 Government Orders Issued for Tsunami Relief   for the year 2007

GO No & Date GO Details Departments / Districts
G.O Ms No.781
Date :28-12-2007

Tsunami 2004 - Relief and Rehabilitation - Tsunami Emergency Assistance Project (TEAP) - Execution of scheme with Asian Development Bank - Rehabilitation of Tsunami affected areas in Town Panchayats - Appointment of Additional staff and specialists for Directorate of Town Panchayats - Personnel working in the Project Implementation Unit in the Directorate of Town Panchayats under Emergency Assistance Project (TEAP) - Project Allowances @ 10% of Basic Pay - Amount Rs.9.23 lakhs - Sanctioned - Release of amount Rs.6,92,366/- - Sanctioned - Amendment - Orders - Issued.

Town Panchayats
G.O Ms No.780
Date :28-12-2007

Tsunami 2004 - Relief and Rehabilitation - Tsunami Emergency Assistance Project (TEAP) - Execution of schemes with the Asian Development Bank assistance in Town Panchayats areas - Appointment of 19 Data Entry Operators in 19 Town Panchayats - Proposal approved by the Sub-Committee - Amount Sanctioned - Amendment - Order - Issued.

Town Panchayats
G.O Ms No.779
Date :28-12-2007

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) assisted by Word Bank - Additional Staff to Project Implementation Units (DIUs) at District Level in Rural Development and Panchayat Raj Department - Sanctioned under Tsunami Emergency Assistance Project (TEAP) - Orders - Issued - Amendment - Issued - Further Amendment - Issued.

RD & PR
( TPIU )
G.O Ms No.778
Date :28-12-2007

Tsunami - Tsunami Emergency Assistance Project (TEAP) - Execution of works with assistance from Asian Development Bank - Redeployment of staff to Urban Local Bodies - Proposals submitted by Commissioner of Municipal Administration - Approved by Sub-Committee - Orders – Issued.

CMA
G.O Ms No.777
Date :28-12-2007

Tsunami - Tsunami Emergency Assistance Project (TEAP) - Execution of works with assistance from Asian Development Bank - Sanction of additional Staff to Cuddalore Municipality - Proposals submitted by Commissioner of Municipal Administration - Approved by Sub-Committee - Orders – Issued.

CMA
G.O Ms No.774
Date :27-12-2007

Tsunami 2004 - Construction of Vulnerable Houses under World Bank assisted Emergency Tsunami Reconstruction Project (ETRP) - Reconstruction Project - Housing Policy - Formulation - Orders - Issued.

PMU
G.O Ms No.773
Date :27-12-2007

Tamil Nadu Tourism Development Corporation - 34th India Tourist and Industrial Fair, 2008 - Completion of pavilions by second week of December 2007 for inauguration before Christmas - Documentary and material evidences to be displayed in the fair - Details of Tsunami Relief and Rehabilitation Works to be displayed in the fair - Sanction of funds Rs.1,49,000/- - Orders - Issued.

PMU
G.O Ms No.771
Date :27-12-2007

Tsunami – Tsunami Emergency Assistance Project (TEAP) assisted by Asian Development Bank – Sanction of one post of Telephone Operator in Tsunami Project Implementation Unit, Chennai - Approved by the Sub-Committee – Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.769
Date :24-12-2007

Tsunami 2004 - Relief and Rehabilitation - Tsunami Emergency Assistance project (TEAP) – Execution of schemes with Asian Development Bank Assistance – Vehicle Hire charges for Director of Town Panchayats – Enhancement of usage days and sanction of additional funds of Rs.4.00 lakhs (Rupees four lakhs only) - Approved by the Sub-Committee – Orders - Issued.

Town Panchayats
G.O Ms No.767
Date :20-12-2007

Tsunami 2004 - Tsunami Emergency Assistance Project (TEAP) - Execution of schemes assistance from Asian Development Bank - Sanction of staff for 6 Municipalities - Sanctioned - Orders - Issued - Further continuance - Accorded.

CMA
G.O Ms No.766
Date :20-12-2007

Tsunami 2004 - Asian Development Bank assisted Tsunami Emergency Assistance Project (TEAP) and World Bank aided Emergency Tsunami Reconstruction Project (ETRP) - Implementation of the Project - Formation of Tsunami Cell in the Revenue Department, Secretariat - Approved by the Sub-Committee - Orders - Issued.

PMU
G.O Ms No.764
Date :20-12-2007

Tsunami 2004 - Relief and Rehabilitation - Emergency Tsunami Reconstruction Project (ETRP) with World Bank assistance - Consultant Agency - New concept Information Systems Pvt. Ltd., Chennai, appointed - Preparation of booklet titled as "Tiding Over Tsunami - Part II" - Printing of - Expenditure of Rs.2,25,175/- - Sanction - Orders - Issued.

PMU
G.O Ms No.763
Date :20-12-2007

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) aided by World Bank – Purchase of one Desktop Computer and one Laser Jet Printer (Office all in one) with latest accessories for use in Special Commissioner and Commissioner of Revenue Administration's Chamber - Approved by Sub-Committee - Sanctioned - Orders - Issued.

PMU
G.O Ms No.759
Date :19-12-2007

Tsunami – Tsunami Emergency Assistance Project (TEAP) assisted by Asian Development Bank – Sanction of hired vehicles to 12 District Implementation Units of Rural Development and Panchayat Raj Department - Approved by Sub-Committee - Orders – Issued.

RD & PR
( TPIU )
G.O Ms No.750
Date :17-12-2007

Tsunami – Tsunami Emergency Assistance Project (TEAP) assisted by Asian Development Bank – Sanction of additional posts of Block Development Officer (Co-Ordination) and Assistant-Cum-Data Entry Operators in 12 District Implementation Units in Rural Development and Panchayat Raj Department - Approved by the Sub-Committee - Orders – Issued.

RD & PR
( TPIU )
G.O Ms No.730
Date :12-12-2007

Establishment -  G.O.

RD & PR
( TPIU )
G.O Ms No.729
Date :12-12-2007

Tsunami – Tsunami Emergency Assistance Project (TEAP) assisted by Asian Development Bank – Sanction of fuel for the Project Officer, District Rural Development Agencies functioning as Project Co-Ordinator of District Implementation Unit of Rural Development and Panchayat Raj Department - Approved by the Sub-Committee – Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.727
Date :12-12-2007

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) aided by World Bank - Animal Husbandry Department - Construction of 13 District Veterinary Extension Centre - Amount sanctioned - Provision of funds for 2007-2008 - Orders - Issued.

Animal Husbandry
G.O Ms No.724
Date :06-12-2007

Establishment -  G.O.

PMU
G.O Ms No.723
Date :06-12-2007

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) aided by World Bank - Animal Husbandry Department - Construction of 70 Sub-Centre Buildings - Amount sanctioned - Provision of funds for 2007-2008 - Orders - Issued.

Animal Husbandry
G.O Ms No.717
Date :05-12-2007

Establishment -  G.O.

PMU
G.O Ms No.710
Date :30-12-2007

Tsunami - Asian Development Bank assisted Tsunami Emergency Assistance Project (TEAP) - Sanction of Rs.24.00 lakhs towards consultancy work for preparation of IEE/ EMP studies through Anna University for proposed dredging in fishing harbour and fish landing centres in Tamil Nadu - Orders Issued - Amendment - Issued.

PMU
G.O Ms No.696
Date :22-11-2007

Tsunami 2004 – Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank – Formation of Project Implementation Unit (PIU) at State level and Divisional Implementation Unit (DIU) at Divisional level – Purchase of Office Equipments – Cost of Rs.42.93 lakhs to Fisheries Department – Sanctioned – Hire Charges to vehicles - Orders – Issued.

RD & PR
( TPIU )
G.O Ms No.692
Date :21-11-2007

Tsunami – Relief & Rehabilitation - World Bank aided Emergency Tsunami Reconstruction Project (ETRP) and Asian Development Bank assisted Tsunami Emergency Assistance Project (TEAP) – Appointment of Consultant and payment of consultant charge - Concurrence of Government – Orders – Issued - Amendment - Issued.

PMU
G.O Ms No.688
Date :19-11-2007

Tsunami 2004 - Tamil Nadu Maritime Board - Execution of schemes by Tamil Nadu Maritime Board with Asian Development Bank assistance - Sanction of incremental expenses of Rs.50 lakhs for execution of Tsunami Emergency Assistance Project (TEAP) works - Amount sanctioned - Orders - Issued - Revalidation - Orders - Issued - Amendment - Issued.

TNMB
G.O Ms No.679
Date :16-11-2007

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) aided by World Bank - Repair, Reconstruction and upgradation of damaged Government Hospital, Public Health Centres and Health Sub-Centres - Amount sanctioned - Provision of additional funds for 2007-2008- Orders - Issued.

PWD(Building)
G.O Ms No.670
Date :14-11-2007

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) aided by World Bank - Repair, Reconstruction and upgradation of damaged Government School Buildings - Amount sanctioned - Provision of additional funds in RE/FMA 2007-2008 - Orders - Issued.

PMU
G.O Ms No.669
Date :13-11-2007

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) - Execution of Schemes with World Bank Assistance - Construction of 3616 tenements at AIR land at Thiruvottiyur Village in Tiruvallur District - Proposal approved by the Empowered Committee - Amount Sanctioned - Orders - Issued.

TNSCB
G.O Ms No.668
Date :13-11-2007

Establishment -  G.O.

PMU
G.O Ms No.666
Date :13-11-2007

Tsunami - Project Management Unit - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Purchase of Computer and Printers for Hon'ble Minister for Revenue & Prison, Government of Tamil Nadu and Special Commissioner and Commissioner of Revenue Administration - Balance amount to be paid to the concerned Dealer - Sanction of an additional amount of Rs.2,05,000/- - Orders - Issued.

PMU
G.O Ms No.665
Date :13-11-2007

Tsunami 2004 - Relief and Rehabilitation - Emergency Tsunami Reconstruction Project (ETRP) - Execution of schemes with World Bank Assistance in Tsunami affected areas of Town Panchayats - Provision of Basic Amenities and Infrastructure - Proposals to new habitations funds sanction of balance amount for the year 2007-2008 - Released - Orders - Issued.

Town Panchayats
G.O Ms No.664
Date :13-11-2007

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Additional staff to Project Implementation Unit (PIU) at State Level and District Implementation Units (DIUs) at District Level in Rural Development and Panchayat Raj Department - Sanctioned under Tsunami Emergency assistance Project (TEAP) - Orders - Issued - Amendment - Issued.

RD & PR
( TPIU )
G.O Ms No.663
Date :13-11-2007

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) - Maintenance of Plantations during 2007-2008 raised during 2006-2007 under Emergency Tsunami Reconstruction Project (ETRP) (NCRMP converted) Rs.52.66 lakhs - Sanctioned - Orders - Issued - Amendment - Issued.

Forests
G.O Ms No.662
Date :13-11-2007

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP), Tamil Nadu 2005 – Aided by World Bank – Repair, Reconstruction and upgradation of Government High/ Higher Secondary Schools – Revised Administrative Sanction - Approved by Empowered Committee – Amount sanctioned - Orders - Issued.

PMU
G.O Ms No.661
Date :13-11-2007

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP), Tamil Nadu 2005 – Aided by World Bank – Repair, Reconstruction and upgradation of damaged Veterinary Hospitals, Dispensaries, New construction of Fodder Banks, Office building, Veterinary Sub Centre and Veterinary District Extension Centre – Revised Administrative Sanction - Approved by Empowered Committee – Amount sanctioned – Orders - Issued.

PWD (Building)
G.O Ms No.660
Date :13-11-2007

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) – Aided by World Bank – Repair, Reconstruction and upgradation of damaged Government Hospitals, Public Health Centres and Health Sub centres - Revised Administrative Sanction - Approved by Empowered Committee – Amount sanctioned – Orders - Issued.

PWD (Building)
G.O Ms No.658
Date :13-11-2007

Tsunami - Construction of houses to families living in Thatched houses, poorly constructed houses and non engineering structure in Coastal districts of Tamil Nadu - Formation of Survey teams and Sanction of funds, Expenditure incurred Sanction of additional funds - Orders - Issued.

PMU
G.O Ms No.647
Date :05-11-2007

Tsunami 2004 - Relief and Rehabilitation - Tsunami Emergency Assistance Project (TEAP) with Asian Development Bank Assistance - Rehabilitation of Tsunami affected areas in Town Panchayats - Appointment of Additional staff and procurement of infrastructure facilities, furniture etc, for the Director of Town Panchayats - Proposal approved by the Sub-Committee - Balance amount of Rs.30.24 lakhs - Sanctioned - Orders - Issued.

Town Panchayats
G.O Ms No.646
Date :05-11-2007

Tsunami 2004 - Relief and Rehabilitation - Director of Town Panchayats - Tsunami Emergency Assistance Project (TEAP) - Execution of schemes with Asian Development Bank assistance - Rehabilitation of Tsunami affected areas in Town Panchayats - Water Supply and Sanitation Component - Sanction of balance amount for the year 2007-2008 - Orders - Issued.

Town Panchayats
G.O Ms No.645
Date :05-11-2007

Tsunami 2004 - Relief and Rehabilitation - Director of Town Panchayats - Tsunami Emergency Reconstruction Project (TEAP) - Execution of schemes with Asian Development Bank assistance in Town Panchayats - Execution of Infrastructure facilities in Town Panchayats - Sanction of balance amount for the year 2007-2008 - Amount Sanctioned - Orders - Issued.

Town Panchayats
G.O Ms No.640
Date :02-11-2007

Establishment -  G.O.

PMU
G.O Ms No.639
Date :02-11-2007

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) aided by World Bank - Repair, Reconstruction and upgradation of damaged Government Hospital, Public Health Centres and Health Sub-Centres - Amount sanctioned - Provision of additional funds for 2007-2008- Orders - Issued.

PWD (Building)
G.O Ms No.630
Date :29-10-2007

Natural Calamities - Grant of financial assistance to the victims of Natural Calamities like Cyclone/Flood/ Drought, Earthquake, etc., from Calamity Relief Fund/ National Calamity Contingency Fund - Revised norms to be adopted - Orders - Issued.

PMU
G.O Ms No.611
Date :23-10-2007

Natural Calamities - Tsunami-2004 - Highways Department - Improvement to Roads and Construction / Reconstruction of bridges in the coastal districts under Tsunami Rehabilitation Programme - Rs. 362.67 Crores sanctioned from Calamity Relief Fund - Orders - Issued - Amendments - Issued.

Highways
G.O Ms No.601
Date :19-10-2007

Tsunami - Implementation of Externally Aided Projects through Rural Development Department - Tsunami Emergency Assistance Project (TEAP) assisted by Asian Development Bank - Proposals on Livelihood Component - Approved by Empowered Committee - Further release -Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.591
Date :17-10-2007

Tsunami - Tsunami Emergency Assistance Project (TEAP) assisted by Asian Development Bank - Sanction of staff, equipments for 6 Municipalities - Amount sanctioned - Orders - Issued - Amendment - Orders - Issued.

CMA
G.O Ms No.590
Date :17-10-2007

Tsunami, 2004 - Tsunami Emergency Assistance Project (TEAP) – Execution of schemes by Tamil Nadu Maritime Board with Asian Development Bank assistance – Rehabilitation works of tsunami affected port infrastructure of Cuddalore and Nagapattinam minor ports – Sanction of incremental expenses of Rs.50 lakhs for executing TEAP works – Amount Sanctioned – Orders issued – Amendment - Orders - Issued.

TNMB
G.O Ms No.584
Date :10-10-2007

Tsunami - 2004 - Relief and Rehabilitation measures - Special Staff for the Project Management Unit - Emergency Tsunami Reconstruction Project (ETRP) - Office of the Special Commissioner and Commissioner of Revenue Administration - Retention of staff beyond 30.6.2007 - Sanctioned - Orders - Issued.

PMU
G.O Ms No.583
Date :09-10-2007

Tsunami - Relief and Rehabilitation - Project Management Unit - World Bank aided Emergency Tsunami Reconstruction Project (ETRP) and Asian Development Bank assisted Tsunami Emergency Assistance Project (TEAP) - Thiru G.Ravikrishnan - Appointed as Coordinator (EAP Schemes) - Relief from duties - Orders - Issued.

PMU
G.O Ms No.565
Date :27-09-2007

Tsunami - 2004 - Relief and Rehabilitation - Director of Town Panchayats - Tsunami Emergency Reconstruction Project (TEAP) - Execution of schemes with Asian Development Bank assistance - Rehabilitation of Tsunami affected areas in Town Panchayats - Infrastructure - Proposals for sanction of funds under Building - Sanction of balance amount for the year 2007-2008 - Orders - Issued.

Town Panchayats
G.O Ms No.564
Date :27-09-2007

Tsunami - 2004 - Tsunami Emergency Assistance Projects (TEAP) Assisted by the Asian Development Bank implementation of Water Supply Schemes and Recharge structure by Tamil Nadu Water Supply and Drainage Board - proposals approved by the Sub-Committee Rs.9.93 lakhs sanctioned - Orders - Issued.

TWAD
G.O Ms No.556
Date :24-09-2007

Emergency Tsunami Reconstruction Project (ETRP) – Aided by World Bank – One Computer Operator Post under Emergency Tsunami Reconstruction Project (ETRP) in the Office of the Chief Engineer (Buildings) - Approved by Sub Committee - Post Sanctioned - Orders - Issued.

PWD (Building)
G.O Ms No.552
Date :21-09-2007

Tsunami - 2004 - Emergency Tsunami Reconstruction Project (ETRP) – Maintenance of plantations during 2007-2008 raised during 2006-2007 under Emergency Tsunami Reconstruction Project (ETRP) (NCRMP converted) Rs.52.66 lakhs - Sanctioned - Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.548
Date :20-09-2007

Tsunami – 2004 - Tsunami Emergency Assistance Project (TEAP) – Formation of Tsunami Project Implementation Unit at State Level and District Implementation Units at District Level – Government orders issued for a period of one year - further extension of one year - Approved by the Sub-Committee - Orders – Issued

PMU
G.O Ms No.545
Date :19-09-2007

Establishment -  G.O.

PMU
G.O Ms No.544
Date :19-09-2007

Establishment -  G.O.

PMU
G.O Ms No.543
Date :19-09-2007

Establishment -  G.O.

PMU
G.O Ms No.542
Date :19-09-2007

TSUNAMI – Emergency Tsunami Reconstruction Project (ETRP) with World Bank assistance and Tsunami Emergency Assistance Project (TEAP) with the Asian Development Bank assistance – Appointment of consultants to assist the Department in execution of World Bank projects – Payment of consultant fee on a monthly basis – Sanctioned – Orders - Issued.

Fisheries
G.O Ms No.540
Date :19-09-2007

Tsunami – Tsunami Emergency Assistance Project (TEAP) - Rural Development and Panchayat Raj Department – Sanction of Project Allowance to Project Officers , District Rural Development Agency functioning as Project Coordinators of Tsunami District Implementation Unit – Approved by the Sub-Committee of Empowered Committee - Orders - Issued

RD & PR
( TPIU )
G.O Ms No.538
Date :18-09-2007

Tsunami - 2004 - Relief and Rehabilitation - Tsunami Emergency Assistance Project (TEAP) - Execution of schemes with Asian Development Bank assistance - Rehabilitation of Tsunami affected areas in Town Panchayats - Additional Staff Salaries - Sanction of funds for the year 2007-2008 - Orders - Issued.

Town Panchayats
G.O Ms No.530
Date :14-09-2007

Establishment -  G.O.

PMU
G.O Ms No.517
Date :11-09-2007

Tsunami - Tsunami Emergency Assistance Project (TEAP) assisted by Asian Development Bank - Implementation of Livelihood Support Programme for the Tsunami affected families in Chennai Metropolitan Area by Tamil Nadu Slum Clearance Board - Allocation for the year 2007-2008 - Release of funds Rs.200.55 lakhs - Sanctioned - Orders - Issued.

TNSCB
G.O Ms No.516
Date :11-09-2007

Tsunami 2004 - Construction of houses to families living in thatched houses, poorly constructed houses and non-engineered structures in coastal districts of Tamil Nadu - Formation of Survey Teams and Sanction of funds - Orders - Issued.

PMU
G.O Ms No.502
Date :07-09-2007

Tsunami - 2004 - Provision of basic amenities to houses constructed by NGOs - Laying of Internal c.c roads in NGO constructed housing sites - Tender called for and received during 2006-2007 - Evaluation and approval of excess rates worked out as per 2007-2008 schedule of rates - Permission to adopt 2007-2008 schedule of rates for assessing excess and to grant approval by appropriate authorities - Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.500
Date :06-09-2007

Tsunami 2004 - Tamil Nadu Maritime Board - Extension of schemes by Tamil Nadu Maritime Board with Asian Development Bank assistance - Sanction of incremental expenses of Rs.50 lakhs for execution of Tsunami Emergency Assistance Project (TEAP) works - Amount sanctioned - Orders - Issued - Revalidation - Orders - Issued.

TNMB
G.O Ms No.494
Date :31-08-2007

Tsunami - 2004 - Relief and Rehabilitation - World Bank aided Emergency Tsunami Reconstruction Project (ETRP) - Rehabilitation of Tsunami affected slum families of Thiruvallore District in the 468 tenements constructed at Thazhankuppam - Proposal approved by the Empowered Committee - Rs.4.75 crores - Amount sanctioned - Orders - Issued.

PMU
G.O Ms No.493
Date :31-08-2007

Tsunami - 2004 - Emergency Tsunami Reconstruction Project (ETRP) – Execution of Schemes with World Bank Assistance – Preparation of Integrated Coastal Zone Management Plan for Tamil Nadu and Preparation of Coastal Vulnerability Maps for Tamil Nadu – Entrustment of consultancy services to M/s DHI (India) Water and Environment – Estimate of work approved by Empowered Committee – Additional amount - Sanction of - Orders – Issued.

Environment
G.O Ms No.491
Date :31-08-2007

Tsunami - 2004 - Construction of Houses backed out by NGOs - Construction by Government - Amount sanctioned by Government - Further additional allotment of funds Rs.21.72 crore sanctioned - Orders - Issued.

PMU
G.O Ms No.490
Date :30-08-2007

Tsunami - 2004 - Relief and Rehabilitation - Tsunami Emergency Assistance Project (TEAP) - Execution of schemes with Asian Development Bank assistance - Rehabilitation of Tsunami affected areas in Town Panchayats - Proposal for Roads - Release of balance amount Rs.411.48 lakhs - Sanctioned - Orders - Issued.

Town Panchayats
G.O Ms No.482
Date :28-08-2007

Tsunami Relief and Rehabilitation - Project Management Unit - Construction of houses in the vulnerable coastal districts of Tamil Nadu - Engagement of consultancy for preparation of layout for each habitation with all basic amenities - Publication of “Request for Proposal” – Settlement of advertisement charges – Amount sanctioned – Orders - Issued.

PMU
G.O Ms No.481
Date :28-08-2007

Tsunami - 2004 - Chennai District - Relief and Rehabilitation - World Bank aided Emergency Tsunami Reconstruction Project (ETRP) - Construction of tenements to the Tsunami victims in Semmenchery - Water supply and sewerage contingency plan - Rs.63.96 lakhs - sanctioned - Orders - Issued.

TWAD
G.O Ms No.469
Date :21-08-2007

Tsunami - 2004 - Tsunami Emergency Assistance Project (TEAP) assisted by Asian Development Bank - Proposal for additional road works to be taken under Roads and Drainages component - Approved by Empowered Committee for Additional road works from savings under Public Buildings component of TEAP - Additional funds Rs.16.57 crores - Sanctioned - Orders - Issued.

PWD
G.O Ms No.465
Date :20-08-2007

Tsunami - 2004 - Construction of new houses in the vulnerable areas of Coastal Districts within 1000 m. from HTL and 200 m. from Backwater - Preparation of proposal for sending to World Bank and Government of India - Engagement of Specialist for preparation of proposal - Payment of fees - Approved by Empowered Committee on 9.2.2007 - Sanction of funds - Order issued - Revalidation - Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.464
Date :20-08-2007

Tsunami 2004 - Rajiv Gandhi Rehabilitation Package – Construction of NGO backed out houses and Vulnerable houses under Rajiv Gandhi Rehabilitation Package and Emergency Tsunami Reconstruction Project funded by World Bank – Revision of unit cost from Rs.2.10 lakhs to Rs.2.38 lakhs per house – Approved - Orders - Issued - Amendment - Orders - Issued.

PMU
G.O Ms No.461
Date :17-08-2007

Tsunami – 2004 - Public Works Department (WRO) - Strengthening the bank of Buckingham Canal, Vellapallam Uppanar etc. in Nagapattinam District - Shifting of Electrical Poles in the Canal - Proposal for sanction of Rs.5,95,550/- under Emergency Tsunami Reconstruction Project - Approved by Empowered Committee - Orders - Issued.

PWD(WRO)
G.O Ms No.457
Date :16-08-2007

Tsunami - Tsunami Emergency Assistance Project (TEAP) - Execution of schemes with Asian Development Bank assistance in Town Panchayats areas - Appointment of 19 Data Entry Operators in 19 Town Panchayats - Approved by the Sub-Committee - Amount sanctioned - Orders - Issued - Amendment - Orders - Issued.

Town Panchayats
G.O Ms No.452
Date :14-08-2007

Tsunami – 2004 - Tsunami Emergency Assistance Project (TEAP) - Execution of Schemes by NABARD and Rural road wing of Highways Department - Sanction of funds towards advertisement charges for Bridge and Road works - Approved by Empowered Committee for Rs.15.00 lakhs - Amount Sanctioned - Orders - Issued.

Highways
G.O Ms No.451
Date :14-08-2007

Tsunami - 2004 - Rajiv Gandhi Rehabilitation Packages -Construction of houses at Karikattukuppam at Tiruporur Panchayat Union, Kancheepuram District - Package No.IV - Tender excess - Approval - Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.447
Date :13-08-2007

Tsunami - Tsunami Emergency Assistance Project (TEAP) assisted by Asian Development Bank - Formation of Project Implementation Unit (PIU) at State Level and District Implementation Units (DIU) at District Level - Ordered - Staff for Rural Development Department - Sanctioned - Orders - Issued - Amendment - Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.446
Date :13-08-2007

Tsunami - 2004 - Tsunami Emergency Assistance Project (TEAP) - Evaluation of Relief and Rehabilitation measures - Study on livelihood assistance provided to Self Help Groups (SHGs) in Tsunami affected areas to be undertaken by Evaluation and Applied Research Department - Approved by Empowered Committee - Administrative sanction - Orders - Issued.

PMU
G.O Ms No.445
Date :13-08-2007

Tsunami - 2004 - Tsunami Emergency Assistance project (TEAP) - Execution of schemes by the Fisheries Department with the Asian Development Bank assistance - sanction of Rs.24.00 lakhs + Service Tax towards consultancy work for preparation of Initial Environmental Examination (IEE)/ Environmental Management Plan (EMP) study report through Anna University, Chennai for the proposed dredging in fishing harbour and fish landing centre in Tamil Nadu - Orders - Issued.

Fisheries
G.O Ms No.443
Date :13-08-2007

Tsunami - 2004 - Contingency Fund - Emergency Tsunami Reconstruction Project (ETRP) - Execution of works with assistance from World Bank - Tsunami relief works - Municipal infrastructure works in five Urban Local Bodies - Orders - Issued - Release of balance funds of Rs.1225.08 lakhs - Sanctioned - Orders - Issued.

CMA
G.O Ms No.441
Date :10-08-2007

Tsunami - 2004 - Emergency Tsunami Assistance Project (ETRP) assisted by World Bank - Formation of Project Implementation Unit (PIU) at State Level and District Implementation Unit (DIU) at Divisional Level - Proposal for staff for Fisheries Department - Approved by Empowered Committee - Sanctioned - Orders - Issued - Amendment - Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.437
Date :09-08-2007

Tsunami - 2004 - Relief and Rehabilitation - Emergency Tsunami Reconstruction Project (ETRP) - Execution of schemes with the World Bank assistance in Town Panchayats areas - Appointment of Additional Administrative and Technical Staff under Emergency Tsunami Reconstruction Project (ETRP) for the Director of Town Panchayats and in the office of the Assistant Director of Town Panchayats in zones - Approved by the Sub-Committee - Amount sanctioned - Orders - Issued - Amendment - Orders - Issued.

Town Panchayats
G.O Ms No.436
Date :09-08-2007

Tsunami – 2004 - Construction of permanent shelters - Sanitation - Consortium for DEWATS Dissemination (CDD) Society - Project consultancy for implementation of DEWATS (Decentralised Waste Water Treatment Systems) with Simplified Sewer Systems (SSS) in 23 permanent settlements in Municipal and Town Panchayat limits of tsunami affected districts in Tamil Nadu - Proposals approved by Empowered Committee - Engagement of consultancy and expenditure thereof - Orders - Issued.

Town Panchayat
G.O Ms No.435
Date :09-08-2007

Tsunami - 2004 - Tsunami Emergency Assistance project (TEAP) - Execution of schemes by the Fisheries Department with the Asian Development Bank assistance - Restoration and rehabilitation works in the fishing harbours and fish landing centres in Tamil Nadu - Rs.74.30 lakhs amount sanctioned - Sanction of additional expenditure involved in the works as tender excess amount - Orders - Issued.

Fisheries
G.O Ms No.431
Date :08-08-2007

Emergency Tsunami Reconstruction Project (ETRP) – Aided by World Bank – Providing Internal Services to Government Head quarters Hospital ‘A’ Block at Nagapattinam in Nagapattinam District – Approved by Empowered Committee – Amount sanctioned – Orders - Issued.

PMU
G.O Ms No.370
Date :08-08-2007

Establishment -  G.O.

PMU
G.O Ms No.424
Date :07-08-2007

Tsunami - 2004 - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Fisheries Department - Conducting model studies and developing fishing harbour etc. in Tamil Nadu approved by Empowered Committee - Rs.22.968 crore sanctioned - Orders - Issued.

Fisheries
G.O Ms No.423
Date :07-08-2007

Tsunami - 2004 - Emergency Tsunami Reconstruction Project (ETRP) - Execution of schemes with World Bank assistance - Continuance of Planning Co-ordination and Monitoring Cell upto 30.4.2008 in Tamil Nadu Slum Clearance Board - Approved by Empowered Committee - Amount Rs.26.189 lakhs for the 2007-2008 Sanctioned - Orders - Issued.

TNSCB
G.O Ms No.421
Date :03-08-2007

Tsunami-Tsunami Emergency Assistance project (TEAP) - Execution of Water Supply work with assistance from Asian Development Bank (ADB) - Infrastructure Development Work - Construction of Check Dam across the Vettar river in Nagapattinam Municipality - Proposal submitted By Commissioner of Municipal Administration - Approved by the Empowered Committee - Sanction of funds - Orders - Issued.

CMA
G.O Ms No.420
Date :03-08-2007

Tsunami 2004 - Rajiv Gandhi Rehabilitation Package – Construction of NGO backed out houses and Vulnerable houses under Rajiv Gandhi Rehabilitation Package and Emergency Tsunami Reconstruction Project funded by World Bank – Revision of unit cost from Rs.2.10 lakhs to Rs.2.38 lakhs per house – Approved - Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.414
Date :31-07-2007

Natural calamities-Tsunami-2004 - Nagapattinam District - Repairing of 117 Tamil Nadu Slum Clearance Board tenements in the Onion Basket Makers Colony - Rs.19,20,600/- sanction from Calamity Relief Fund - Orders - Issued

TNSCB
G.O Ms No.413
Date :31-07-2007

Natural Calamities - Tsunami - 1392 tenements constructed by Tamil Nadu Slum Clearance Board in Hindustan Lever Limited Land, in Thiruvottiyur and Thilagar Nagar - Purchase of tenements from Tamil Nadu Slum Clearance Board to allot the same to the Tsunami affected families - Rs.20.88 Crores - Sanction from Rajiv Gandhi Rehabilitation Package - Orders - Issued.

TNSCB
G.O Ms No.412
Date :31-07-2007

Natural Calamities - Tsunami-2004 - Funds sanctioned as relief for the damages suffered in Tsunami by Tamil Nadu Water Supply and Drainage Board - Permission to divert Rs.158.29 lakhs for providing sewerage systems in the permanent shelters constructed site for tsunami affected families in Devanampattinam in Cuddalore District and Samanthanpettai in Nagapattinam District - Orders - Issued.

TWAD
G.O Ms No.403
Date :26-07-2007

Natural Calamities - Tsunami - Chennai District - Payment of drinking water charges to Metro water for the water supplied to the tsunami affected families accommodated in the temporary shelters constructed at Tamil Nadu Housing Board Celcrete factory site, Ernavur - Rs.5,00,000/- sanctioned from Calamity Relief Fund - Orders - Issued.

TWAD

TNEB

G.O Ms No.334
Date :26-06-2007

Natural Calamities - Tsunami - Damages caused to Warehouses at Nagapattinam, Cuddalore and Thoothukudi - Rs.358.88 lakhs sanctioned from Calamity Relief Fund to carry out the civil works - Orders  - Issued

PMU
G.O Ms No.330
Date : 21-06-2007

Tsunami - Construction of houses backed out by N.G.Os. under Rajiv Gandhi Rehabilitation Package - Provision of basic amenities for the above houses under Tsunami Rehabilitation Programme from the savings available - Permission Granted - Amendment - Issued

RD & PR
( TPIU )
  G.O.Ms.No. 298 
  Dated  30.5.2007

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) aided by World Bank - Animal Husbandry Department - Construction of 13 District Veterinary Extension Centres and provision of Infrastructure facilities - Rs.165 lakhs - amount sanctioned - Orders - Issued.

Animal Husbandry
  G.O.Ms.No. 297 
  Dated  30.5.2007

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) aided by World Bank - Animal Husbandry Department - Reconstruction of 70 Sub-centre buildings and provision of Infrastructure facilities - Rs.17.92 lakhs - Amount sanctioned - Orders - Issued.

Animal Husbandry
  G.O.Ms.No. 273 
  Dated  24.5.2007

Establishment -  G.O.

PMU
  G.O.Ms.No. 272 
  Dated  24.5.2007

Tsunami - Tamil Nadu Maritime Board - Proposal to take up additional works from the savings for the for the improvement of infrastructure at Cuddalore and Nagapattinam Ports, approval of Consultancy Services Charges already paid to IIT & Anna University and for appointment of a retired Superintending Engineer as a Consultant for TEAP works within the sanctioned amount of Rs.56.931 Crore - Approved by Empowered Committee - Orders - Issued.

TNMB
  G.O.Ms.No. 271 
  Dated  24.5.2007

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) - Execution of schemes with World Bank assistance - Formation of three Divisions in Tamil Nadu Slum Clearance Board - Approved by Sub Committee - Sanction of Rs.63.43 Lakhs - Orders - Issued.

TNSCB
  G.O.Ms.No. 268 
  Dated  22.5.2007

Establishment -  G.O.

PMU
  G.O.Ms.No. 262 
  Dated  21.5.2007

Tsunami 2004 – Relief and Rehabilitation - Tsunami Emergency Assistance Project (TEAP) - Execution of schemes with Asian Development Bank Assistance - Additional staff for Technical wing for Directorate of Town Panchayats - Sanctioned - Orders - Issued - Further continuance - Accorded.

Town Panchayats
  G.O.Ms.No. 261 
  Dated  18.5.2007

Tsunami– Relief and Rehabilitation - Tsunami Emergency Assistance Project - Execution of schemes with Asian Development Bank Assistance - Rehabilitation of tsunami affected areas in Town Panchayats - Appointment of additional staff for Director of Town Panchayats - Orders - Issued - Further continuance - Accorded.

Town Panchayats
  G.O.Ms.No. 260 
  Dated  18.5.2007

Tsunami 2004 – Relief and Rehabilitation - Emergency Tsunami Reconstruction Project (ETRP) - Execution of schemes with the World Bank Assistance in Town Panchayats areas - Appointment of additional administrative and technical staff under ETRP for the Directorate of Town Panchayats and in the O/o. Assistant Director of Town Panchayats in zones - Proposal approved by the Sub-Committee - Amount sanctioned - Orders - Issued.

Town Panchayats
  G.O.Ms.No. 253 
  Dated  15.5.2007

Tsunami 2004 – Relief and Rehabilitation - Instruction of bids for procurement of works, goods, etc., under World Bank funded ETRP and Asian Development Bank funded TEAP - Fixing of cost of bid document - Orders - Issued.

PMU
  G.O.Ms.No. 251 
  Dated  15.5.2007

Establishment -  G.O.

PMU
  G.O.Ms.No. 247 
  Dated  11.5.2007

Tsunami 2004 – Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank – Formation of Project Implementation Unit (PIU) at State level and Divisional Implementation Unit (DIU) at Divisional level – Purchase of Office Equipments – Cost of Rs.42.93 lakhs to Fisheries Department – Sanctioned – Orders – Issued.

Fisheries
  G.O.Ms.No. 246 
  Dated  11.5.2007

Tsunami 2004 – Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank – Formation of Project Implementation Unit (PIU) at State level and Divisional Implementation Unit (DIU) at Divisional level – Proposal for Staff for Fisheries Department – Approved by Empowered Committee – Sanctioned – Orders – Issued.

Fisheries
  G.O.Ms.No. 245 
  Dated  11.5.2007

Tsunami 2004 – Execution of schemes with World Bank assistance – Formation two project coordination units and one Technical cell for supervision and monitoring of projects under control of Director of Environment – Orders – Issued – Further continuance – Orders – Issued.

Environment
  G.O.Ms.No. 244 
  Dated  11.5.2007

TSUNAMI – Tsunami Emergency Assistance Project (TEAP) assisted by Asian Development Bank – Additional staff to District Implementation Units (DIUs) at District Level Rural Development and Panchayat Raj Department – Sanctioned under TEAP funded by Asian Development Bank  - Orders  Issued.

RD & PR
( TPIU )
  G.O.Ms.No. 243 
  Dated  11.5.2007

TSUNAMI – Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank – Additional staff to Project Implementation Unit (PIU) at State Level and District Implementation Units (DIUs) at District Level in Rural Development and Panchayat Raj Department – Sanctioned under TEAP - Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.202
Date : 17-04-2007
Natural Calamities - Tsunami - Nagapattinam District - Sterilized Tsunami victims under gone Recanalisation Operation Relief assistance Rs.1,16,898/- sanctioned from Calamity Relief Fund - Orders - Issued PMU
G.O Ms No.161
Date : 26-03-2007
Natural Calamities - Tsunami - Construction of houses backed out by NGOs under Rajiv Gandhi Rehabilitation Package -Ordered - Provision of basic amenities to the above houses under Tsunami Rehabilitation Programme - Rs.7.112 crores - Sanctioned - Orders - Issued. PMU
  G.O.Ms.No. 60 
  Dated  29.1.2007

Tsunami 2004 - Construction of houses in vulnerable areas in Coastal Districts - Sanction of funds - Orders Issued.

PMU
  G.O.Ms.No. 49 
  Dated  23.1.2007

Tsunami - TEAP assisted by Asian Development Bank -  Infra-structure Development works such as water supply, sanitation, Building, Roads, and Drains - Cuddalore, Nagapattinam, Kanniyakumari, Tiruvallur Districts - 6 Municipalities - capital works - Total sanction Rs.3660.87 lakhs - Release of Rs.3260.87 lakhs - Orders - Issued.

PMU
  G.O.Rt.No. 18 
  Dated  19.1.2007

Establishment -  G.O.

PMU
  G.O.(1D).No. 14 
  Dated  19.1.2007

Establishment -  G.O.

PMU
  G.O.Ms.No. 39 
  Dated  12.1.2007

Tsunami Emergency Assistance Project (TEAP) assisted by the Asian Development Bank – Implementation of Livelihood Support Programme for the Tsunami affected persons in Urban Local Bodies – Proposals approved by Empowered Committee – Amount of Rs.372.60 lakhs sanctioned – Orders – Issued - Amendment Issued.

PMU
  G.O.Ms.No. 22 
  Dated  10.1.2007

Tsunami – Tsunami Relief and Rehabilitation measures to be taken up – Special Staff for the Project Management Unit, ETRP/TEAP, Office of the Special Commissioner and Commissioner of Revenue Administration – Sanctioned – Orders – Issued – Retention of staff beyond 31.12.2006 – Orders - Issued.

PMU
  G.O.Ms.No. 13 
  Dated  8.1.2007

Tsunami - Relief and Rehabilitation - Asian Development Bank assisted Tsunami Emergency Assistance Project (TEAP) - Execution of schemes - Rehabilitation of Tsunami affected areas in Town Panchayats - Additional staff salaries - Sanction of funds for the year 2006-07 - Rs.75.66 lakhs - Sanctioned - Orders - Requested - Regarding.

Town Panchayats
  G.O.Ms.No. 9 
  Dated  4.1.2007

Tsunami - Relief and Rehabilitation - World Bank aided Emergency Tsunami Reconstruction Project (ETRP) and Asian Development Bank aided Tsunami Emergency Assistance Project (TEAP) - Conduct of internal audit of Rural Development Department covering District Rural Development Agencies in 12 coastal districts - Conduct of audit by M/s. Sushil Jeetpuria & Company, Chartered Accountants, New Delhi - Administrative approval - Accorded - Orders - Issued.

RD & PR
( TPIU )
  G.O.Ms.No. 5 
  Dated  3.1.2007

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) - Execution of sanitation facility schemes to Permanent Shelters in tsunami affected Districts by Tamil Nadu Water Supply and Drainage  Board –Formation of Project Monitoring Unit at head office, 7 District Implementation Units, and sanction of staff - proposal approved by Empowered Committee – Amount sanctioned – Orders – Issued.

TWAD