green
merron
blue
brown
Blue

You are here

Water Resources Department
Year : 2022
G.O.(D) No.281 Dt: November 21, 2022   Download Icon 2MBTamil Nadu Water Resources Department – Revised Administrative Sanction for a sum of Rs.9008.26 lakh including additional requirement of Rs.925.33 lakh under State Fund against original Administrative Sanction of Rs.8082.93 lakh to take up 85 Water Bodies under Phase VII of Repair, Renovation and Restoration (RRR) Scheme under Har Khet Ko Pani component of Pradhan Mantri Krishi Sinchayee Yojana - Accorded – Orders- Issued.
G.O.(D) No. 279 Dt: November 21, 2022   Download Icon 2MBTamil Nadu Water Resources Department – Administrative Sanction to take up Repair, Renovation and Restoration of 100 water bodies at an outlay of Rs.10092.67 Lakhs under Phase IX of Har Khet Ko Pani component of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) with Central State Share ratio 60 (Central- Rs.6055.60lakhs) 40 (State-Rs.4037.07 lakhs) -Accorded – Orders- Issued.
G.O.(D) No.280 Dt: November 21, 2022   Download Icon 3MBTamil Nadu Water Resources Department –Revised Administrative Sanction for a sum of Rs.9282.98 lakh including additional requirement of Rs.905.94 lakh under State Fund against original Administrative Sanction of Rs.8377.04 lakh to take up 100 Water Bodiesunder Phase VIII of Repair, Renovation and Restoration (RRR) Scheme under Har Khet Ko Pani component of Pradhan Mantri Krishi Sinchayee Yojana - Accorded – Orders- Issued.
G.O.(Ms) No.93 Dt: November 15, 2022   Download Icon 500KBTamil Nadu Irrigated Agriculture Modernization Project (TNIAMP) - Acceptance for Reallocation of additional fund of Rs.2.00crore to Tamil Nadu Veterinary and Animal Sciences University from outlay of Rs.87.46 crore allocated to Tamil Nadu Agriculture University – Accorded –Orders - Issued.
G.O.(D) No. 273 Dt: November 10, 2022   Download Icon 3MBTamil Nadu Irrigated Agriculture Modernization Project (TNIAMP)–Water Resources Department - Administrative sanction for a sum of Rs.272.18crore to take up works for 21 packages in 8 sub basins viz., Lower Vellar, Thurinjalar, Poiney, Lower Coleroon, Sathaiyar, Therkkar, Lower Vaigai and Aliyar sub basins under Phase IV of World Bank assisted TNIAMP- Orders- Issued.
G.O.(2D)No.67 Dt: October 19, 2022   Download Icon 16MBWater Resources Department – Announcement made by Hon’ble Minister (Water Resources) for 2021 – 2022 – Rehabilitation Works pertaining to all Regions – Administrative sanction accorded – Financial Sanction now accorded– Orders issued
G.O.(D) No.257 Dt: October 11, 2022   Download Icon 2MBTamil Nadu Irrigated Agriculture Modernization Project (TNIAMP) - Strengthening the Institute for Water Studies, Hydrology and Quality Control, Tharamani, Chennai-113 and Capacity Building of TNIAM Project –Estimated cost of Rs.622.58 lakhs– Administrative Sanction – Accorded- Orders –Issued.
G.O.(Ms) No.87 Dt: October 11, 2022   Download Icon 784KBTamil Nadu Irrigated Agriculture Modernization Project (TNIAMP) - Approval for Revised Estimate for Procurement of 10 Non-Nuclear Soil Density Gauge and 4 Advanced Cover meter for Quality Control labs of Quality Control Divisions under the control of Institute for Water Studies, Hydrology and Quality Control, Tharamani at a cost of Rs.1.65 crore against original estimate for Procurement of 10 Non-Nuclear Soil Density Gauge and 6 Advanced Cover meter at a cost of Rs.1.65 crore– Accorded- Orders –Issued.
G.O.(2D)No.62 Dt: September 19, 2022   Download Icon 4MBWater Resources Department – Reconstruction of Reinforced Cement Concrete Bridge across AVM Canal near Marthandamthurai in Kollancode-B Village at Killiyoor Taluk of Kanniyakumari District at an estimate amount of Rs.34,20,089/- Administrative and Financial sanctions accorded - Orders issued.
G.O.(Ms)No.83 Dt: September 19, 2022   Download Icon 2MBWater Resources Department - Revised Administrative Sanction for Environment Impact Assessment Study and Preparation of Detailed Project Reports for formation of 4 new Reservoirs in Kanniyakumari, Tenkasi and Tirunelveli Districts – Incurring of Advertisement Charges - Revised Administrative Sanction for Rs.9.595 Crore – Accorded – Orders issued.
G.O.(D) No.233, Dt: September 06, 2022   Download Icon 624KBTamil Nadu Water Resources Department- Sanction to empower State Technical Advisory Committee already constituted for scrutinizing and giving clearance for the project proposals of Repair, Renovation and Restoration of Water Bodies under Har Khet Ko Pani (HKKP) component of Centrally Sponsored Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to act as State Technical Advisory Committee for the Surface Minor Irrigation Schemes under Har Khet Ko Pani (HKKP) component of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) State Technical Advisory Committee -Accorded-Orders- Issued.
G.O.(D) No.229 Dt: September 02, 2022   Download Icon 303KBTamil Nadu Water Resources Department - Har Khet Ko Pani (HKKP) component of Pradhan Mandhiri Krishi Sinchayee Yojana (PMKSY)-Phase-VIII-Administrative and Financial Sanction for an estimate amount of Rs.8377.04 lakh for carrying out Repair, Renovation and Restoration works of 100 water bodies – Orders – Amendment –issued.
G.O.(D) No.210 Dt: August 11, 2022   Download Icon 712KBTamil Nadu Water Resources Department - DRIP-II- Administrative Sanction for Rehabilitation and Improvements of Kelavarapalli Dam and Park under DRIP II in Hosur Taluk of Krishnagiri District for an amount of Rs.3052.00lakhs- Accorded – Orders- Issued.
G.O.(2D)No.55 Dt: August 10, 2022   Download Icon 793KBWater Resources Department – Announcement made by the Hon’ble Minister (Water Resources) for 2021 – 2022 -Preparation of Detailed Project Report for desilting of the Gundar and Ramanadhi Reservoirs in Tenkasi District at an estimated cost of Rs.61.36 lakh - Administrative and Financial Sanction accorded - Orders issued.
G.O.(D) No.208 Dt: August 10, 2022   Download Icon 2MBTamil Nadu Water Resources Department –Har Khet Ko Pani (HKKP) component of Pradhan Mandhiri Krishi Sinchayee Yojana (PMKSY)–Phase-VIII- Administrative and Financial Sanction for an estimate amount of Rs.8377.04 Lakh for carrying out Repair, Renovation and Restoration works of 100 water bodies with Central State Share ratio 60 (Central- Rs.5026.22lakhs) 40 (State-Rs.3350.82 lakhs)- Accorded – Orders- Issued.
G.O.(D) No.191 Dt: July 22, 2022   Download Icon 2MBWater Resources Department – Climate Adaptation in Vennar Sub-basin in Cauvery Delta Project assisted by Asian Development Bank – Establishment of Project Management Unit and Project Implementation Units- Continuation of posts and permission to fill up posts through outsourcing – Delegation of Administrative and Financial powers to Project Director – Sanction of Rs.83.00 lakhs towards operating cost for the period from 1.4.2022 to 31.3.2023 – Orders- Issued.
G.O.(Ms) No.63 Dt: July 20, 2022   Download Icon 2MBWater Resources Department – Climate Adaptation in Vennar Sub-basin in Cauvery Delta Project assisted by Asian Development Bank – Establishment of Project Management Unit and Project Implementation units- Continuation of posts and permission to fill up posts through outsourcing – Delegation of Administrative and Financial powers to Project Director – Sanction of operating cost for the period from 1.4.2021 to 31.3.2022 – Orders- Issued.
G.O.(Ms) No.64 Dt: July 20, 2022   Download Icon 554KBTamil Nadu Irrigated Agriculture Modernization Project - Water Resources Department- Third Party Technical Examination of works under Tamil Nadu Irrigated Agriculture Modernization Project - Revised Administrative Sanction for an amount of Rs.13,49,43,980/- against original Administrative Sanction of Rs.9.50 crore– Accorded- Orders –Issued.
G.O.(D)No.183 Dt: July 18, 2022   Download Icon 2MBWater Resources Department – Providing 5 ton chain pulley block and repair and replacement of sides, bottom and top rubber seal in river sluice shutter in Mirugandanadhi Reservoir Project in Polur Taluk of Tiruvannamalai District at a cost of Rs.4.67 lakh – Sanction accorded - Orders issued.
G.O.(Rt) No.217 Dt: July 18, 2022   Download Icon 231KBWater Resources Department – Ratification of action of Dr.Sandeep Saxena,I.A.S., Additional Chief Secretary to Government, Water Resources Department proceeded to New Delhi by Air Travel in Business class to participate in the National Workshop on “Dam Safety Act, 2021 for Dam Safety Governance in India” held on 16.6.2022- Orders – Issued.