon Colony and Ramanthurai village - Rs.9 lakhs sanction from Calamity Relief Fund - Orders Issued - Amendment to Government Order - Issued.

PMU
G.O Ms No.52
Date :12-02-2008

Establishment -  G.O.

PMU
G.O Ms No.72
Date :11-02-2008

Tsunami 2004 – World Bank assisted Emergency Tsunami Reconstruction Project (ETRP) – Public Works Department (Water Resources Organisation) - Sanction of additional fund to the tune of Rs.1,21,65,800/- involved in tender excess in the work of widening, desilting and strengthening of various canal banks in Nagapattinam District – Proposal approved by Empowered Committee – Sanction of funds – Orders - Issued.

PWD (WRO)
G.O Ms No.71
Date :11-02-2008

Tsunami 2004 – Relief and rehabilitation – World Bank assisted Emergency Tsunami Reconstruction Project (ETRP) and Asian Development Bank assisted Tsunami Emergency Assistance Project (TEAP) – Purchase of Furniture for the use of the Project Management Unit – Approved by the Sub-Committee - Amount sanctioned - Orders - Issued.

PMU
G.O Ms No.67
Date :08-02-2008

Tsunami – World Bank assisted Emergency Tsunami Reconstruction Project (ETRP) – Construction of tenements and temporary shelters from Nochikuppam to Srinivasapuram to resettle the Tsunami affected families of Chennai and Thiruvallur Districts – Approved by Empowered Committee – Additional cost sanctioned - Orders – Issued.

TNSCB
G.O Ms No.61
Date :07-02-2008

Tsunami 2004 - World Bank assisted Emergency Tsunami Reconstruction Project (ETRP) - Tamil Nadu Water Supply and Drainage (TWAD) Board -Providing sanitation system to the permanent shelters in the tsunami hit habitation of Sonankuppam in Cuddalore Municipality of Cuddalore District - Proposal approved by Empowered Committee - Sanction of funds - Orders - Issued.

TWAD
G.O Ms No.58
Date :06-02-2008

Tsunami – Relief and Rehabilitation - World Bank aided Emergency Tsunami Reconstruction Project (ETRP) – Tamil Nadu Slum Clearance Board – Provision of Bus Terminus and infrastructure facilities at Semmenchery – Proposal approve by the Empowered Committee - Sanction of Rs.1,16,59,000/- - Orders - Issued.

TNSCB
G.O Ms No.56
Date :04-02-2008

TSUNAMI - Emergency Tsunami Reconstruction Project (ETRP) with World Bank assistance - Fisheries Department - Permission to utilize the funds already sanctioned, for making payment to consultancy services towards carrying out detailed studies and preparation of Detailed Project Report for the proposed modernization of four fishery harbours in Tamil Nadu - Proposal approved by Empowered Committee - Permission accorded - Orders - Issued.

Fisheries
G.O Ms No.54
Date :01-02-2008

Establishment -  G.O.

PMU
G.O Ms No.50
Date :31-01-2008

Establishment -  G.O.

PMU
G.O Ms No.49
Date :31-01-2008

Tsunami 2004 - Relief and Rehabilitation - Tsunami Emergency Assistance Project (TEAP) assisted by Asian Development Bank - Tamil Nadu Water Supply and Drainage Board - Construction of Recharge Structure - Dyke across river Lower Paravanar in Cuddalore District (Sub Project No.37) - Revised proposal approved by Empowered Committee - Balance amount Rs.2.1903 crores - Sanctioned - Orders - Issued.

TWAD
G.O Ms No.37
Date :23-01-2008

Tsunami 2004 - Tsunami Emergency Assistance Projects (TEAP) assisted by the Asian Development Bank - Implementation of Water Supply Schemes and Recharge structure by Tamil Nadu Water Supply and Drainage Board - Proposals approved by the Sub-Committee - Rs.9.93 lakhs sanctioned - Diversion of funds - Orders - Issued.

TWAD
G.O Ms No.36
Date :23-01-2008

Tsunami 2004 – Emergency Tsunami Reconstruction Project (ETRP) – Execution of sanitation facility schemes to Permanent Shelters in Tsunami affected areas by Tamil Nadu Water Supply and Drainage Board – Formation of Project Monitoring Unit at head office, 7 District Implementation Units, and sanction of staff – Proposal for 2007-2008 – Amount sanctioned - Diversion of funds - Orders - Issued.

TWAD
G.O Ms No.28
Date :21-01-2008

Tsunami – Tsunami Emergency Assistance Project (TEAP) by Asian Development Bank - Project Implementation Unit at State Level and District Level - Formed - Sanction of Funds for 2007-2008 - Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.27
Date :21-01-2008

Natural Calamities - Tsunami - Damages caused to Warehouses at Nagapattinam, Cuddalore and Thoothukudi - Rs.358.88 lakhs - sanction from Calamity Relief Fund to carry out the civil works - Orders Issued - Amendment to Government Order - Issued .

PMU
G.O Ms No.20
Date :11-01-2008

Tsunami - Tsunami Emergency Assistance Project (TEAP) assisted by the Asian Development Bank - Implementation of Water Supply Schemes and Recharge Structures by Tamil Nadu Water Supply and Drainage Board - Release of funds - Rs.38.5898 crores amount sanctioned - Orders - Issued.

TWAD
G.O Ms No.17
Date :11-01-2008

Establishment -  G.O.

PMU
G.O Ms No.16
Date :11-01-2008

Tsunami 2004 - Relief and Rehabilitation - Tsunami Emergency Assistance Project (TEAP) - Execution of scheme with Asian Development Bank Assistance - Vehicle Hire charges for Director of Town Panchayats - Enhancement of usage days and sanction of additional funds of Rs.4.00 lakhs (Rupees four lakhs only) - Approved by the Sub-Committee - Orders - Issued - Amendment - Issued.

Town Panchayats
G.O Ms No.09
Date :07-01-2008

Tsunami – Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank – Additional Staff to Tsunami Project Implementation Unit at State Level and District Implementation Unit at District Level in Rural Development and Panchayat Raj Department – Sanction of Furniture, Office Equipments for Tsunami Project Implementation Unit and District Implementation Units - Approved by the Sub-Committee - Orders – Issued.

RD & PR
( TPIU )
G.O Ms No.08
Date :07-01-2008

Tsunami - Tsunami Emergency Assistance Project (TEAP) assisted by Asian Development Bank - Implementation of Livelihood Support Programme for the Tsunami affected families in Chennai Metropolitan Area by Tamil Nadu Slum Clearance Board - Allocation for the year 2007-2008 - Release of funds Rs.200.55 lakhs - Sanctioned - Orders - Issued - Amendment - Issued.

TNSCB
G.O Ms No.07
Date :07-01-2008

Natural Calamities - Drought Relief Works - Continuance of special staff attending to Drought Relief works in Revenue Administration, Disaster Management and Mitigation Department - Further retention beyond 31.12.2007 from 1.1.2008 to 31.12.2008 - Orders - Issued.

PMU
G.O Ms No.06
Date :04-01-2008

Tsunami - Tsunami Emergency Assistance Project (TEAP) - Execution of works with assistance from Asian Development Bank - Sanction of staff, equipment for 6 Municipalities - Amount sanctioned - Orders - Issued - Amendment - Issued - Further Amendment - Issued.

CMA
G.O Ms No.05
Date :02-01-2008

Establishment -  G.O.