 Government Orders Issued for Tsunami Relief  for the year 2010

GO No & Date GO Details Departments / Districts
G.O Ms No.702
Date :31-12-2010

Establishment -  G.O.

PMU
G.O Ms No.693
Date :23-12-2010

World Bank aided Emergency Tsunami Reconstruction Project (ETRP) - Restructured ETRP-VRCC Programme - Construction of in-situ houses in rural areas by Rural Development and Panchayat Raj Department - Appointment of NGO Facilitators for implementation of project - Release of balance amount of Rs.82.46 crore - Orders issued.

RD & PR
( TPIU )
G.O Ms No.675
Date :20-12-2010

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) - Staff sanctioned to Tsunami Project Implementation Unit at State level and District Tsunami Implementation Unit at District level in Rural Development and Panchayat Raj Department - Drawal of funds for the payment of Salary and Non-salary items for the year 2010-2011 - Balance amount for the period upto 31.12.2010 – Sanction - Orders issued.

RD & PR
( TPIU )
G.O Ms No.640
Date :29-11-2010

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Project Management Unit - Consultancy Services for Quality Auditing of Civil Works and Social Monitoring of reconstruction of vulnerable houses component under ongoing Emergency Tsunami Reconstruction Project (ETRP) in the coastal Districts of Tamil Nadu - Proposals sent for entering into technical negotiations with M/s. Mukesh & Associates - Approved by the Empowered Committee - Orders Issued.

PMU
G.O Ms No.605
Date :19-11-2010

Establishment -  G.O.

Fisheries
G.O Ms No.601
Date :19-11-2010

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) - Raising of shelterbelt plantations and Mangrove cultivations in coastal areas of Tamil Nadu - Documentation of the above works - Sanction of Rs.2.50 lakhs - Approved by Empowered Committee - Orders issued

Forest
G.O Ms No.539
Date :20-10-2010

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) - Proposal for Consultancy service for “Design of Evacuation shelter and Routes and provision of signages in 11 Tsunami affected Coastal Districts of Tamil Nadu” - Under Emergency Tsunami Reconstruction Project (ETRP) - Proposals approved by Empowered Committee -  Amendment Issued.

PMU
G.O Ms No.530
Date :15-10-2010

Establishment -  G.O.

PMU
G.O Ms No.502
Date :04-10-2010

Establishment -  G.O.

PMU
G.O Ms No.503
Date :04-10-2010
TSUNAMI – Emergency Tsunami Reconstruction Project (ETRP) with World Bank Assistance Construction of fish landing centre at Portonovo – Annankoil in Cuddalore District - Approved by Empowered Committee -  Revised Administrative Sanction - Orders - Issued Fisheries
G.O Ms No.504
Date :04-10-2010
TSUNAMI – Emergency Tsunami Reconstruction Project (ETRP) with World Bank Assistance Reconstruction and Modernization of Nagapattinam Fishing harbour in Nagapattinam District - Approved by Empowered Committee -  Revised Administrative Sanction - Orders - Issued Fisheries
G.O Ms No.505
Date :04-10-2010
TSUNAMI – Emergency Tsunami Reconstruction Project (ETRP) with World Bank Assistance Reconstruction and Modernization of Pazhayar Fishing harbour in Nagapattinam District - Approved by Empowered Committee -  Revised Administrative Sanction - Orders - Issued Fisheries
G.O Ms No.480
Date :28-09-2010

Tsunami - Prime Minister's Scholarship Scheme - Balance amount wrongly debited into State Government Account by Pudukottai District Administration - Sanction of amount under Prime Minister's Scholarship Scheme - Orders - Issued.

PMU
G.O Ms No.481
Date :28-09-2010
Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Tamil Nadu Slum Clearance Board - Re-employment of Thiru. D. Samuel Sathianesan, Superintending Engineer (retired) as Engineering Specialist on contract basis in Tamil Nadu Slum Clearance Board - Approved by Sub-Committee - Sanction - Orders - Issued TNSCB
G.O Ms No.474
Date :23-09-2010

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) - Proposal for Consultancy service for ''Design of Evacuation shelter and Routes and provision of signages in 11 Tsunami affected Coastal Districts of Tamil Nadu'' - Under Emergency Tsunami Reconstruction Project (ETRP) - Proposals approved by Empowered Committee - Orders  Issued.

PMU
G.O Ms No.468
Date :21-09-2010

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Erection of Stone Pillars on High Tide Line reference points along the coast of Tamil Nadu to be executed by the Forest Department at a cost of Rs.82.65 lakhs - Approved by Empowered Committee - Amount sanctioned - Amendment - Issued.

Forest
G.O Ms No.262
Date :02-09-2010

Establishment -  G.O.

PMU
G.O Ms No.368
Date :12-08-2010

Tsunami - Emergency Tsunami Reconstruction Project (ETRP)-Vulnerability Reduction of Coastal Communities (VRCC) Programme -Release of funds for construction of vulnerable houses - Request for sanction and release of funds for reconstruction of 15,056 vulnerable houses besides rental and one time shifting allowance - Sanction of a sum of Rs.117.54 crore (Rupees One hundred seventeen crore and fifty four lakhs only) as first Instalment - Approved by Empowered Committee - Orders - Issued.

PMU
G.O Ms No.349
Date :02-08-2010

Establishment -  G.O.

PMU
G.O Ms No.340
Date :22-07-2010

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Staff sanctioned to Tsunami Project Implementation Unit at State Level and District Tsunami Implementation Units at District Level in Rural Development & Panchayat Raj Department - Sanction of funds for Second Quarter of the year 2010-2011 - Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.235
Date :21-07-2010

Establishment -  G.O.

PMU
G.O Ms No.329
Date :16-07-2010

Establishment -  G.O.

PMU
G.O Ms No.320
Date :30-06-2010

Tsunami - Nagapattinam District - Construction of 257 NGOs backed out houses at Chinnankudi - Sanction of additional amount to continue and complete the construction - Orders - Issued

PMU
G.O Ms No.319
Date :30-06-2010

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Audit on Emergency Tsunami Reconstruction Project (ETRP) for the year 2006-2007 and 2007-2008 - Excess expenditure pointed out by Accountant General (Civil Audit) - Ratification for excess expenditure  of Rs.6,68,839/- towards reclamation of sand cast agricultural lands by Joint Director of Agriculture, Nagapattinam - Approved by Empowered Committee - Orders - Issued.

Agriculture
G.O Ms No.318
Date :28-06-2010

Establishment -  G.O.

Fisheries
G.O Ms No.302
Date :18-06-2010

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Bio-remediation of selected water bodies - Execution of Bio-remediation works in Pallikaranai Marsh Land by the Tamil Nadu Forest Department at a cost of Rs.4.00 crore under Emergency Tsunami Reconstruction Project (ETRP) - Approved by Empowered Committee - Orders - Issued.

Forest
G.O Ms No.282
Date :10-06-2010

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Implemented by Tamil Nadu Water Supply and Drainage Board - Further continuance of Project Monitoring Unit at Head Office and 4 District Implementing Units at Kancheepuram, Cuddalore, Kanniyakumari and Nagapattinam (each 1 unit) for a period of one year from 1.4.2010 to 31.3.2011 and 2 District Implementing Units at Villupuram and Nagapattinam (each 1 unit) for a period of six months from 1.4.2010 to 30.9.2010 - Approved by Sub-Committee - Expenditure sanctioned - Orders - Issued.

 

TWAD
G.O Ms No.282
Date :10-06-2010

(Anx.)

G.O Ms No.188
Date :10-06-2010

Establishment -  G.O.

PMU
G.O Ms No.245
Date :25-05-2010

Tsunami 2004 - Tsunami Rehabilitation Programme - Construction of houses - Provision of Septic tanks with soak pits to the NGO constructed houses on Saveriyarkoil habitation in Ivanallur Panchayat in Nagapattinam District - Approved by Empowered Committee - Amount sanctioned - Orders - Issued - Amendment - Issued.

PMU
G.O Ms No.243
Date :25-05-2010

Establishment -  G.O.

PMU
G.O Ms No.233
Date :19-05-2010

Tsunami - Asian Development Bank assisted Tsunami Emergency Assistance Project (TEAP) - Visit of Executive Board Directors of Asian Development Bank on 31.01.2010 and 01.02.2010 - Expenditure for the visit - Sanction - Orders - Issued.

PMU
G.O Ms No.232
Date :18-05-2010

Tsunami - Villupuram District - 63 houses in Chinnamudaliyar chavadikuppam damaged due to Sea erosion - Provision of rental allowance to 63 families - Extension of provision of rent for further period of one year from November 2008 to October 2009 - Approved by Empowered Committee - Sanction - Orders - Issued.

PMU
G.O Ms No.231
Date :18-05-2010

Establishment -  G.O.

Environment
G.O Ms No.229
Date :14-05-2010

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Conduct of Internal Audit by a concern of Chartered Accountants - Selection of M/s. Padmanabhan Ramani & Ramanujam, Chartered Accountant, Chennai - Sanction of Audit fees of Rs.18,64,070/- - Approved by Empowered Committee - Orders - Issued

PMU
G.O Ms No.228
Date :14-05-2010

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Monitoring the movement and nesting of Oliver Ridley Sea Turtle along the coastal stretches of Chengalpattu and Madurantakam ranges (Kancheepuram District) and Vedaranyam range (Nagapattinam District) - Engaging an independent agency - Sanction of fund - Approved by Empowered Committee - Orders -  Issued.

PMU
G.O Ms No.227
Date :14-05-2010

Establishment -  G.O.

PMU
G.O Ms No.226
Date :14-05-2010

Establishment -  G.O.

PMU
G.O Ms No.225
Date :14-05-2010

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Publishing the express of Interest in an English daily having nation wide circulation for the appointment of Internal auditors to audit the Emergency Tsunami Reconstruction Project (ETRP) accounts for the period from October 2009 to December 2011 - Sanction of advertisement charges to M/s. Accord Advertising Agencies, Chennai - Orders - Issued.

PMU
G.O Ms No.218
Date :11-05-2010

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Erection of Stone Pillars on High Tide Line reference points along the coast of Tamil Nadu to be executed by the Forest Department at a cost of Rs.82.65 lakhs - Approved by Empowered Committee - Orders - Issued.

Forest
G.O Ms No.212
Date :07-05-2010

Tsunami - Tsunami Emergency Assistance Project (TEAP) assisted by the Asian Development Bank - Construction of SHG marketing Complex near Valluvarkottam, Chennai by the Tsunami Project Implementation Unit, Rural Development & Panchayat Raj Department - Revised Administrative Sanction of Rs.15.32 crore - Approved by Empowered Committee - Orders - Issued.

RD & PR
( TPIU )
G.O Ms No.204
Date :04-05-2010

Tsunami - Reconstruction of vulnerable houses in urban areas constructed by Tamil Nadu Slum Clearance Board - Sanction of  Rs.8875.42 lakh  - Orders - Issued.

TNSCB
G.O Ms No.202
Date :03-05-2010

Establishment -  G.O.

Town Panchayats

G.O Ms No.181
Date :16-04-2010

Establishment -  G.O.

PMU
G.O Ms No179
Date :15-04-2010

Establishment -  G.O.

PMU
G.O Ms No.7
Date :31-03-2010

Tsunami – Villupuram District – Construction of Compound wall, Setting up of a Bore well and construction of fully mechanized pump room in the Mutt land as part of condition to be fulfilled in lieu of acquisition of Mutt land for construction of house in Phase-I housing programme in Pillachavadi Village in Vanur Taluk – Sanction of funds -  Orders - Issued.

RD & PR
( TPIU )
G.O Ms No158
Date :31-03-2010

World Bank aided Emergency Tsunami Reconstruction Project (ETRP) - Restructured Emergency Tsunami Reconstruction Project (ETRP)-Vulnerability Reduction of Coastal Communities (VRCC) Programme - Construction of in-situ houses in rural areas by Rural Development and Panchayat Raj Department - Appointment of NGO facilitators for the implementation of the project and Payment of mobilization advance to the contractors - Sanction of funds for a sum of Rs.10.00 crore - Approved by Empowered Committee - Orders - Issued

RD & PR
( TPIU )
G.O Ms No157
Date :30-03-2010

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Tamil Nadu Slum Clearance Board - Release of Rs.235.67 lakhs towards the Incremental Operating Cost for the year 2009-2010 - Sanction - Orders - Issued

TNSCB
G.O Ms No122
Date :11-03-2010

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) - Staff sanction to Tsunami Project Implementation Unit at State level and District Tsunami Implementation Unit at District level in Rural Development and Panchayat Raj Department - Sanction of funds for III Instalment for the year 2009-2010 - Orders - Issued.

RD & PR
( TPIU )
G.O Ms No119
Date :11-03-2010

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Continuance of two Project Co-ordination Units at Nagapattinam and Thoothukudi from 1.12.2008 to 31.3.2009 and one Technical Cell in the Directorate from 1.12.2008 to 31.3.2010 - Approved by Sub-Committee - Orders -  Issued

Environment
G.O Ms No107
Date :08-03-2010

Tsunami - Tsunami Emergency Assistance Project (TEAP) assisted by the Asian Development Bank - Implementation of Water Supply Schemes and Recharge structures by Tamil Nadu Water Supply and Drainage Board - Continuance of posts sanctioned for the Project Monitoring Unit at Head Office, Chennai and one District Implementation Unit with Head Quarters at Vallyoor in Tirunelveli and two Sub-Divisions  each at Tirunelveli and Kanniyakumari and office expenses for the period from 1.4.2009 to 30.6.2009  - Approved by the Sub - Committee - Ratification - Orders - Issued.

TWAD
G.O Ms No105
Date :05-03-2010

Establishment -  G.O.

PMU
G.O Ms No.101
Date :01-03-2010

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Animal Husbandry Department - Construction of Sub-Center buildings by Public Works Department - Provision of toilet facility-cum-water supply arrangements to 6 Sub-Centers in Thanjavur District - Sanction of additional funds for Rs.4.60 lakhs - Approved by Empowered Committee - Orders - Issued.

Animal Husbandry

G.O Ms No.95
Date :01-03-2010

World Bank aided Emergency Tsunami Reconstruction Project (ETRP) - Vulnerability Reduction of Coastal Communities (VRCC)  - Approval given by World Bank - Construction of Evacuation Shelters and routes - Permission for inviting "Expression of Interest" for hiring Consultancy services for "Designing of Evacuation Shelters and routes" and for Third Party Quality Auditing of works and Social Monitoring aspects taken up under Vulnerability Reduction of Coastal Communities (VRCC)  - Approved by the Empowered Committee - Orders - Issued - Sanction of Advertisement charges - Orders - Issued.

PMU
G.O Ms No.90
Date :26-02-2010

Tsunami 2004 - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Public Works Department (Buildings) - Revised Administrative Sanction for Reconstruction of Veterinary Sub-Centre at Muthaliarkuppam in Kancheepuram District sanctioned under Emergency Tsunami Reconstruction Project (ETRP) - Additional sanction of Rs.2.00 lakhs - Approved by Empowered Committee - Orders - Issued.

PWD (Buildings)

G.O Ms No.41
Date :
23-02-2010

Establishment -  G.O.

PMU
G.O Ms No.27
Date :
09-02-2010

Establishment -  G.O.

PMU
G.O Ms No.29
Date :
09-02-2010

Establishment -  G.O.

PMU
G.O Ms No.53
Date :-
3-02-2010

(Exposure Visit)  Establishment -  G.O.

PMU
G.O Ms No.54
Date :04-02-2010

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Forest Department - Rising Shelterbelt Plantation in private lands during 2008-2009 in tsunami affected coastal areas of Tamil Nadu, upkeep of plantations upto 2010-2011 and continuance of Emergency Tsunami Reconstruction Project (ETRP) Cell upto December 2010 in the office of the Principal Chief Conservator of Forests - Sanctioned - Release of Rs.55.20 lakhs towards first year maintenance of shelterbelt plantation for the year 2009-2010 and Establishment cost of Emergency Tsunami Reconstruction Project (ETRP) Cell - Orders - Issued.

Forest
G.O Ms No.62
Date :
18-02-2010

Tsunami - Project Management Unit - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Hiring of Consultancy Service for “Third Party Technical and Quality Auditing” of buildings, other construction and infrastructure works - Contract awarded to M/s. Mukesh and Associates, Salem - Extension of contract for a further period of six months form 13.12.2008 to 12.06.2009 and for deploying two teams one each at Chennai and one each at Nagapattinam - Approved by Empowered Committee - Amount sanction - Orders - Issued - Amendment - Issued.

PMU
G.O Ms No.90
Date :26-02-2010

Establishment -  G.O.

TNSCB
G.O Ms No.46
Date :29-01-2010

TTsunami 2004 - Tamil Nadu Slum Clearance Board - World Bank funded Emergency Tsunami Reconstruction Project (ETRP) - Marina re-development project - Implementation through World Bank - De-linking the construction of tenements under Sub-project 3 of Phase-I (i.e.) Foreshore Estate (992 Nos.) and Phase-II of Srinivasapuram (2584 Nos.) of Marina project from the purview of Emergency Tsunami Reconstruction Project (ETRP) and to take up the work from any other programme or under State Fund - Approved by Empowered Committee - Orders - Issued

TNSCB
G.O Ms No.42
Date :28-01-2010

Establishment -  G.O.

Town    Panchayat

G.O Ms No.31
Date :25-01-2010

Establishment -  G.O.

Town    Panchayat

G.O Ms No.29
Date :22-01-2010

Establishment -  G.O.

PMU
G.O Ms No.18
Date :13-01-2010

Tsunami - Asian Development Bank assisted Tsunami Emergency Assistance Project (TEAP) - Construction of High Level Bridge across Vellar river at KM 11/4 of Killai Road - Revised administrative sanction of Rs.16.00 crores under Asian Development Bank assisted Tsunami Emergency Assistance Project (TEAP) - Approved by Empowered Committee - Orders - Issued

Highways
G.O Ms No.14
Date :08-01-2010

Tsunami - Emergency Tsunami Reconstruction Project (ETRP) assisted by World Bank - Fisheries Department - Sanction of one post of Watchman for the Tsunami Project Implementation Unit, Fisheries Department, Chennai - Approved by Sub-Committee - Orders - Issued.

Fisheries

 

 