GOVERNMENT OF TAMIL NADU
ABSTRACT
Highways and Rural Works Department NABRD RIDF V
Construction/Reconstruction of flood damaged bridges and improvement of Rural Roads to
other District standards under interstate Road Development between Tamil Nadu and Andhra
Pradesh States with loan assistance from NABARD Approved-Orders Issued.
HIGHWAYS (HW 1) DEPARTMENT
G.O.Ms.No.28
Dated 15.2.2000
Read:
- From the Chief engineer (H) Rural Roads Letter
No.16284/97/P1 dated 27.7.99 and 23.1.2000.
- From the Chief Engineer (H) NABARD Letter
No.1706/99/A3 dated 5.11.99 and 24.1.2000.
- From the Deputy General Manager, NABARD Letter
No.NB/TN/9646/RIDF 30/99-2000 dated 12.01.2000.
ORDER:
In the letters first read above, the Chief Engineer (Highways) Rural
roads has sent proposals for improvements to 4 roads to a length of 22.60 kms along with 6
bridges at a cost of Rs.6.5479 Crores, under Interstate Road Development between Tamil
Nadu and Andhra Pradesh States.
2. In the letter second read above, the Chief Engineer (H) NABARD has
sent proposals for Construction/Reconstruction of 27 bridges at a cost of Rs.41.5247
Crores.
3. The NABARD, in their letter third read above have sanctioned the
construction of 33 bridges in rural roads and improvements to 4 Rural Roads to a length of
22.60 Kms in Vellore District., under Inter State Road Development between Tamil Nadu and
Andhra Pradesh States, at a total cost of Rs.48,0726 Crores. Out of this, the Government
contribution would be Rs.4.8077 Crores (10% of the Project Cost) and the NABARD loan
assistance would be Rs.43.2649 Crores. The Chief Engineer (H) Rural Roads and the Chief
Engineer (H) NABARD have requested for issue of administrative sanction for the schemes.
4. The Government have carefully examined the proposals of the Chief
engineer (H) Rural Roads and the Chief Engineer (H), NABARD in the light of the sanction
accorded by NABARD as said in para 3 above and accordingly accord administrative sanction
for 37 works ( 4 road works and 33 bridge works) at a total cost of Rs.48.0726 Crores
(Rupees Forty eight crores, seven lakhs and twenty six thousand only) as detailed in the
Annexures I and II to this order. The Chief Engineer (H), Rural Roads and the Chief
Engineer (H) NABARD are requested to take immediate action for the early completion of the
works.
5. The expenditure sanctioned in para 4 above shall be debited to the
following heads of account:
Name of the
Scheme |
No. of
Works |
Length
In Kms. |
Amount
Rs. In
Crores |
Head of Account |
Rural Roads Scheme
(Chief Engineer (H) Rural Roads |
10
(Bridges 6
Roads 4)
(Details given in annexure III) |
22.60 |
6.5479
(Rupees Six crores fifty four lakhs seventy nine thousand only) |
5054-Capital outlay on
roads and bridges o4-District and other Roads-337-Road work-Schemes in the Ninth Five Year
Plan II.State Plan JI-Improvement to Rural Roads with loan assistance from NABARD 16 Major
works).
(D.P.code No.5054-04-337-JI-1601) |
Bridges Scheme (Chief
Engineer (H) NABARD) |
27
(Details given in annexure IV) |
--- |
41.5247
(Rupees Forty one Crores fifty two lakhs forty seven thousand only) |
5054-Capital outlay on
roads and bridges-04-Major District and Other District Roads-337-Roads and Bridges-Schemes
in the Ninth Five Year Plan-II. State Plan JK Improvement to District and Other roads with
loan assistance from NABARD 16 Major works.
(D.P.Code No.5054-04-337-JK-1607) |
Total Rs.48.0726 Crores.
This order issues with the concurrence of Finance Department vide its
U.O.No.975/JS(LSR)/2000-1 dated 10.2.2000.
(BY ORDER OF THE GOVERNOR)
M.ABUL HASSAN
SECRETARY TO GOVERNMENT
To
The Chief Engineer Highways, Rural Roads,Chennai-25(w.e)
The Chief Engineer (Highways) NABARD,Chennai 32.
The Deputy General Manager, NABARD 105-106, Nungambakkam High Road,
Chennai-34.
The Accountant General, Chennai 18/35/6
The Chief Engineer (Gl.), Highways and Rural Works, Chennai 5.
Copy to:
The Finance (Resources / PW I) Department,Chennai-9.
The Finance (IFIA) Department, Chennai-9.
All schemes sections in Highways Department, Chennai-9.
/Forwarded/ by order/
SECTION OFFICER.
ABSTRACT
IMPROVEMENTS TO OTHER DISTRICT ROADS
PHASE II
S.NO. |
DIVISION |
LENGTH TAKEN UP
(KMS) |
COST IN RUPEES
(Lakhs) |
1. |
Saidapet |
183.89 |
680.00 |
2. |
Chengalpattu |
157.49 |
701.00 |
3. |
Vellore |
218.27 |
811.00 |
4. |
Villupuram |
159.36 |
604.00 |
5. |
Kallakurichi |
172.00 |
572.00 |
6. |
Cuddalore |
191.26 |
960.00 |
7. |
Tiruvannamalai |
255.35 |
878.00 |
8. |
Ariyalur |
142.80 |
638.50 |
9. |
Trichy |
138.45 |
589.00 |
10. |
Thanjavur |
181.37 |
728.00 |
11. |
Nagapattinam |
182.17 |
658.00 |
12. |
Thiruvarur |
123.40 |
503.00 |
13. |
Pudukkottai |
201.80 |
700.00 |
14. |
Madurai |
101.40 |
466.00 |
15. |
Theni |
65.80 |
290.00 |
16. |
Dindigul |
131.40 |
596.80 |
17. |
Sivaganga |
151.62 |
500.00 |
18. |
Paramakudi |
127.60 |
649.70 |
19. |
Coimbatore |
48.12 |
203.00 |
20. |
Pollachi |
74.85 |
316.00 |
21. |
Erode |
108.42 |
484.00 |
22. |
Gobichettipalayam |
86.00 |
391.00 |
23. |
Ooty |
53.45 |
350.00 |
24. |
Salem |
175.42 |
718.00 |
25. |
Namakkal |
106.47 |
413.00 |
26. |
Krishnagiri |
245.79 |
840.00 |
27. |
Karur |
84.50 |
290.00 |
28. |
Tirunelveli |
130.78 |
580.00 |
29. |
Virudhunagar |
224.10 |
960.00 |
30. |
Tuticorin |
153.14 |
580.00 |
31. |
Nagercoil |
110.97 |
350.00 |
| |
Total |
4487.44 |
18000.00 |
Sugarcane Roads |
415.89 |
2000.25 |
Grand Total |
4903.33 |
20000.25 |
ANNEXURE I
SANCTION OF LOAN UNDER RIDF V TAMIL NADU
(Rs.in Lakh)
Sl.No. |
Name of Project |
District |
Poten-tial
(ha/m/
km) |
Latest cost |
Balan-ce cost |
NABARD Loan |
Govt Cont |
99-00 |
00-01 |
01-02 |
Total |
(i) |
RU.BRIDGES |
1. |
Palar at Km
19/2-20/2 |
Kanchee-puram |
883.96 |
1100.00 |
1100.00 |
198.00 |
396.00 |
396.00 |
990.00 |
110.00 |
2. |
At km 4/6-8 of
Mettupalayam |
Coimba-tore |
116.00 |
128.90 |
128.90 |
23.20 |
46.40 |
46.41 |
116.01 |
12.89 |
3. |
At km 4/4 of
Veerakkal |
Dindigul |
8.80 |
12.80 |
12.80 |
2.30 |
4.61 |
4.61 |
11.52 |
1.28 |
4. |
At Km 0/6 of
Veerakkal |
Dindigul |
43.34 |
76.65 |
76.65 |
13.80 |
27.59 |
27.59 |
68.98 |
7.67 |
5. |
Across Vaigai |
Dindigul |
91.65 |
136.20 |
136.20 |
24.52 |
49.03 |
49.03 |
122.58 |
13.62 |
6. |
At Km 8/2 of
Alankulam |
Virudhu-nagar |
92.64 |
92.64 |
92.64 |
16.67 |
33.35 |
33.35 |
83.37 |
9.27 |
7. |
At Km 0/8 of
Thenkarai |
Madurai |
25.58 |
33.50 |
33.50 |
6.03 |
12.06 |
12.06 |
30.15 |
3.35 |
8. |
Vaigai Km
0/2-0/7 |
Madurai |
258.00 |
439.00 |
439.00 |
79.02 |
158.04 |
158.04 |
395.10 |
43.90 |
9. |
At Km 1/6 of
Paravai Adalai road |
Madurai |
25.28 |
34.00 |
34.00 |
6.12 |
12.24 |
12.24 |
30.60 |
3.40 |
10. |
Across Vaigai
Km 0/4 |
Siva-
Ganga |
220.00 |
373.00 |
373.00 |
67.14 |
134.28 |
134.28 |
335.70 |
37.30 |
11 |
Across Bhavani
Mevani K |
Erode |
106.00 |
177.18 |
177.18 |
31.89 |
63.78 |
63.79 |
159.46 |
17.72 |
12. |
At Km 0/4 of
Alangudi Marmadakki road |
Puduk-kottai |
24.26 |
29.00 |
29.00 |
5.22 |
10.44 |
10.44 |
26.10 |
2.90 |
13 |
At Km 0/10
Balur-Ethapur |
Salem |
36.68 |
56.95 |
56.95 |
10.25 |
20.50 |
20.50 |
51.25 |
5.70 |
14 |
At Km 2/6 of
Thennam-bakkam road |
Cudda-lore |
25.28 |
48.00 |
48.00 |
8.64 |
17.28 |
17.28 |
43.20 |
4.80 |
15. |
At Km 3/0
Polur-Pelasur |
T.V.Malai |
107.00 |
147.00 |
147.00 |
26.46 |
52.92 |
52.92 |
132.30 |
14.70 |
16 |
At Km 2/4 of
Gudiyattam |
Vellore |
19.28 |
28.85 |
28.85 |
5.19 |
10.38 |
10.39 |
25.96 |
2.89 |
17 |
Across Pulicot
in Pulicot |
Thiru-valluvar |
460.00 |
448.00 |
448.00 |
80.64 |
161.28 |
161.28 |
403.20 |
44.80 |
18 |
At Km 7/6 of
Chinnasalem |
Villu-puram |
45.00 |
73.85 |
73.85 |
13.29 |
26.58 |
26.59 |
66.46 |
7.39 |
19 |
On Devanur
Gangapuram |
Villu-puram |
11.10 |
14.50 |
14.50 |
2.61 |
5.22 |
5.22 |
13.05 |
1.45 |
20 |
At Km 2/4 of
Devanur-Gangapuram |
Villu-puram |
34.12 |
56.50 |
56.50 |
10.17 |
20.34 |
20.34 |
50.85 |
5.65 |
21 |
At Km 5/6 of
Vikramanagalm |
Peram-balur |
84.82 |
143.00 |
143.00 |
25.74 |
51.48 |
51.48 |
128.70 |
14.30 |
22 |
At Km 4/4 of
Karaikurichi |
Peram-balur |
58.96 |
104.00 |
104.00 |
18.72 |
37.44 |
37.44 |
93.60 |
10.40 |
23 |
At Km 18/4 of
T.Palur |
Peram-balur |
14.44 |
19.20 |
19.20 |
3.46 |
6.91 |
6.91 |
17.28 |
1.92 |
24 |
At km 12/4 of
T.Palur |
Peram-balur |
94.30 |
173.00 |
173.00 |
31.14 |
62.28 |
62.28 |
155.70 |
17.30 |
25 |
At km 2/6 of
P.K. road |
Karur |
58.96 |
81.24 |
81.25 |
14.62 |
29.25 |
29.25 |
73.12 |
8.13 |
26 |
At Km 11/4 of
Ammapettai |
Tiru-varur |
26.28 |
52.00 |
52.00 |
9.36 |
18.72 |
18.72 |
46.80 |
5.20 |
| |
Total |
|
3188.65 |
4364.07 |
4364.07 |
785.53 |
1571.03 |
1571.07 |
3927.63 |
436.44 |
ANNEXURE II
Sl.N o |
Name of Project |
District |
Poten-tial
(ha/m/
km) |
Latest cost |
Balance cost |
NABARD Loan |
Govt
Cont |
99-00 |
00-01 |
01-02 |
Total |
|
(ii)
RU ROADS |
1. |
Npuram
A.P.State Border |
Vellore |
1.80 |
24.89 |
24.89 |
4.48 |
8.96 |
8.96 |
22.40 |
2.49 |
2. |
Thimmapatti
Kyamman Koli |
Vellore |
4.40 |
60.85 |
60.85 |
10.95 |
21.90 |
21.91 |
54.76 |
6.09 |
3. |
K.V.Kottah-Blli
Epattu |
Vellore |
8.00 |
153.46 |
153.46 |
27.62 |
55.24 |
55.25 |
138.11 |
15.35 |
4. |
K.V.Kottah
Road-Aravatla |
Vellore |
8.40 |
203.99 |
203.99 |
36.72 |
73.44 |
73.43 |
183.59 |
20.40 |
|
Total |
|
22.60 |
443.19 |
443.19 |
79.77 |
159.54 |
159.55 |
398.86 |
44.33 |
|
Grand
Total |
|
|
4807.26 |
4807.26 |
865.30 |
1730.57 |
1730.62 |
4326.49 |
480.77 |
/true copy/
SECTION OFFICER
ANNEXURE III
R.I.D.F.V
BRIDGES AND ROADS TO BE EXECUTED BY CHIEF ENGINEER (H) RURAL ROADS
DISTRICT: VELLORE LENGTH IN KM
DIVISION: R.R. (H),VELLORE RUPEES IN LAKHS
Sl.
No. |
NA-BARD
Sanc-tion
Sl.No. |
Name &
Location of Project (Name of work) |
Length
In Km |
Whether
A Plan
Project or not |
Nature of
invest-ment (type of project)
Specify Rural Roads/Spl. Comp. Plan/Bus Route) |
Year of
commen-cement of the project |
Estimate cost
(Rs. In
Lakhs) |
Probable
date of comple-tion |
Name of Union |
Name of
marketing
Centres |
Remarks |
1. |
2. |
3. |
4. |
5. |
6. |
7. |
8. |
9. |
10. |
11. |
12. |
| (A) RURAL BRIDGES |
1. |
18 |
Contrn. Of a bridge at Km 5/0 of
the road K.V.Kottah to TN state limit |
-- |
Plan
Project |
Rural roads |
1999-2000 |
19.50 |
31.03.2002 |
Pernampet |
Pernampet |
|
2. |
19 |
Constrn. Of a bridge
at Km 6/2 of the road K.V.Kottah to TN Stat e limit |
-- |
Plan
Project |
Rural
roads |
1999-2000 |
31.20 |
31.03.2002 |
Pernampet
|
Pernampet |
|
3. |
20 |
Constrn. Of a bridge at Km 7/0 of
the road K.V.Kottah to TN Stat e limit |
-- |
Plan Project |
Rural roads |
1999-2000 |
31.20 |
31.03.2002 |
Pernampet |
Pernampet |
|
4. |
21 |
Constrn. Of a bridge at Km 0/2 of
the road Narayanapuram to Andhra State limit |
-- |
Plan Project |
Rural roads |
1999-2000 |
31.20 |
31.03.2002 |
Natrampalli |
Natrampalli |
|
5. |
22 |
Constrn. Of a bridge at Km 0/2 of
the road Thimmampatti Kanaganatchi-amman Koil |
-- |
Plan
Project |
Rural roads |
1999-
2000 |
52.50 |
31.03.2002 |
Natrampalli |
Natrampalli |
|
(a) 165.60 |
| (B) RURAL ROADS |
6. |
1 |
Impvts. To Narayana-puram to Andhra
State
Border |
1.80 |
Plan
Project |
Rural roads |
1999-
2000 |
24.89 |
31.03.2002 |
Natrampalli |
Natrampalli |
|
7. |
2. |
Impvts. To Thimmam- Pettai-
Kanaganachi-amman koil Km0/0-4/4 |
4.40 |
Plan
Project |
Rural Roads |
1999-
2000 |
60.85 |
31.03.2002 |
Natrampalli |
Natrampalli |
|
8. |
3 |
Impvts. To K.V.Kottah road to Erukkam
Patti to TN
State limit |
8.00 |
Plan
Project |
Rural Roads |
1999-
2000 |
153.46 |
31.03.2002 |
Pernampet |
Pernampet |
|
9. |
4 |
Impvts. To the road Km 47/2 of
K.V.Kottah Km 4/0-12/4 |
8.40 |
Plan
Project |
Rural Roads |
1999-
2000 |
203.99 |
31.03.2002 |
Pernampet |
Pernampet |
|
| TOTAL 22.60 (b)
443.19 |
ANNEXURE III
R.I.D.F.V
BRIDGES AND ROADS TO BE EXECUTED BY CHIEF ENGINEER
(H) RURAL ROADS
DISTRICT: DHARMAPURI LENGTH IN KM
DIVISION: R.R. (H), DHARMAPURI RUPEES IN LAKHS
Sl.
No. |
NA-BARD
Sanc-tion
Sl.No. |
Name &
Location of Project (Name of work) |
Length
In Km |
Whether
A Plan
Project or not |
Nature of
invest-ment (type of project)
Specify Rural Roads/Spl. Comp. Plan/Bus Route) |
Year of
commen-cement of the project |
Estimate cost
(Rs. In
Lakhs) |
Probable
date of comple-tion |
Name of Union |
Name of
marketing
Centres |
Remarks |
1. |
2. |
3. |
4. |
5. |
6. |
7. |
8. |
9. |
10. |
11. |
12. |
| (a) RURAL BRIDGES |
1. |
3 |
Constrn. Of a high
level bridge at Km 0/4 of the road Veppanapalli to O.N.Kothur
(Upto TN State Limit) via Ariyanpalli |
-- |
Plan
Project |
Rural
Roads |
1999-
2000 |
46.00 |
31.03.2002 |
Veppana- Palli |
Krishna- giri |
|
( C ) 46.00 |
(a + b + c)
654.79 |
/true copy/
SECTION OFFICER
HIGHWAYS DEPARTMENT
SECRETARIAT, CHENNAI 600 009.
RIDF PROJECT 18
ANNEXURE IV
BRIDGE WORKS TO BE EXECUTED BY CHIEF ENGINEER (H), NABARD
Rs. In Lakhs
Sl.No. |
Name of Project |
District |
Poten-tial
(ha/m/
km) |
Latest cost |
Balance cost |
NABARD Loan |
Govt Cont |
99-00 |
00-01 |
01-02 |
Total |
|
|
RU
BRIDGES |
|
1. |
Reconstruction
of High level bridge across Palar at Km 19/2-20/2 of Mamandur Uthiramerur road to
Thirumukkudal |
Kanchee-
Puram |
883.96 |
1100.00 |
1100.00 |
198.00 |
396.00 |
396.00 |
990.00 |
110.00 |
2. |
Construction
of a high level bridge across 4/6-8 of Mettupalayam Nellithurai road |
Coimba-tore |
116.00 |
128.90 |
128.90 |
23.20 |
46.40 |
46.41 |
116.01 |
12.89 |
3. |
Construction
of a minor bridge at Km 4/4 of Veerakkal Village road |
Dindigul |
8.80 |
12.80 |
12.80 |
2.30 |
4.61 |
4.61 |
11.52 |
1.28 |
4. |
Reconstruction
of High level bridge at Km 0/6 of Veerakkal Village road |
Dindigul |
43.34 |
76.65 |
76.65 |
13.80 |
27.59 |
27.59 |
68.98 |
7.67 |
5. |
Construction
of a high level bridge across Vaigai at Km 0/2 of Ramanaikan-patty road, connecting
Rengappanaicken-patty |
Dindigul |
91.65 |
136.20 |
136.20 |
24.52 |
49.03 |
49.03 |
122.58 |
13.62 |
6. |
Reconstruction
of a High level bridge at Km 8/2 of Alankulam to District limit |
Virudhu-
Nagar |
92.64 |
92.64 |
92.64 |
16.67 |
33.35 |
33.35 |
83.37 |
9.27 |
7. |
Reconstruction
of a high level bridge at Km 0/8 of Thenkarai approach road |
Madurai |
25.58 |
33.50 |
33.50 |
6.03 |
12.06 |
12.06 |
30.15 |
3.35 |
8. |
Reconstruction
of a High level bridge across Vaigai river at Km 0/2-0/7 of Thenkarai Approach road |
Madurai |
258.00 |
439.00 |
439.00 |
79.02 |
158.04 |
158.04 |
395.10 |
43.90 |
9. |
Reconstruction
of bridge at Km 1/6 of Paravai Adalai road |
Madurai |
25.28 |
34.00 |
34.00 |
6.12 |
12.24 |
12.24 |
30.60 |
3.40 |
10. |
Reconstruction
of bridge across Vaigai Km 0/4 Edaikattur approach road |
Siva-
Gangai |
220.00 |
373.00 |
373.00 |
67.14
|
134.28 |
134.28 |
335.70 |
37.30
|
11 |
Construction of high level bridge Across river Bhavani in between Mevani
and Kelvani |
Erode |
106.00 |
177.18 |
177.18 |
31.89 |
63.78 |
63.79 |
159.46 |
17.72 |
12. |
Reconstruction of High level bridge at Km 0/4 of Alangudi Marmadakki road |
Puduk-kottai |
24.26 |
29.00 |
29.00 |
5.22 |
10.44 |
10.44 |
26.10 |
2.90 |
13 |
Construction of high level bridge At Km 4/6 Balur-Ethapur road |
Salem |
36.68 |
73.50 |
73.50 |
13.23 |
26.46 |
26.46 |
66.15 |
7.35 |
14 |
Construction of High level bridge at Km 0/10of Balur Ethapur road |
Salem |
36.68 |
56.95 |
56.95 |
10.25 |
20.50 |
20.50 |
51.25 |
5.70 |
15. |
Reconstruction of High Level bridge at Km 2/6 of Thennambakkam road |
Cuddalore |
25.28 |
48.00 |
48.00 |
8.64 |
17.28 |
17.28 |
43.20 |
4.80 |
16 |
Construction of bridge at km 3/0 of Polur Pelasur Padagam -
Mansurabad road |
T.V.Malai |
107.00 |
147.00 |
147.00 |
26.46 |
52.92 |
52.92 |
132.30 |
14.70 |
17 |
Construction of bridge at km 2/4 of Gudiyattam Municipal limit to
Thattaparai road |
Vellore |
19.28 |
28.85 |
28.85 |
5.19 |
10.38 |
10.39 |
25.96 |
2.89 |
18 |
Construction of high level bridge across Pulicot lake in Pulicot Light
house Kuppam road |
Tiruvallur |
460.00 |
448.00 |
448.00 |
80.64 |
161.28 |
161.28 |
403.20 |
44.80 |
19 |
Construction of high level bridge at km 7/6 of Chinna Salem
Nainarpalayam road |
Villu-puram |
45.00 |
73.85 |
73.85 |
13.29 |
26.58 |
26.59 |
66.46 |
7.39 |
20 |
Widening of existing minor bridge at km 2/4 of Devanur Gangapuram road |
Villu-
Puram |
11.10 |
14.50 |
14.50 |
2.61 |
5.22 |
5.22 |
13.05 |
1.45 |
21 |
Construction of high level bridge at km 5/6 of Vikramangalam Kadambur road |
Villu-
Puram |
34.12 |
56.50 |
56.50 |
10.17 |
20.34 |
20.34 |
50.85 |
5.65 |
22 |
Construction of high level bridge at km 5/6 of Vikramangalam Kadambur road |
Peram-
Balur |
84.82 |
143.00 |
143.00 |
25.74 |
51.48 |
51.48 |
128.70 |
14.30 |
23 |
Reconstruction of a high level bridge at km 4/4 of Karaikurichi
Arul Mozhi Sripuranthan road |
Peram-balur |
58.96 |
104.00 |
104.00 |
18.72 |
37.44 |
37.44 |
93.60 |
10.40 |
24 |
Construction of a high level bridge at km 18/4 of T.Palur, Vilangudi road |
Peram-balur |
14.44 |
19.20 |
19.20 |
3.46 |
6.91 |
6.91 |
17.28 |
1.92 |
25 |
Reconstruction of high level bridge at km 10/4 id T.Palur, Vilangudi road |
Peram-balur |
94.30 |
173.00 |
173.00 |
31.14 |
62.28 |
62.28 |
155.70 |
17.30 |
26 |
Reconstruction of high level bridge at km 2/6 of Palaviduthi
Kadavur road to D.Edayapatti |
Karur |
58.96 |
81.25 |
81.25 |
14.62 |
29.25 |
29.25 |
73.12 |
8.13 |
27 |
Reconstruction of a bridge at km 11/4 of Ammapettai Vaduvur road |
Tiruvarur |
26.28 |
52.00 |
52.00 |
9.36 |
18.72 |
18.72 |
46.80 |
5.20 |
Total |
|
3032.85 |
4152.47 |
4152.47 |
747.43 |
1494.86 |
1494.90 |
3737.19 |
415.28 |
/true copy/
Section Officer
|