GOVERNMENT OF TAMIL NADU

ABSTRACT

Highways and Rural Works Department – NABRD RIDF V – Construction/Reconstruction of flood damaged bridges and improvement of Rural Roads to other District standards under interstate Road Development between Tamil Nadu and Andhra Pradesh States with loan assistance from NABARD – Approved-Orders – Issued.


HIGHWAYS (HW 1) DEPARTMENT

 

G.O.Ms.No.28                                                                                                                      Dated 15.2.2000

Read:

  1. From the Chief engineer (H) Rural Roads Letter
  2. No.16284/97/P1 dated 27.7.99 and 23.1.2000.

  3. From the Chief Engineer (H) NABARD Letter
  4. No.1706/99/A3 dated 5.11.99 and 24.1.2000.

  5. From the Deputy General Manager, NABARD Letter

No.NB/TN/9646/RIDF 30/99-2000 dated 12.01.2000.

 

ORDER:

In the letters first read above, the Chief Engineer (Highways) Rural roads has sent proposals for improvements to 4 roads to a length of 22.60 kms along with 6 bridges at a cost of Rs.6.5479 Crores, under Interstate Road Development between Tamil Nadu and Andhra Pradesh States.

 

 

2. In the letter second read above, the Chief Engineer (H) NABARD has sent proposals for Construction/Reconstruction of 27 bridges at a cost of Rs.41.5247 Crores.

3. The NABARD, in their letter third read above have sanctioned the construction of 33 bridges in rural roads and improvements to 4 Rural Roads to a length of 22.60 Kms in Vellore District., under Inter State Road Development between Tamil Nadu and Andhra Pradesh States, at a total cost of Rs.48,0726 Crores. Out of this, the Government contribution would be Rs.4.8077 Crores (10% of the Project Cost) and the NABARD loan assistance would be Rs.43.2649 Crores. The Chief Engineer (H) Rural Roads and the Chief Engineer (H) NABARD have requested for issue of administrative sanction for the schemes.

4. The Government have carefully examined the proposals of the Chief engineer (H) Rural Roads and the Chief Engineer (H), NABARD in the light of the sanction accorded by NABARD as said in para 3 above and accordingly accord administrative sanction for 37 works ( 4 road works and 33 bridge works) at a total cost of Rs.48.0726 Crores (Rupees Forty eight crores, seven lakhs and twenty six thousand only) as detailed in the Annexures I and II to this order. The Chief Engineer (H), Rural Roads and the Chief Engineer (H) NABARD are requested to take immediate action for the early completion of the works.

5. The expenditure sanctioned in para 4 above shall be debited to the following heads of account:

Name of the

Scheme

No. of

Works

Length

In Kms.

Amount

Rs. In

Crores

Head of Account

Rural Roads Scheme (Chief Engineer (H) Rural Roads

10

(Bridges 6

Roads 4)

(Details given in annexure III)

22.60

6.5479

 

 

 

(Rupees Six crores fifty four lakhs seventy nine thousand only)

5054-Capital outlay on roads and bridges o4-District and other Roads-337-Road work-Schemes in the Ninth Five Year Plan II.State Plan JI-Improvement to Rural Roads with loan assistance from NABARD 16 Major works).

(D.P.code No.5054-04-337-JI-1601)

Bridges Scheme (Chief Engineer (H) NABARD)

27

(Details given in annexure IV)

---

41.5247

 

 

 

 

 

(Rupees Forty one Crores fifty two lakhs forty seven thousand only)

5054-Capital outlay on roads and bridges-04-Major District and Other District Roads-337-Roads and Bridges-Schemes in the Ninth Five Year Plan-II. State Plan JK Improvement to District and Other roads with loan assistance from NABARD 16 Major works.

(D.P.Code No.5054-04-337-JK-1607)

Total Rs.48.0726 Crores.

This order issues with the concurrence of Finance Department vide its U.O.No.975/JS(LSR)/2000-1 dated 10.2.2000.

 

(BY ORDER OF THE GOVERNOR)

M.ABUL HASSAN

SECRETARY TO GOVERNMENT

To

The Chief Engineer Highways, Rural Roads,Chennai-25(w.e)

The Chief Engineer (Highways) NABARD,Chennai 32.

The Deputy General Manager, NABARD 105-106, Nungambakkam High Road, Chennai-34.

The Accountant General, Chennai 18/35/6

The Chief Engineer (Gl.), Highways and Rural Works, Chennai –5.

 

 

Copy to:

The Finance (Resources / PW I) Department,Chennai-9.

The Finance (IFIA) Department, Chennai-9.

All schemes sections in Highways Department, Chennai-9.

/Forwarded/ by order/

SECTION OFFICER.


ABSTRACT

IMPROVEMENTS TO OTHER DISTRICT ROADS

PHASE II

S.NO.

DIVISION

LENGTH TAKEN UP

(KMS)

COST IN RUPEES (Lakhs)

1.

Saidapet

183.89

680.00

2.

Chengalpattu

157.49

701.00

3.

Vellore

218.27

811.00

4.

Villupuram

159.36

604.00

5.

Kallakurichi

172.00

572.00

6.

Cuddalore

191.26

960.00

7.

Tiruvannamalai

255.35

878.00

8.

Ariyalur

142.80

638.50

9.

Trichy

138.45

589.00

10.

Thanjavur

181.37

728.00

11.

Nagapattinam

182.17

658.00

12.

Thiruvarur

123.40

503.00

13.

Pudukkottai

201.80

700.00

14.

Madurai

101.40

466.00

15.

Theni

65.80

290.00

16.

Dindigul

131.40

596.80

17.

Sivaganga

151.62

500.00

18.

Paramakudi

127.60

649.70

19.

Coimbatore

48.12

203.00

20.

Pollachi

74.85

316.00

21.

Erode

108.42

484.00

22.

Gobichettipalayam

86.00

391.00

23.

Ooty

53.45

350.00

24.

Salem

175.42

718.00

25.

Namakkal

106.47

413.00

26.

Krishnagiri

245.79

840.00

27.

Karur

84.50

290.00

28.

Tirunelveli

130.78

580.00

29.

Virudhunagar

224.10

960.00

30.

Tuticorin

153.14

580.00

31.

Nagercoil

110.97

350.00

 

Total

4487.44

18000.00

Sugarcane Roads

415.89

2000.25

Grand Total

4903.33

20000.25


ANNEXURE I

 

SANCTION OF LOAN UNDER RIDF V TAMIL NADU

(Rs.in Lakh)

Sl.No.

Name of Project

District

Poten-tial

(ha/m/

km)

Latest cost

Balan-ce cost

NABARD Loan

Govt Cont

99-00

00-01

01-02

Total

(i)

RU.BRIDGES

1.

Palar at Km 19/2-20/2

Kanchee-puram

883.96

1100.00

1100.00

198.00

396.00

396.00

990.00

110.00

2.

At km 4/6-8 of Mettupalayam

Coimba-tore

116.00

128.90

128.90

23.20

46.40

46.41

116.01

12.89

3.

At km 4/4 of Veerakkal

Dindigul

8.80

12.80

12.80

2.30

4.61

4.61

11.52

1.28

4.

At Km 0/6 of Veerakkal

Dindigul

43.34

76.65

76.65

13.80

27.59

27.59

68.98

7.67

5.

Across Vaigai

Dindigul

91.65

136.20

136.20

24.52

49.03

49.03

122.58

13.62

6.

At Km 8/2 of Alankulam

Virudhu-nagar

92.64

92.64

92.64

16.67

33.35

33.35

83.37

9.27

7.

At Km 0/8 of Thenkarai

Madurai

25.58

33.50

33.50

6.03

12.06

12.06

30.15

3.35

8.

Vaigai Km 0/2-0/7

Madurai

258.00

439.00

439.00

79.02

158.04

158.04

395.10

43.90

9.

At Km 1/6 of Paravai – Adalai road

Madurai

25.28

34.00

34.00

6.12

12.24

12.24

30.60

3.40

10.

Across Vaigai Km 0/4

Siva-

Ganga

220.00

373.00

373.00

67.14

134.28

134.28

335.70

37.30

11

Across Bhavani Mevani –K’

Erode

106.00

177.18

177.18

31.89

63.78

63.79

159.46

17.72

12.

At Km 0/4 of Alangudi Marmadakki road

Puduk-kottai

24.26

29.00

29.00

5.22

10.44

10.44

26.10

2.90

13

At Km 0/10 Balur-Ethapur

Salem

36.68

56.95

56.95

10.25

20.50

20.50

51.25

5.70

14

At Km 2/6 of Thennam-bakkam road

Cudda-lore

25.28

48.00

48.00

8.64

17.28

17.28

43.20

4.80

15.

At Km 3/0 Polur-Pelasur

T.V.Malai

107.00

147.00

147.00

26.46

52.92

52.92

132.30

14.70

16

At Km 2/4 of Gudiyattam

Vellore

19.28

28.85

28.85

5.19

10.38

10.39

25.96

2.89

17

Across Pulicot in Pulicot

Thiru-valluvar

460.00

448.00

448.00

80.64

161.28

161.28

403.20

44.80

18

At Km 7/6 of Chinnasalem

Villu-puram

45.00

73.85

73.85

13.29

26.58

26.59

66.46

7.39

19

On Devanur

Gangapuram

Villu-puram

11.10

14.50

14.50

2.61

5.22

5.22

13.05

1.45

20

At Km 2/4 of Devanur-Gangapuram

Villu-puram

34.12

56.50

56.50

10.17

20.34

20.34

50.85

5.65

21

At Km 5/6 of Vikramanagalm

Peram-balur

84.82

143.00

143.00

25.74

51.48

51.48

128.70

14.30

22

At Km 4/4 of Karaikurichi

Peram-balur

58.96

104.00

104.00

18.72

37.44

37.44

93.60

10.40

23

At Km 18/4 of T.Palur

Peram-balur

14.44

19.20

19.20

3.46

6.91

6.91

17.28

1.92

24

At km 12/4 of T.Palur

Peram-balur

94.30

173.00

173.00

31.14

62.28

62.28

155.70

17.30

25

At km 2/6 of P.K. road

Karur

58.96

81.24

81.25

14.62

29.25

29.25

73.12

8.13

26

At Km 11/4 of Ammapettai

Tiru-varur

26.28

52.00

52.00

9.36

18.72

18.72

46.80

5.20

 

Total

  3188.65

4364.07

4364.07

785.53

1571.03

1571.07

3927.63

436.44


ANNEXURE II

 

 

Sl.N o

Name of Project

District

Poten-tial

(ha/m/

km)

Latest cost

Balance cost

NABARD Loan

Govt Cont

99-00

00-01

01-02

Total

(ii) RU ROADS

1.

N’puram A.P.State Border

Vellore

1.80

24.89

24.89

4.48

8.96

8.96

22.40

2.49

2.

Thimmapatti K’yamman Koli

Vellore

4.40

60.85

60.85

10.95

21.90

21.91

54.76

6.09

3.

K.V.Kottah-B’lli E’pattu

Vellore

8.00

153.46

153.46

27.62

55.24

55.25

138.11

15.35

4.

K.V.Kottah Road-Aravatla

Vellore

8.40

203.99

203.99

36.72

73.44

73.43

183.59

20.40

Total

22.60

443.19

443.19

79.77

159.54

159.55

398.86

44.33

Grand Total

4807.26 4807.26

865.30

1730.57

1730.62

4326.49

480.77

 

/true copy/

 

SECTION OFFICER


ANNEXURE III

R.I.D.F.V

BRIDGES AND ROADS TO BE EXECUTED BY CHIEF ENGINEER (H) RURAL ROADS

DISTRICT: VELLORE LENGTH IN KM

DIVISION: R.R. (H),VELLORE RUPEES IN LAKHS

Sl.

No.

NA-BARD

Sanc-tion

Sl.No.

Name & Location of Project (Name of work)

Length

In Km

Whether

A Plan

Project or not

Nature of invest-ment (type of project)

Specify Rural Roads/Spl. Comp. Plan/Bus Route)

Year of commen-cement of the project

Estimate cost

(Rs. In

Lakhs)

Probable date of comple-tion

Name of Union

Name of marketing

Centres

Remarks

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

(A) RURAL BRIDGES

1.

18

Contrn. Of a bridge at Km 5/0 of the road K.V.Kottah to TN state limit

--

Plan

Project

Rural roads

1999-2000

19.50

31.03.2002

Pernampet

Pernampet

 

2.

19

Constrn. Of a bridge at Km 6/2 of the road K.V.Kottah to TN

Stat e limit

--

Plan Project

Rural roads

1999-2000

31.20

31.03.2002

Pernampet

Pernampet

3.

20

Constrn. Of a bridge at Km 7/0 of the road K.V.Kottah to TN

Stat e limit

--

Plan Project

Rural roads

1999-2000

31.20

31.03.2002

Pernampet

Pernampet

 

4.

21

Constrn. Of a bridge at Km 0/2 of the road Narayanapuram to Andhra State limit

--

Plan Project

Rural roads

1999-2000

31.20

31.03.2002

Natrampalli

Natrampalli

 

5.

22

Constrn. Of a bridge at Km 0/2 of the road Thimmampatti Kanaganatchi-amman Koil

--

Plan

Project

Rural roads

1999-

2000

52.50

31.03.2002

Natrampalli

Natrampalli

 

(a) 165.60

(B) RURAL ROADS

6.

1 Impvts. To Narayana-puram to

Andhra State

Border

1.80

Plan

Project

Rural roads

1999-

2000

24.89

31.03.2002

Natrampalli

Natrampalli

 

7.

2. Impvts. To Thimmam-

Pettai-

Kanaganachi-amman koil Km0/0-4/4

4.40

Plan

Project

Rural

Roads

1999-

2000

60.85

31.03.2002

Natrampalli

Natrampalli

 

8.

3 Impvts. To K.V.Kottah road to

Erukkam

Patti to TN

State limit

8.00

Plan

Project

Rural

Roads

1999-

2000

153.46

31.03.2002

Pernampet

Pernampet

 

9.

4 Impvts. To the road Km 47/2 of K.V.Kottah

Km 4/0-12/4

8.40

Plan

Project

Rural

Roads

1999-

2000

203.99

31.03.2002

Pernampet

Pernampet

 
TOTAL 22.60 (b) 443.19

ANNEXURE III

R.I.D.F.V

BRIDGES AND ROADS TO BE EXECUTED BY CHIEF ENGINEER (H) RURAL ROADS

DISTRICT: DHARMAPURI LENGTH IN KM

DIVISION: R.R. (H), DHARMAPURI RUPEES IN LAKHS

Sl.

No.

NA-BARD

Sanc-tion

Sl.No.

Name & Location of Project (Name of work)

Length

In Km

Whether

A Plan

Project or not

Nature of invest-ment (type of project)

Specify Rural Roads/Spl. Comp. Plan/Bus Route)

Year of commen-cement of the project

Estimate cost

(Rs. In

Lakhs)

Probable date of comple-tion

Name of Union

Name of marketing

Centres

Remarks

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

(a) RURAL BRIDGES

1.

3 Constrn. Of a high level bridge at Km 0/4 of the road Veppanapalli to O.N.Kothur

 

 

(Upto TN State Limit) via Ariyanpalli

--

Plan

Project

Rural

Roads

1999-

2000

46.00

31.03.2002

Veppana-

Palli

Krishna-

giri

( C ) 46.00

(a + b + c) 654.79

 

/true copy/

SECTION OFFICER

HIGHWAYS DEPARTMENT

SECRETARIAT, CHENNAI 600 009.


RIDF PROJECT 18

ANNEXURE IV

 

BRIDGE WORKS TO BE EXECUTED BY CHIEF ENGINEER (H), NABARD

 

Rs. In Lakhs

Sl.No.

Name of Project

District

Poten-tial

(ha/m/

km)

Latest cost

Balance cost

NABARD Loan

Govt Cont

99-00

00-01

01-02

Total

RU BRIDGES

1.

Reconstruction of High level bridge across Palar at Km 19/2-20/2 of Mamandur Uthiramerur road to Thirumukkudal

Kanchee-

Puram

883.96

1100.00

1100.00

198.00

396.00

396.00

990.00

110.00

2.

Construction of a high level bridge across 4/6-8 of Mettupalayam Nellithurai road

Coimba-tore

116.00

128.90

128.90

23.20

46.40

46.41

116.01

12.89

3.

Construction of a minor bridge at Km 4/4 of Veerakkal Village road

Dindigul

8.80

12.80

12.80

2.30

4.61

4.61

11.52

1.28

4.

Reconstruction of High level bridge at Km 0/6 of Veerakkal Village road

Dindigul

43.34

76.65

76.65

13.80

27.59

27.59

68.98

7.67

5.

Construction of a high level bridge across Vaigai at Km 0/2 of Ramanaikan-patty road, connecting Rengappanaicken-patty

Dindigul

91.65

136.20

136.20

24.52

49.03

49.03

122.58

13.62

6.

Reconstruction of a High level bridge at Km 8/2 of Alankulam to District limit

Virudhu-

Nagar

92.64

92.64

92.64

16.67

33.35

33.35

83.37

9.27

7.

Reconstruction of a high level bridge at Km 0/8 of Thenkarai approach road

Madurai

25.58

33.50

33.50

6.03

12.06

12.06

30.15

3.35

8.

Reconstruction of a High level bridge across Vaigai river at Km 0/2-0/7 of Thenkarai Approach road

Madurai

258.00

439.00

439.00

79.02

158.04

158.04

395.10

43.90

9.

Reconstruction of bridge at Km 1/6 of Paravai – Adalai road

Madurai

25.28

34.00

34.00

6.12

12.24

12.24

30.60

3.40

10.

Reconstruction of bridge across Vaigai Km 0/4 Edaikattur approach road

Siva-

Gangai

220.00

373.00

373.00

67.14

134.28

134.28

335.70

37.30

 

11

Construction of high level bridge Across river Bhavani in between Mevani and Kelvani

Erode

106.00

177.18

177.18

31.89

63.78

63.79

159.46

17.72

12.

Reconstruction of High level bridge at Km 0/4 of Alangudi Marmadakki road

Puduk-kottai

24.26

29.00

29.00

5.22

10.44

10.44

26.10

2.90

13

Construction of high level bridge At Km 4/6 Balur-Ethapur road

Salem

36.68

73.50

73.50

13.23

26.46

26.46

66.15

7.35

14

Construction of High level bridge at Km 0/10of Balur – Ethapur road

Salem

36.68

56.95

56.95

10.25

20.50

20.50

51.25

5.70

15.

Reconstruction of High Level bridge at Km 2/6 of Thennambakkam road

Cuddalore

25.28

48.00

48.00

8.64

17.28

17.28

43.20

4.80

16

Construction of bridge at km 3/0 of Polur – Pelasur – Padagam - Mansurabad road

T.V.Malai

107.00

147.00

147.00

26.46

52.92

52.92

132.30

14.70

17

Construction of bridge at km 2/4 of Gudiyattam Municipal limit to Thattaparai road

Vellore

19.28

28.85

28.85

5.19

10.38

10.39

25.96

2.89

18

Construction of high level bridge across Pulicot lake in Pulicot Light house Kuppam road

Tiruvallur

460.00

448.00

448.00

80.64

161.28

161.28

403.20

44.80

19

Construction of high level bridge at km 7/6 of Chinna Salem – Nainarpalayam road

Villu-puram

45.00

73.85

73.85

13.29

26.58

26.59

66.46

7.39

20

Widening of existing minor bridge at km 2/4 of Devanur Gangapuram road

Villu-

Puram

11.10

14.50

14.50

2.61

5.22

5.22

13.05

1.45

21

Construction of high level bridge at km 5/6 of Vikramangalam Kadambur road

Villu-

Puram

34.12

56.50

56.50

10.17

20.34

20.34

50.85

5.65

22

Construction of high level bridge at km 5/6 of Vikramangalam Kadambur road

Peram-

Balur

84.82

143.00

143.00

25.74

51.48

51.48

128.70

14.30

23

Reconstruction of a high level bridge at km 4/4 of Karaikurichi – Arul Mozhi Sripuranthan road

Peram-balur

58.96

104.00

104.00

18.72

37.44

37.44

93.60

10.40

24

Construction of a high level bridge at km 18/4 of T.Palur, Vilangudi road

Peram-balur

14.44

19.20

19.20

3.46

6.91

6.91

17.28

1.92

25

Reconstruction of high level bridge at km 10/4 id T.Palur, Vilangudi road

Peram-balur

94.30

173.00

173.00

31.14

62.28

62.28

155.70

17.30

26

Reconstruction of high level bridge at km 2/6 of Palaviduthi – Kadavur road to D.Edayapatti

Karur

58.96

81.25

81.25

14.62

29.25

29.25

73.12

8.13

27

Reconstruction of a bridge at km 11/4 of Ammapettai – Vaduvur road

Tiruvarur

26.28

52.00

52.00

9.36

18.72

18.72

46.80

5.20

Total

3032.85

4152.47

4152.47

747.43

1494.86

1494.90

3737.19

415.28

/true copy/

Section Officer