Highways and Rural Works Department – NABRD RIDF V – Construction/Reconstruction of flood damaged bridges and improvement of Rural Roads to other District standards under interstate Road Development between Tamil Nadu and Andhra Pradesh States with loan assistance from NABARD – Approved-Orders – Issued.
HIGHWAYS (HW 1) DEPARTMENT
G.O.Ms.No.28 Dated 15.2.2000
Read:
- From the Chief engineer (H) Rural Roads Letter
No.16284/97/P1 dated 27.7.99 and 23.1.2000.
- From the Chief Engineer (H) NABARD Letter
No.1706/99/A3 dated 5.11.99 and 24.1.2000.
- From the Deputy General Manager, NABARD Letter
No.NB/TN/9646/RIDF 30/99-2000 dated 12.01.2000.
ORDER:
In the letters first read above, the Chief Engineer (Highways) Rural roads has sent proposals for improvements to 4 roads to a length of 22.60 kms along with 6 bridges at a cost of Rs.6.5479 Crores, under Interstate Road Development between Tamil Nadu and Andhra Pradesh States.
2. In the letter second read above, the Chief Engineer (H) NABARD has sent proposals for Construction/Reconstruction of 27 bridges at a cost of Rs.41.5247 Crores.
3. The NABARD, in their letter third read above have sanctioned the construction of 33 bridges in rural roads and improvements to 4 Rural Roads to a length of 22.60 Kms in Vellore District., under Inter State Road Development between Tamil Nadu and Andhra Pradesh States, at a total cost of Rs.48,0726 Crores. Out of this, the Government contribution would be Rs.4.8077 Crores (10% of the Project Cost) and the NABARD loan assistance would be Rs.43.2649 Crores. The Chief Engineer (H) Rural Roads and the Chief Engineer (H) NABARD have requested for issue of administrative sanction for the schemes.
4. The Government have carefully examined the proposals of the Chief engineer (H) Rural Roads and the Chief Engineer (H), NABARD in the light of the sanction accorded by NABARD as said in para 3 above and accordingly accord administrative sanction for 37 works ( 4 road works and 33 bridge works) at a total cost of Rs.48.0726 Crores (Rupees Forty eight crores, seven lakhs and twenty six thousand only) as detailed in the Annexures I and II to this order. The Chief Engineer (H), Rural Roads and the Chief Engineer (H) NABARD are requested to take immediate action for the early completion of the works.
5. The expenditure sanctioned in para 4 above shall be debited to the following heads of account:
Name of the
Scheme |
No. of
Works |
Length
In Kms. |
Amount
Rs. In
Crores |
Head of Account |
Rural Roads Scheme (Chief Engineer (H) Rural Roads |
10
(Bridges 6
Roads 4)
(Details given in annexure III) |
22.60 |
6.5479
(Rupees Six crores fifty four lakhs seventy nine thousand only) |
5054-Capital outlay on roads and bridges o4-District and other Roads-337-Road work-Schemes in the Ninth Five Year Plan II.State Plan JI-Improvement to Rural Roads with loan assistance from NABARD 16 Major works).
(D.P.code No.5054-04-337-JI-1601) |
Bridges Scheme (Chief Engineer (H) NABARD) |
27
(Details given in annexure IV) |
--- |
41.5247
(Rupees Forty one Crores fifty two lakhs forty seven thousand only) |
5054-Capital outlay on roads and bridges-04-Major District and Other District Roads-337-Roads and Bridges-Schemes in the Ninth Five Year Plan-II. State Plan JK Improvement to District and Other roads with loan assistance from NABARD 16 Major works.
(D.P.Code No.5054-04-337-JK-1607) |
Total Rs.48.0726 Crores.
This order issues with the concurrence of Finance Department vide its U.O.No.975/JS(LSR)/2000-1 dated 10.2.2000.
(BY ORDER OF THE GOVERNOR)
M.ABUL HASSAN
SECRETARY TO GOVERNMENT
To
The Chief Engineer Highways, Rural Roads,Chennai-25(w.e)
The Chief Engineer (Highways) NABARD,Chennai 32.
The Deputy General Manager, NABARD 105-106, Nungambakkam High Road, Chennai-34.
The Accountant General, Chennai 18/35/6
The Chief Engineer (Gl.), Highways and Rural Works, Chennai –5.
Copy to:
The Finance (Resources / PW I) Department,Chennai-9.
The Finance (IFIA) Department, Chennai-9.
All schemes sections in Highways Department, Chennai-9.
/Forwarded/ by order/
SECTION OFFICER.
ABSTRACT
IMPROVEMENTS TO OTHER DISTRICT ROADS
PHASE II
S.NO. |
DIVISION |
LENGTH TAKEN UP
(KMS) |
COST IN RUPEES (Lakhs) |
1. |
Saidapet |
183.89 |
680.00 |
2. |
Chengalpattu |
157.49 |
701.00 |
3. |
Vellore |
218.27 |
811.00 |
4. |
Villupuram |
159.36 |
604.00 |
5. |
Kallakurichi |
172.00 |
572.00 |
6. |
Cuddalore |
191.26 |
960.00 |
7. |
Tiruvannamalai |
255.35 |
878.00 |
8. |
Ariyalur |
142.80 |
638.50 |
9. |
Trichy |
138.45 |
589.00 |
10. |
Thanjavur |
181.37 |
728.00 |
11. |
Nagapattinam |
182.17 |
658.00 |
12. |
Thiruvarur |
123.40 |
503.00 |
13. |
Pudukkottai |
201.80 |
700.00 |
14. |
Madurai |
101.40 |
466.00 |
15. |
Theni |
65.80 |
290.00 |
16. |
Dindigul |
131.40 |
596.80 |
17. |
Sivaganga |
151.62 |
500.00 |
18. |
Paramakudi |
127.60 |
649.70 |
19. |
Coimbatore |
48.12 |
203.00 |
20. |
Pollachi |
74.85 |
316.00 |
21. |
Erode |
108.42 |
484.00 |
22. |
Gobichettipalayam |
86.00 |
391.00 |
23. |
Ooty |
53.45 |
350.00 |
24. |
Salem |
175.42 |
718.00 |
25. |
Namakkal |
106.47 |
413.00 |
26. |
Krishnagiri |
245.79 |
840.00 |
27. |
Karur |
84.50 |
290.00 |
28. |
Tirunelveli |
130.78 |
580.00 |
29. |
Virudhunagar |
224.10 |
960.00 |
30. |
Tuticorin |
153.14 |
580.00 |
31. |
Nagercoil |
110.97 |
350.00 |
| |
Total |
4487.44 |
18000.00 |
Sugarcane Roads |
415.89 |
2000.25 |
Grand Total |
4903.33 |
20000.25 |
ANNEXURE I
SANCTION OF LOAN UNDER RIDF V TAMIL NADU
Rs.in Lakh)
Sl.No. |
Name of Project |
District |
Poten-tial
(ha/m/
km) |
Latest cost |
Balan-ce cost |
NABARD Loan |
Govt Cont |
99-00 |
00-01 |
01-02 |
Total |
(i) |
RU.BRIDGES |
1. |
Palar at Km 19/2-20/2 |
Kanchee-puram |
883.96 |
1100.00 |
1100.00 |
198.00 |
396.00 |
396.00 |
990.00 |
110.00 |
2. |
At km 4/6-8 of Mettupalayam |
Coimba-tore |
116.00 |
128.90 |
128.90 |
23.20 |
46.40 |
46.41 |
116.01 |
12.89 |
3. |
At km 4/4 of Veerakkal |
Dindigul |
8.80 |
12.80 |
12.80 |
2.30 |
4.61 |
4.61 |
11.52 |
1.28 |
4. |
At Km 0/6 of Veerakkal |
Dindigul |
43.34 |
76.65 |
76.65 |
13.80 |
27.59 |
27.59 |
68.98 |
7.67 |
5. |
Across Vaigai |
Dindigul |
91.65 |
136.20 |
136.20 |
24.52 |
49.03 |
49.03 |
122.58 |
13.62 |
6. |
At Km 8/2 of Alankulam |
Virudhu-nagar |
92.64 |
92.64 |
92.64 |
16.67 |
33.35 |
33.35 |
83.37 |
9.27 |
7. |
At Km 0/8 of Thenkarai |
Madurai |
25.58 |
33.50 |
33.50 |
6.03 |
12.06 |
12.06 |
30.15 |
3.35 |
8. |
Vaigai Km 0/2-0/7 |
Madurai |
258.00 |
439.00 |
439.00 |
79.02 |
158.04 |
158.04 |
395.10 |
43.90 |
9. |
At Km 1/6 of Paravai – Adalai road |
Madurai |
25.28 |
34.00 |
34.00 |
6.12 |
12.24 |
12.24 |
30.60 |
3.40 |
10. |
Across Vaigai Km 0/4 |
Siva-
Ganga |
220.00 |
373.00 |
373.00 |
67.14 |
134.28 |
134.28 |
335.70 |
37.30 |
11 |
Across Bhavani Mevani –K’ |
Erode |
106.00 |
177.18 |
177.18 |
31.89 |
63.78 |
63.79 |
159.46 |
17.72 |
12. |
At Km 0/4 of Alangudi Marmadakki road |
Puduk-kottai |
24.26 |
29.00 |
29.00 |
5.22 |
10.44 |
10.44 |
26.10 |
2.90 |
13 |
At Km 0/10 Balur-Ethapur |
Salem |
36.68 |
56.95 |
56.95 |
10.25 |
20.50 |
20.50 |
51.25 |
5.70 |
14 |
At Km 2/6 of Thennam-bakkam road |
Cudda-lore |
25.28 |
48.00 |
48.00 |
8.64 |
17.28 |
17.28 |
43.20 |
4.80 |
15. |
At Km 3/0 Polur-Pelasur |
T.V.Malai |
107.00 |
147.00 |
147.00 |
26.46 |
52.92 |
52.92 |
132.30 |
14.70 |
16 |
At Km 2/4 of Gudiyattam |
Vellore |
19.28 |
28.85 |
28.85 |
5.19 |
10.38 |
10.39 |
25.96 |
2.89 |
17 |
Across Pulicot in Pulicot |
Thiru-valluvar |
460.00 |
448.00 |
448.00 |
80.64 |
161.28 |
161.28 |
403.20 |
44.80 |
18 |
At Km 7/6 of Chinnasalem |
Villu-puram |
45.00 |
73.85 |
73.85 |
13.29 |
26.58 |
26.59 |
66.46 |
7.39 |
19 |
On Devanur
Gangapuram |
Villu-puram |
11.10 |
14.50 |
14.50 |
2.61 |
5.22 |
5.22 |
13.05 |
1.45 |
20 |
At Km 2/4 of Devanur-Gangapuram |
Villu-puram |
34.12 |
56.50 |
56.50 |
10.17 |
20.34 |
20.34 |
50.85 |
5.65 |
21 |
At Km 5/6 of Vikramanagalm |
Peram-balur |
84.82 |
143.00 |
143.00 |
25.74 |
51.48 |
51.48 |
128.70 |
14.30 |
22 |
At Km 4/4 of Karaikurichi |
Peram-balur |
58.96 |
104.00 |
104.00 |
18.72 |
37.44 |
37.44 |
93.60 |
10.40 |
23 |
At Km 18/4 of T.Palur |
Peram-balur |
14.44 |
19.20 |
19.20 |
3.46 |
6.91 |
6.91 |
17.28 |
1.92 |
24 |
At km 12/4 of T.Palur |
Peram-balur |
94.30 |
173.00 |
173.00 |
31.14 |
62.28 |
62.28 |
155.70 |
17.30 |
25 |
At km 2/6 of P.K. road |
Karur |
58.96 |
81.24 |
81.25 |
14.62 |
29.25 |
29.25 |
73.12 |
8.13 |
26 |
At Km 11/4 of Ammapettai |
Tiru-varur |
26.28 |
52.00 |
52.00 |
9.36 |
18.72 |
18.72 |
46.80 |
5.20 |
| |
Total |
|
3188.65 |
4364.07 |
4364.07 |
785.53 |
1571.03 |
1571.07 |
3927.63 |
436.44 |
ANNEXURE II
Sl.N o |
Name of Project |
District |
Poten-tial
(ha/m/
km) |
Latest cost |
Balance cost |
NABARD Loan |
Govt Cont |
99-00 |
00-01 |
01-02 |
Total |
|
(ii) RU ROADS |
1. |
N’puram A.P.State Border |
Vellore |
1.80 |
24.89 |
24.89 |
4.48 |
8.96 |
8.96 |
22.40 |
2.49 |
2. |
Thimmapatti K’yamman Koli |
Vellore |
4.40 |
60.85 |
60.85 |
10.95 |
21.90 |
21.91 |
54.76 |
6.09 |
3. |
K.V.Kottah-B’lli E’pattu |
Vellore |
8.00 |
153.46 |
153.46 |
27.62 |
55.24 |
55.25 |
138.11 |
15.35 |
4. |
K.V.Kottah Road-Aravatla |
Vellore |
8.40 |
203.99 |
203.99 |
36.72 |
73.44 |
73.43 |
183.59 |
20.40 |
|
Total |
|
22.60 |
443.19 |
443.19 |
79.77 |
159.54 |
159.55 |
398.86 |
44.33 |
|
Grand Total |
|
|
4807.26 |
4807.26 |
865.30 |
1730.57 |
1730.62 |
4326.49 |
480.77 |
/true copy/
SECTION OFFICER
ANNEXURE III
R.I.D.F.V
BRIDGES AND ROADS TO BE EXECUTED BY CHIEF ENGINEER (H) RURAL ROADS
DISTRICT: VELLORE LENGTH IN KM
DIVISION: R.R. (H),VELLORE RUPEES IN LAKHS
Sl.
No. |
NA-BARD
Sanc-tion
Sl.No. |
Name & Location of Project (Name of work) |
Length
In Km |
Whether
A Plan
Project or not |
Nature of invest-ment (type of project)
Specify Rural Roads/Spl. Comp. Plan/Bus Route) |
Year of commen-cement of the project |
Estimate cost
(Rs. In
Lakhs) |
Probable date of comple-tion |
Name of Union |
Name of marketing
Centres |
Remarks |
1. |
2. |
3. |
4. |
5. |
6. |
7. |
8. |
9. |
10. |
11. |
12. |
| (A) RURAL BRIDGES |
1. |
18 |
Contrn. Of a bridge at Km 5/0 of the road K.V.Kottah to TN state limit |
-- |
Plan
Project |
Rural roads |
1999-2000 |
19.50 |
31.03.2002 |
Pernampet |
Pernampet |
|
2. |
19 |
Constrn. Of a bridge at Km 6/2 of the road K.V.Kottah to TN
Stat e limit |
-- |
Plan Project |
Rural roads |
1999-2000 |
31.20 |
31.03.2002 |
Pernampet |
Pernampet |
|
3. |
20 |
Constrn. Of a bridge at Km 7/0 of the road K.V.Kottah to TN
Stat e limit |
-- |
Plan Project |
Rural roads |
1999-2000 |
31.20 |
31.03.2002 |
Pernampet |
Pernampet |
|
4. |
21 |
Constrn. Of a bridge at Km 0/2 of the road Narayanapuram to Andhra State limit |
-- |
Plan Project |
Rural roads |
1999-2000 |
31.20 |
31.03.2002 |
Natrampalli |
Natrampalli |
|
5. |
22 |
Constrn. Of a bridge at Km 0/2 of the road Thimmampatti Kanaganatchi-amman Koil |
-- |
Plan
Project |
Rural roads |
1999-
2000 |
52.50 |
31.03.2002 |
Natrampalli |
Natrampalli |
|
(a) 165.60 |
| (B) RURAL ROADS |
6. |
1 |
Impvts. To Narayana-puram to
Andhra State
Border |
1.80 |
Plan
Project |
Rural roads |
1999-
2000 |
24.89 |
31.03.2002 |
Natrampalli |
Natrampalli |
|
7. |
2. |
Impvts. To Thimmam-
Pettai-
Kanaganachi-amman koil Km0/0-4/4 |
4.40 |
Plan
Project |
Rural
Roads |
1999-
2000 |
60.85 |
31.03.2002 |
Natrampalli |
Natrampalli |
|
8. |
3 |
Impvts. To K.V.Kottah road to
Erukkam
Patti to TN
State limit |
8.00 |
Plan
Project |
Rural
Roads |
1999-
2000 |
153.46 |
31.03.2002 |
Pernampet |
Pernampet |
|
9. |
4 |
Impvts. To the road Km 47/2 of K.V.Kottah
Km 4/0-12/4 |
8.40 |
Plan
Project |
Rural
Roads |
1999-
2000 |
203.99 |
31.03.2002 |
Pernampet |
Pernampet |
|
| TOTAL 22.60 (b) 443.19 |
ANNEXURE III
R.I.D.F.V
BRIDGES AND ROADS TO BE EXECUTED BY CHIEF ENGINEER (H) RURAL ROADS
DISTRICT: DHARMAPURI LENGTH IN KM
DIVISION: R.R. (H), DHARMAPURI RUPEES IN LAKHS
Sl.
No. |
NA-BARD
Sanc-tion
Sl.No. |
Name & Location of Project (Name of work) |
Length
In Km |
Whether
A Plan
Project or not |
Nature of invest-ment (type of project)
Specify Rural Roads/Spl. Comp. Plan/Bus Route) |
Year of commen-cement of the project |
Estimate cost
(Rs. In
Lakhs) |
Probable date of comple-tion |
Name of Union |
Name of marketing
Centres |
Remarks |
1. |
2. |
3. |
4. |
5. |
6. |
7. |
8. |
9. |
10. |
11. |
12. |
| (a) RURAL BRIDGES |
1. |
3 |
Constrn. Of a high level bridge at Km 0/4 of the road Veppanapalli to O.N.Kothur
(Upto TN State Limit) via Ariyanpalli |
-- |
Plan
Project |
Rural
Roads |
1999-
2000 |
46.00 |
31.03.2002 |
Veppana-
Palli |
Krishna-
giri |
|
( C ) 46.00 |
(a + b + c) 654.79 |
/true copy/
SECTION OFFICER
HIGHWAYS DEPARTMENT
SECRETARIAT, CHENNAI 600 009.
RIDF PROJECT 18
ANNEXURE IV
BRIDGE WORKS TO BE EXECUTED BY CHIEF ENGINEER (H), NABARD
Rs. In Lakhs
Sl.No. |
Name of Project |
District |
Poten-tial
(ha/m/
km) |
Latest cost |
Balance cost |
NABARD Loan |
Govt Cont |
99-00 |
00-01 |
01-02 |
Total |
|
|
RU BRIDGES |
|
1. |
Reconstruction of High level bridge across Palar at Km 19/2-20/2 of Mamandur Uthiramerur road to Thirumukkudal |
Kanchee-
Puram |
883.96 |
1100.00 |
1100.00 |
198.00 |
396.00 |
396.00 |
990.00 |
110.00 |
2. |
Construction of a high level bridge across 4/6-8 of Mettupalayam Nellithurai road |
Coimba-tore |
116.00 |
128.90 |
128.90 |
23.20 |
46.40 |
46.41 |
116.01 |
12.89 |
3. |
Construction of a minor bridge at Km 4/4 of Veerakkal Village road |
Dindigul |
8.80 |
12.80 |
12.80 |
2.30 |
4.61 |
4.61 |
11.52 |
1.28 |
4. |
Reconstruction of High level bridge at Km 0/6 of Veerakkal Village road |
Dindigul |
43.34 |
76.65 |
76.65 |
13.80 |
27.59 |
27.59 |
68.98 |
7.67 |
5. |
Construction of a high level bridge across Vaigai at Km 0/2 of Ramanaikan-patty road, connecting Rengappanaicken-patty |
Dindigul |
91.65 |
136.20 |
136.20 |
24.52 |
49.03 |
49.03 |
122.58 |
13.62 |
6. |
Reconstruction of a High level bridge at Km 8/2 of Alankulam to District limit |
Virudhu-
Nagar |
92.64 |
92.64 |
92.64 |
16.67 |
33.35 |
33.35 |
83.37 |
9.27 |
7. |
Reconstruction of a high level bridge at Km 0/8 of Thenkarai approach road |
Madurai |
25.58 |
33.50 |
33.50 |
6.03 |
12.06 |
12.06 |
30.15 |
3.35 |
8. |
Reconstruction of a High level bridge across Vaigai river at Km 0/2-0/7 of Thenkarai Approach road |
Madurai |
258.00 |
439.00 |
439.00 |
79.02 |
158.04 |
158.04 |
395.10 |
43.90 |
9. |
Reconstruction of bridge at Km 1/6 of Paravai – Adalai road |
Madurai |
25.28 |
34.00 |
34.00 |
6.12 |
12.24 |
12.24 |
30.60 |
3.40 |
10. |
Reconstruction of bridge across Vaigai Km 0/4 Edaikattur approach road |
Siva-
Gangai |
220.00 |
373.00 |
373.00 |
67.14 |
134.28 |
134.28 |
335.70 |
37.30
|
11 |
Construction of high level bridge Across river Bhavani in between Mevani and Kelvani |
Erode |
106.00 |
177.18 |
177.18 |
31.89 |
63.78 |
63.79 |
159.46 |
17.72 |
12. |
Reconstruction of High level bridge at Km 0/4 of Alangudi Marmadakki road |
Puduk-kottai |
24.26 |
29.00 |
29.00 |
5.22 |
10.44 |
10.44 |
26.10 |
2.90 |
13 |
Construction of high level bridge At Km 4/6 Balur-Ethapur road |
Salem |
36.68 |
73.50 |
73.50 |
13.23 |
26.46 |
26.46 |
66.15 |
7.35 |
14 |
Construction of High level bridge at Km 0/10of Balur – Ethapur road |
Salem |
36.68 |
56.95 |
56.95 |
10.25 |
20.50 |
20.50 |
51.25 |
5.70 |
15. |
Reconstruction of High Level bridge at Km 2/6 of Thennambakkam road |
Cuddalore |
25.28 |
48.00 |
48.00 |
8.64 |
17.28 |
17.28 |
43.20 |
4.80 |
16 |
Construction of bridge at km 3/0 of Polur – Pelasur – Padagam - Mansurabad road |
T.V.Malai |
107.00 |
147.00 |
147.00 |
26.46 |
52.92 |
52.92 |
132.30 |
14.70 |
17 |
Construction of bridge at km 2/4 of Gudiyattam Municipal limit to Thattaparai road |
Vellore |
19.28 |
28.85 |
28.85 |
5.19 |
10.38 |
10.39 |
25.96 |
2.89 |
18 |
Construction of high level bridge across Pulicot lake in Pulicot Light house Kuppam road |
Tiruvallur |
460.00 |
448.00 |
448.00 |
80.64 |
161.28 |
161.28 |
403.20 |
44.80 |
19 |
Construction of high level bridge at km 7/6 of Chinna Salem – Nainarpalayam road |
Villu-puram |
45.00 |
73.85 |
73.85 |
13.29 |
26.58 |
26.59 |
66.46 |
7.39 |
20 |
Widening of existing minor bridge at km 2/4 of Devanur Gangapuram road |
Villu-
Puram |
11.10 |
14.50 |
14.50 |
2.61 |
5.22 |
5.22 |
13.05 |
1.45 |
21 |
Construction of high level bridge at km 5/6 of Vikramangalam Kadambur road |
Villu-
Puram |
34.12 |
56.50 |
56.50 |
10.17 |
20.34 |
20.34 |
50.85 |
5.65 |
22 |
Construction of high level bridge at km 5/6 of Vikramangalam Kadambur road |
Peram-
Balur |
84.82 |
143.00 |
143.00 |
25.74 |
51.48 |
51.48 |
128.70 |
14.30 |
23 |
Reconstruction of a high level bridge at km 4/4 of Karaikurichi – Arul Mozhi Sripuranthan road |
Peram-balur |
58.96 |
104.00 |
104.00 |
18.72 |
37.44 |
37.44 |
93.60 |
10.40 |
24 |
Construction of a high level bridge at km 18/4 of T.Palur, Vilangudi road |
Peram-balur |
14.44 |
19.20 |
19.20 |
3.46 |
6.91 |
6.91 |
17.28 |
1.92 |
25 |
Reconstruction of high level bridge at km 10/4 id T.Palur, Vilangudi road |
Peram-balur |
94.30 |
173.00 |
173.00 |
31.14 |
62.28 |
62.28 |
155.70 |
17.30 |
26 |
Reconstruction of high level bridge at km 2/6 of Palaviduthi – Kadavur road to D.Edayapatti |
Karur |
58.96 |
81.25 |
81.25 |
14.62 |
29.25 |
29.25 |
73.12 |
8.13 |
27 |
Reconstruction of a bridge at km 11/4 of Ammapettai – Vaduvur road |
Tiruvarur |
26.28 |
52.00 |
52.00 |
9.36 |
18.72 |
18.72 |
46.80 |
5.20 |
Total |
|
3032.85 |
4152.47 |
4152.47 |
747.43 |
1494.86 |
1494.90 |
3737.19 |
415.28 |
/true copy/
|